Home / Browse projects / Pune, Maharashtra / SHREERAM EUPHORIA
SHREERAM EUPHORIA
By RR REALTY
RG-MH-27352 · RERA P52100045418 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREERAM EUPHORIA is a Mixed project by RR REALTY in Pune, Maharashtra, registered with MahaRERA as P52100045418 on 18 May 2022. Possession is promised by 31 Mar 2028. The completion date has moved by 36 months from the original filing. 38 of the 130 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameSHREERAM EUPHORIA
- TypeMixed
- Location
- LOHEGAON
- LOHGAON
- Haveli
- Pune
- 411047
- Pincode411047
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100045418
- ReraGenie IDRG-MH-27352
Builder
- NameRR REALTY
- Entity typePartnership
- PartnersRohit Rajendra Agarwal, Reshma Rajendra Agarwal, Ramesh Baban Moze
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 May 2022
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 31 Mar 2025)
- Buildings2 building records
- Documents filed99 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 14 | 10 | 68 | 13 | 81 |
| Wing B | NA | 6 | 6 | 34 | 15 | 49 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
Wing A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Wing B27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed154
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A | 67 | 10 | 77 |
| Wing B | 68 | 9 | 77 |
Land and ownership8
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RR REALTY | - | Pune |
| TUKARAM YASHWANT SATHE | Lahagaon | Pune |
| SULABAI TUKARAM SATHE | Lahagaon | Pune |
| SUREKHA TANAJI SATHE | Lahagaon | Pune |
| PRANAY TANAJI SATHE | Lahagaon | Pune |
| SIDDHI TANAJI SATHE | Lahagaon | Pune |
| SHWETA TANAJI SATHE | Lahagaon | Pune |
| LATA MADHUKAR PHUGE | Lahagaon | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Design Synthesis |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | Vikas Abhang |
| Partner | Role in project |
|---|---|
| RR REALTY | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe would like to bring to your kind attention that Wing B has been incorporated as an additional component in the ongoing project. The Commencement Certificate for Wing B has been duly issued on 23rd May 2025 by the competent authority. In light of this development and the consequent increase in the scope of work, we hereby request an extension for the overall project timeline to accommodate the construction and completion of Wing B in compliance with regulatory and quality standards. We seek your support and approval for the revised timeline, and we remain committed to ensuring that all neces
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Shreeram Euphoria as on March 2026.pdf | 20 Apr 2026 |
| Form 2File: Form 2 - Shreeram Euphoria as on March 2026.pdf | 20 Apr 2026 |
| Form 3File: Form 3 - Shreeram Euphoria as on March 2026.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeram Euphoria as on March 2026.pdf | 20 Apr 2026 |
| Form 1File: Form 1 - Shreeram Euphoria as on Sept 2025.pdf | 20 Apr 2026 |
| Form 2File: Form 2 - Shreeram Euphoria as on March 2025.pdf | 20 Apr 2026 |
| Form 3File: Form 3- Shreeram Euphoria- 31-03-2025.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeram Euphoria as on Sept 2025.pdf | 20 Apr 2026 |
| Form 1File: Form 1 - Shreeram Euphoria as on March 2026.pdf | 20 Apr 2026 |
| Form 2File: Form 2 - Shreeram Euphoria as on March 2026.pdf | 20 Apr 2026 |
| Form 3File: Form 3 - Shreeram Euphoria as on Dec 2025.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeram Euphoria as on Dec 2025.pdf | 20 Apr 2026 |
| Form 1File: Form 1 - Shreeram Euphoria as on June 2025.pdf | 2 Jan 2026 |
| Form 2File: Form 2 - Shreeram Euphoria as on June 2025(Signed).pdf | 2 Jan 2026 |
| Form 3File: Form 3 - Shreeram Euphoria as on June 2025.pdf | 2 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeram Euphoria as on June 2025(Signed).pdf | 2 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5- Shreeram Euphoria as on 2024-25.pdf | 30 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2025.pdf | 26 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf | 24 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2).pdf | 24 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29_.pdf | 24 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 24 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Declaration Form5 2024-25.pdf | 24 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Jul 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf | 18 Jul 2025 |
| Declaration about Commencement CertificateFile: Format D.pdf | 18 Jul 2025 |
| Other - TechnicalFile: PERT.pdf | 18 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf | 18 Jul 2025 |
| Declaration in FORM BFile: Form B.pdf | 4 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SE (2).pdf | 4 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf | 4 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025 (1).pdf | 4 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March 2025 (2).pdf | 4 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 (5).pdf | 4 Jul 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 4 Jul 2025 |
| Other - TechnicalFile: Pert Chart.pdf | 4 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A(2022-23).pdf | 4 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A(2023-24).pdf | 4 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- 2023-24 Sign required.pdf | 4 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria- 31-03-2025.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeram Euphoria as on March 2025.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Euphoria.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria- 31-12-2024.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeram Euphoria as on Dec 2024.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeram Euphoria as on Sep 2024.pdf | 19 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shreeram Euphoria-FY 2023-24.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria- 30-09-2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeram Euphoria as on 30-09-2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeram Euphoria as on June 2024.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria- 30th June 2024.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeram Euphoria as on March 2024.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeram Euphoria as on March 2024.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeram Euphoria as on March 2024.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria- 31 march 2024.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Shreeram Euphoria as on Dec 2023.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeram Euphoria as on Dec 2023.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeram Euphoria as on Dec 2023.pdf | 16 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria- 31-12-2023.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shreeram Euphoria as on 19-10-2023.pdf | 25 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeram Euphoria as on September 2023.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria as on 30-09-2023.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Shreeram Euphoria as on 2022-23.pdf | 2 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shreeram Euphoria_compressed.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeram Euphoria as on March 2023.pdf | 3 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeram Euphoria as on June 2023.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria as on 31-03-2023.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Shreeram Euphoria as on 30-06-2023.pdf | 3 Aug 2023 |
| Proforma of Allotment letterFile: Letter of Allotment.pdf | 14 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan 28 Apr 2022_compressed.pdf | 29 Apr 2022 |
| Declaration about Commencement CertificateFile: r r realty2.pdf | 28 Apr 2022 |
| Building plan approval or NA orderFile: 1-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 2-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 3-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 4-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 5-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 6-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 7-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 8-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 9-10_compressed.pdf | 14 Apr 2022 |
| Building plan approval or NA orderFile: 10-10_compressed.pdf | 14 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREERAM EUPHORIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LOHEGAON13,700+ in Pune
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Builder: RR REALTY
RR REALTY has 1 registration on MahaRERA, including SHREERAM EUPHORIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHREERAM EUPHORIA is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREERAM EUPHORIA?
The registered promoter entity is RR REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREERAM EUPHORIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREERAM EUPHORIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREERAM EUPHORIA?
The professionals named in the filing: Architect: Design Synthesis; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Vikas Abhang. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREERAM EUPHORIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback