Home / Browse projects / Nashik, Maharashtra / Shreeram Empire
Shreeram Empire
By Naman Shailesh Shah Prop of Sun Capital Builders and Developers
RG-MH-57114 · RERA P51600076882 · Last updated on MahaRERA portal: 28 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shreeram Empire is a Commercial project by Naman Shailesh Shah Prop of Sun Capital Builders and Developers in Nashik, Maharashtra, registered with MahaRERA as P51600076882 on 3 Jul 2024. Possession is promised by 31 Mar 2027. 0 of the 24 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameShreeram Empire
- TypeCommercial
- Location
- Nashik
- 422002
- Pincode422002
- RERA no.P51600076882
- ReraGenie IDRG-MH-57114
Builder
- NameNaman Shailesh Shah Prop of Sun Capital Builders and Developers
- Entity typeIndividual
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jul 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 28 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shreeram Empire | NA | 8 | 7 | 0 | 24 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.
Shreeram Empire: 76% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed70
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership16
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Varsha Vinayak Apte | Nashik | Nashik |
| Archana Yogin Kulkarni | Nashik | Nashik |
| Shailaja Arvind Kulkarni | Nashik | Nashik |
| VijayTekchand Tanna | Nashik | Nashik |
| Pallavi Rajendra Shah | Nashik | Nashik |
| Prakash Sadashiv Ghadi | Nashik | Nashik |
| Shriniwas Shamrao Parnerkar | Nashik | Nashik |
| Shripal Rajendra Shah | Nashik | Nashik |
| Sharad Dattatraya Morankar | Nashik | Nashik |
| Neeta Sharad Morankar | Nashik | Nashik |
| Jayant Manohar Kulkarni HUF | Nashik | Nashik |
| Revati Jayant Kulkarni | Nashik | Nashik |
| Shailesh Keshavlal Shah | Nashik | Nashik |
| Yogin Arvind Kulkarni | Nashik | Nashik |
| Parag Jayant Kulkarni | Nashik | Nashik |
| M/s Kulkarni Combines (Partnership Firm) | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shreeram Empire | NA | Rs 5.00 cr | Rs 2.41 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Pranav Solanke |
| Engineer | Sudarshan Anawade |
| Chartered Accountant | CA Akshay Ashok Shah |
| Chartered Accountant | Anudnya Abhaykumar Mehta |
| Partner | Role in project |
|---|---|
| Naman Shailesh Shah Prop of Sun Capital Builders and Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jun 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Final Signature 31-12-2025.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Form 1 Final Signature 31-03-2026.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: Form 2 Final Signature 31-12-2025.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: Form 2 Final Signature 31-03-2026.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: Form 3 Final Signature 31-12-2025.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: Form 3 Final Signature 31-03-2026.pdf | 28 May 2026 |
| Form 1File: form 1 shree ram Mar 25.pdf | 24 Feb 2026 |
| Form 2File: form 2 shree ram mar 25.pdf | 24 Feb 2026 |
| Form 3File: form 3 shree ram mar 25.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: form 3 shree ram mar 25.pdf | 24 Feb 2026 |
| Form 1File: form 1 shree ram Jun 25.pdf | 24 Feb 2026 |
| Form 2File: form 2 shree ram Jun 25.pdf | 24 Feb 2026 |
| Form 3File: form 3 shree ram Jun 25.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: form 3 shree ram Jun 25.pdf | 24 Feb 2026 |
| Form 1File: form 1 shree ram sep 25.pdf | 24 Feb 2026 |
| Form 2File: form 2 shree ram sep 25.pdf | 24 Feb 2026 |
| Form 3File: form 3 shree ram sep 25.pdf | 24 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: form 3 shree ram sep 25.pdf | 24 Feb 2026 |
| Form 1File: Form 1.pdf | 5 Feb 2026 |
| Form 2File: Form 2_11zon.pdf | 5 Feb 2026 |
| Form 3File: Form 3_11zon.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Form 3_11zon.pdf | 5 Feb 2026 |
| Form 1File: Form 1_11zon.pdf | 5 Feb 2026 |
| Form 2File: Form 2_11zon.pdf | 5 Feb 2026 |
| Form 3File: Form 3_11zon.pdf | 5 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Form 3_11zon.pdf | 5 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_11zon.pdf | 18 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 18 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_11zon.pdf | 18 Mar 2025 |
| Other - LegalFile: Notice - Reply.pdf | 18 Mar 2025 |
| Declaration about Commencement CertificateFile: Format - D.pdf | 24 Jun 2024 |
| Declaration in FORM BFile: Form B - Developers.pdf | 24 Jun 2024 |
| Declaration in FORM BFile: Form B - Land Owner.pdf | 24 Jun 2024 |
| Copy of the legal title reportFile: Format A - Legal 10-6-24_compressed.pdf | 14 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3_11zon.pdf | 14 Jun 2024 |
| Other - TechnicalFile: Annexure A 50-2024 pdf.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - FINAL BANK.pdf | 25 Apr 2024 |
| Other - LegalFile: Annexure A 50-2024 pdf.pdf | 16 Apr 2024 |
| Building plan approvalFile: Building Plan - Scan_11zon.pdf | 21 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan - Scan_11zon.pdf | 21 Feb 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200296154373_For_Asset_Based_Search_07_02_2024_19_17_33_234.pdf | 7 Feb 2024 |
| Layout approvalFile: LAY OUT NA ORDER PDF_11zon.pdf | 22 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: LAY OUT NA ORDER PDF_11zon.pdf | 22 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_4_11zon.pdf | 22 Jan 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE RERA DRAFT-1.pdf | 22 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement to sale.pdf | 22 Jan 2024 |
| Other - LegalFile: Development Agreement_11zon.pdf | 22 Jan 2024 |
| PAN CardFile: Naman Shah - Pan.pdf | 20 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration - Finance_4_11zon.pdf | 20 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration - Legal_5_11zon.pdf | 20 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Declaration - Finance_4_11zon.pdf | 20 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Declaration - Legal_5_11zon.pdf | 20 Jan 2024 |
| CERSAI detailsFile: Declaration - Cersai_3_11zon.pdf | 20 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_1_11zon.pdf | 20 Jan 2024 |
| Proforma of Allotment letterFile: New Allotment Letter Final - PDF.pdf | 20 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter_6_11zon.pdf | 20 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shreeram Empire on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
THE CHOUPAAL
KALANTRI AND BANG PROPERTIES
Sai Pride
Jay Infrastructures
Nayantara Presidency Phase 3
Pancharatna Builcon Pvt. Ltd
Nayantara Presidency Phase 4
Pancharatna Builcon Pvt. Ltd
TRUKONS BUSINESS PARK
TEZVED BUILDCON LLP
Avenue Flora
The Avenue NX
See every Nashik project, with the district possession charts
Builder: Naman Shailesh Shah Prop of Sun Capital Builders and Developers
Naman Shailesh Shah Prop Of Sun Capital Builders and Developers has 2 registrations on MahaRERA, including Yashoda Residency and Shreeram Empire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Shreeram Empire is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shreeram Empire?
The registered promoter entity is Naman Shailesh Shah Prop of Sun Capital Builders and Developers, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shreeram Empire?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shreeram Empire?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shreeram Empire?
The professionals named in the filing: Architect: Pranav Solanke; Engineer: Sudarshan Anawade; Chartered Accountant: CA Akshay Ashok Shah; Chartered Accountant: Anudnya Abhaykumar Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shreeram Empire?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback