De-registered Litigation declared Residential / Group Housing project

SHREEPATI SKIES

By SHREEPATI SKIES

RG-MH-20042 · RERA P51900003092 · Last updated on MahaRERA portal: 22 Dec 2022

Source: official MahaRERA filing

Red flags

  • De-registered
  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 42 documents Report an error

SHREEPATI SKIES is a Residential / Group Housing project by SHREEPATI SKIES in Mumbai City, Maharashtra, registered with MahaRERA as P51900003092 on 4 Aug 2017. Possession is promised by 30 Dec 2026. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHREEPATI SKIES
  • TypeResidential / Group Housing
  • Location
    • Tukaram Javji Marg
    • Mumbai City
    • 400007
  • Pincode400007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003092
  • ReraGenie IDRG-MH-20042

Builder

  • NameSHREEPATI SKIES
  • Entity typeOthers
  • Named personsRAJENDRA R CHATURVEDI, TAPAS CHATURVEDI

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA630000
WING BNA00000
WING CNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed320

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots320
Open Space320

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,238 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMunicipal Corporation Of Greater Mumbai
Permissible FSI37120.54
Proposed, not sanctioned16,896 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOWALIA TANK BRANCH GRANTROAD MUMBAI -36

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND SAMEL
ArchitectB.N. Shah & Associates
EngineerSunil Sohani
Chartered AccountantJain Ashwani & Co.
Chartered AccountantBansal & Co. LLP
Chartered AccountantDamyanti Gupta
PartnerRole in project
SHREEPATI SKIES-

Litigation declared6

CaseCourtStatus
1263/2002HIGH COURTDISPOSED
2329/2012HIGH COURTDISPOSED
2348/2012HIGH COURTDISPOSED
2976/2014HIGH COURTDISPOSED
978/2018High CourtDISPOSED
1263/2002high CourtClosed

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000056630PROZONE DEVELOPERS & REALTORS PRIVATE LIMITEDM/s Shreepati Skies18/10/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed42

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Foreclosure of the ProjectFile: DECLARATION FORM 4.pdf22 Dec 2022
Foreclosure of the ProjectFile: Cancellation of RERA 02-12-2022.pdf13 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2 _Eng certificate.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SUNIL SOHANI (Civil Engineer).pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1 _Architect certificate.pdf4 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE _compressed.pdf4 Oct 2022
Certificates of CA (Form 3)File: Form 3_compressed.pdf4 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Skies form -5.pdf3 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: skies form 5.pdf14 Apr 2021
OtherFile: MHADA NOC upload.pdf18 Mar 2021
OtherFile: Penalty Payment Ack.pdf6 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 _ Architect Certificate.pdf14 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 _Engineer Certificate.pdf14 Nov 2019
Certificates of CA (Form 3)File: Form 3 Skies CA cert.pdf14 Nov 2019
OtherFile: Shreepati Skeis _ Project Status.pdf28 Aug 2019
Certificates of CA (Form 5)File: S SKIES FORM 5.pdf24 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Rera Certificate 31-03-2018.pdf30 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 31-03-2018.pdf30 Oct 2018
Certificates of CA (Form 3)File: CA CSR SKIES MARCH 2018.pdf29 Oct 2018
Layout approvalFile: skies-lay.pdf26 Mar 2018
Copy of Layout Approval (in case of layout)File: skies-lay.pdf26 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf31 Oct 2017
Certificates of CA (Form 3)File: SHREEPATI SKIES.pdf31 Oct 2017
Layout approvalFile: Architect Certificate.pdf24 Jul 2017
Building plan approvalFile: IOD_16-02-2008-.pdf24 Jul 2017
PAN CardFile: PAN_Shreepati Skies.pdf24 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE CS NO_309.pdf24 Jul 2017
Details of encumbrancesFile: SHREEPATI SKIES.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: Architect Certificate.pdf24 Jul 2017
Building Plan Approval (IOD)File: IOD_16-02-2008-.pdf24 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC-.pdf24 Jul 2017
Declaration in FORM BFile: FORM B SHREEPATI SKIES.pdf24 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_24TH JULY 2017.pdf24 Jul 2017
Certificates of CA (Form 3)File: Chartered Accountant Certificate.pdf24 Jul 2017
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf24 Jul 2017
OtherFile: CIVIL AVIATION NOC.pdf24 Jul 2017
OtherFile: HIGH RISE NOC.pdf24 Jul 2017
OtherFile: MHADA NOC.pdf24 Jul 2017
OtherFile: ENVIROMENTAL CLEARANCE.pdf24 Jul 2017
OtherFile: CFO NOC.pdf24 Jul 2017

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEPATI SKIES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai City780+ in Mumbai City

2 kmSHREEPATI SKIESCompleted 16Lapsed / revoked 19Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: SHREEPATI SKIES

SHREEPATI SKIES has 1 registration on MahaRERA, including SHREEPATI SKIES. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that SHREEPATI SKIES shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREEPATI SKIES is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEPATI SKIES?

The registered promoter entity is SHREEPATI SKIES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEPATI SKIES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREEPATI SKIES?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREEPATI SKIES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEPATI SKIES?

The professionals named in the filing: Architect: MILIND SAMEL; Architect: B.N. Shah & Associates; Engineer: Sunil Sohani; Chartered Accountant: Jain Ashwani & Co.; Chartered Accountant: Bansal & Co. LLP; Chartered Accountant: Damyanti Gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEPATI SKIES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEPATI SKIES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEPATI SKIES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.