ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Shreepati Amara

Registered No litigation declared Others project

Shreepati Amara

By M/s Rudra Lifespaces

RG-MH-19588 · RERA P52000078541 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 76%
63 of 111Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Shreepati Amara is a Others project by M/s Rudra Lifespaces in Raigarh, Maharashtra, registered with MahaRERA as P52000078541 on 21 Dec 2024. Possession is promised by 30 Jun 2027. 48 of the 111 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameShreepati Amara
  • TypeOthers
  • Location
    • Plot No. 15
    • Sector - 4
    • Panvel
    • Karanjade
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000078541
  • ReraGenie IDRG-MH-19588

Builder

  • NameM/s Rudra Lifespaces
  • Entity typePartnership

Key dates

this monthRegisteredDec 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Dec 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed59 files

Current status

43%48 of 111 units booked
55.9%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA8835641
B Wing and C WingNA8870070

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 76%.

A wing50%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks76%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.66%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
B Wing and C Wing38%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises18%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks32%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.18%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70
BuildingClosed/CoveredTotal
A wing2323
B Wing and C Wing4747

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,650 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
Madhav Maruti AngreNavi Mumbai (M Corp.)Thane
Gulab Chandrakant Kadusalokh t needRaigarh
Manda Mohan GaikarKaranjadeRaigarh

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation Of Maharashtra Ltd
Permissible FSI6084.44
Proposed, not sanctioned6,084 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD, SHOP NO 1 AND 2, VINAYAK AVADH, PLOT NO 72, SECTOR 3, KARANJADE, 410206 MAHARASHTRA
Estimated costRs 13.47 cr
Cost incurredRs 7.53 cr
Work done55.92%
BuildingWingEstimatedIncurred
B Wing and C WingNARs 5.32 crRs 4.56 cr
-NARs 4.68 cr-
A wingNARs 3.47 crRs 2.98 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel
EngineerSubramanya Rao
EngineerPankaj Mavjibhai Ramani
Chartered AccountantDeepesh A Shah
Chartered AccountantAshok T Upadhye
PartnerRole in project
M/s Rudra Lifespaces-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 RL signed.pdf25 Apr 2026
Withdrawal Update Form 2File: form 2 Rudra.pdf25 Apr 2026
Withdrawal Update Form 3File: Form3 FY 25-26 Q4 RL to upload.pdf25 Apr 2026
Form 2A (FY 2025-2026)File: form 2A 4-15 rudra.pdf25 Apr 2026
Form 2A (FY 2024-2025)File: Rudra Lifespaces-Form-2A_11zon.pdf27 Mar 2026
Withdrawal Update Form 1File: FORM 1 JAN 26 ARCHTICH 4-15.pdf20 Jan 2026
Withdrawal Update Form 2File: form 2 Q3 engineer cert2 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 FY 25-26 Q3 signed.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf27 Oct 2025
Withdrawal Update Form 2File: form 2 4-15 241025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form3 To Signed.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Rudra Lifespaces.pdf18 Sep 2025
Withdrawal Update Form 1File: Architech certificate form 1 sign.pdf31 Jul 2025
Withdrawal Update Form 2File: form 2 scan copy.pdf31 Jul 2025
Withdrawal Update Form 3File: Form3 Q1 FY 2025-26.pdf31 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rudra Lifespaces-Form-2A_compressed.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-CA Certificate-RL Q4 Signed.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Form 1 (31-03-2025)-01_compressed.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (31-12-2024)_compressed.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3_compressed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3_compressed.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (31-12-2024)_compressed.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3_compressed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3_compressed.pdf17 Jan 2025
Building plan approvalFile: 4 CC Drawing highlighted for Upload_compressed_11zon.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 For Upload.pdf29 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 CC Drawing highlighted for Upload_compressed_11zon.pdf29 Nov 2024
Other - LegalFile: 1 TP.pdf29 Nov 2024
Other - LegalFile: 1 Lease Agreement_11zon.pdf29 Nov 2024
Deviation Report with respect to model copy of AgreementFile: 2 DEVIATION REPORT- Rudra Lifespace.pdf29 Nov 2024
Proforma of Agreement for saleFile: 2 AGREEMENT FOR SALE - Rudra Lifespace for Upload.pdf29 Nov 2024
Other - TechnicalFile: 24 Annexure A.pdf21 Nov 2024
Other - LegalFile: 34 CC EMAIL to RERA.pdf15 Nov 2024
Declaration about Commencement CertificateFile: 8 Declaration about CC Annexure1.pdf15 Nov 2024
Copy of the legal title reportFile: 29 SEARCH TITLE REPORT.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 32 FORM 1 UPLOAD.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 33 Form 2.pdf14 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 30 Format A.pdf14 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 25 FORMAT B_compressed.pdf14 Nov 2024
Layout approvalFile: 17 No Layout Certificate.pdf12 Nov 2024
PAN CardFile: 5 Rudra lifespaces-Pan card.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: 6 No Encumbrance to Finance.pdf12 Nov 2024
Details of encumbrances concerned to FinanceFile: 7 No Encumbrance on Legal.pdf12 Nov 2024
Copy of Layout Approval (in case of layout)File: 17 No Layout Certificate.pdf12 Nov 2024
Proforma of Allotment letterFile: 28 ALLOTMENT LETTER- Rudra Lifespace.pdf12 Nov 2024
Declaration in FORM BFile: 24 Form b promoter.pdf12 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: 20 CC.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: 9 Sold Unsold Declaration.pdf12 Nov 2024
CERSAI detailsFile: 10 CERSAI.pdf12 Nov 2024
Deviation Report with respect to Allotment letterFile: 16 No deviation allotment.pdf12 Nov 2024
Details of encumbrances concerned to LegalFile: 6 No Encumbrance to Finance.pdf12 Nov 2024
Details of encumbrances concerned to LegalFile: 7 No Encumbrance on Legal.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 12 Other real estate project AMR.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Other real estate MR.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Other real estate project RT.pdf12 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: 19 Secured and Um Secured Loan.pdf12 Nov 2024

How this compares with Raigarh

43%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shreepati Amara on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

Builder: M/s Rudra Lifespaces

M/s Rudra Lifespaces has 1 registration on MahaRERA, including Shreepati Amara. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Shreepati Amara is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shreepati Amara?

The registered promoter entity is M/s Rudra Lifespaces, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shreepati Amara?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shreepati Amara?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shreepati Amara?

The professionals named in the filing: Architect: Atul Patel; Engineer: Subramanya Rao; Engineer: Pankaj Mavjibhai Ramani; Chartered Accountant: Deepesh A Shah; Chartered Accountant: Ashok T Upadhye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shreepati Amara?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shreepati Amara. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shreepati Amara to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.