SHREEPATI 171
RG-MH-17571 · RERA P52000054956 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEPATI 171 is a Others project by SIDDHIVINAYAK HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000054956 on 21 Feb 2024. The registration is recorded completed; possession was promised by 31 Dec 2026. 24 of the 59 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREEPATI 171
- TypeOthers
- Location
- PLOT NO 171 SECTOR 1
- PUSHPAK NODE NAVI MUMBAI
- Vadghar (CT)
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054956
- ReraGenie IDRG-MH-17571
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Feb 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed68 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREEPATI 171 | NA | 7 | 7 | 52 | 7 | 59 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
SHREEPATI 171: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NILESH NAMDEV GAIKWAD | Pargaon | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREEPATI 171 | NA | Rs 5.35 cr | Rs 4.74 cr |
| - | NA | Rs 22.30 lakh | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL ARCHITECTS |
| Engineer | B S SUKTHANKAR AND ASSOCIATES |
| Engineer | Sk Consultants & Engineering |
| Engineer | Hrushikesh Vilas Mindhe |
| Engineer | Sanjay Parshuram Mhatre |
| Chartered Accountant | A T UPADHYE AND CO |
| Chartered Accountant | DEEPESH SHAH AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SIDDHIVINAYAK HOMES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC SH.pdf | 29 May 2026 |
| Withdrawal Update Form 1File: Form no -1 plot -171.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: Form2 SIGN.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: Form no-3 CA Siddhivinayak homes.pdf | 30 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: form no-1 atul patel plot -171.pdf | 22 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engg Dec-2025.pdf | 22 Jan 2026 |
| Withdrawal Update Form 3File: Form3 signed for upload.pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Home sep 25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Shreepati 171 for upload.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form3 signed for upload.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 -Siddhivinayak Homes.pdf | 18 Sep 2025 |
| Withdrawal Update Form 1File: Form no -1 p-171.pdf | 5 Aug 2025 |
| Withdrawal Update Form 2File: Form -2 for Upload.pdf | 5 Aug 2025 |
| Withdrawal Update Form 3File: CA Form3 25-26 Q1 signed.pdf | 5 Aug 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate SH Q4.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 - march 2025.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for upload_compressed.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 enggi.pdf | 13 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 171-1-PUSHPAK RERA (2024 SEPTEMBER) signed.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreepati 171 - September 2024 sined.pdf | 19 Oct 2024 |
| Building plan approvalFile: ACC DRG_11zon.pdf | 18 Oct 2024 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 18 Oct 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER- SIDDHIVINAYAK HOMES- PLOT NO 171 SECTOR 01 VADGHAR.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 CA Certificate-SH for upload.pdf | 18 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf | 18 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ACC DRG_11zon.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf | 18 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-SIDDHIVINAYAK HOMES- PLOT NO 171 SECTOR 01 VADGHAR.pdf | 18 Oct 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE - SIDDHIVINAYAK HOMES- PLOT NO 171 SECTOR 01 VADGHAR.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5 SH signed.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate signed.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no-1 shreepati 271.pdf | 23 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold declaration - SH.pdf | 22 Jul 2024 |
| Proforma of Agreement for saleFile: Model of Agreement for Sale.pdf | 9 Feb 2024 |
| Other - LegalFile: Annexure 'A' - Declaration-Promoter.pdf | 9 Feb 2024 |
| Other - LegalFile: Agreement to Lease.pdf | 9 Feb 2024 |
| Other - TechnicalFile: Email from CIDCO to RERA for CC.pdf | 9 Feb 2024 |
| Layout approvalFile: 9 No Layout certificate.pdf | 23 Jan 2024 |
| Building plan approvalFile: 10 Approved Plan.pdf | 23 Jan 2024 |
| PAN CardFile: 5 Pancard.pdf | 23 Jan 2024 |
| Copy of the legal title reportFile: 6 Legal Title and search report.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 7 No Encumbrances Certificate to finance.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 8 No Encumbrances Certificate to Legal.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 7 No Encumbrances Certificate to finance.pdf | 23 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 8 No Encumbrances Certificate to Legal.pdf | 23 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 9 No Layout certificate.pdf | 23 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 Approved Plan.pdf | 23 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 11 Commencement Certificate.pdf | 23 Jan 2024 |
| Declaration about Commencement CertificateFile: 12 Declaration about CC Annexure D.pdf | 23 Jan 2024 |
| Declaration in FORM BFile: 13 Form-B-Declaration-Promoter.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Form No-1 Architect Certificate.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 Form No-2 Engineer Certificate.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 16 Sold unsold declaration.pdf | 23 Jan 2024 |
| CERSAI detailsFile: 17 CERSAI Details.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 18 Form No-3 CA Certificate.pdf | 23 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19 1 Other real estate projects - Amol Rajge.pdf | 23 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19 3 Other real estate projects - Uday Parab.pdf | 23 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19 2 Other real estate projects - Himat Nakarani.pdf | 23 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 19 4 Other real estate projects - Shailesh Naik.pdf | 23 Jan 2024 |
| Proforma of Allotment letterFile: 21 Proforma of Allotment Letter.pdf | 23 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 22 Separate bank account- Form A.pdf | 23 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: 23 No Deviation in Allotment.pdf | 23 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: 24 No Deviation in Agreement.pdf | 23 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep SHREEPATI 171 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUSHPAK NODE NAVI MUMBAI5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SIDDHIVINAYAK HOMES
SIDDHIVINAYAK HOMES has 7 registrations on MahaRERA, including SIDDHIVINAYAK MAHIMA and SIDDHIVINAYAK GARIMA. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHREEPATI 171 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEPATI 171?
The registered promoter entity is SIDDHIVINAYAK HOMES, a partnership as per the filing. Its GSTIN 27AFDFS1639F1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEPATI 171?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEPATI 171?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEPATI 171?
The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: Sk Consultants & Engineering; Engineer: Hrushikesh Vilas Mindhe; Engineer: Sanjay Parshuram Mhatre; Chartered Accountant: A T UPADHYE AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEPATI 171?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback