ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHREEPATI 171

Completed No litigation declared Others project

SHREEPATI 171

By SIDDHIVINAYAK HOMES

RG-MH-17571 · RERA P52000054956 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
35 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

SHREEPATI 171 is a Others project by SIDDHIVINAYAK HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000054956 on 21 Feb 2024. The registration is recorded completed; possession was promised by 31 Dec 2026. 24 of the 59 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREEPATI 171
  • TypeOthers
  • Location
    • PLOT NO 171 SECTOR 1
    • PUSHPAK NODE NAVI MUMBAI
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054956
  • ReraGenie IDRG-MH-17571

Builder

  • NameSIDDHIVINAYAK HOMES
  • Entity typePartnership
  • GSTIN27AFDFS1639F1Z0
  • PartnersAMOL MARUTI RAJGE, HIMATBHAI POPATBHAI NAKARANI, UDAY BUDHAJI PARAB, SHAILESH GANGARAM NAIK
  • Other registrations6 more →
  • Completed6 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Feb 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

41%24 of 59 units booked
84.9%Work done, per cost certificate

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREEPATI 171NA7752759

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

SHREEPATI 171: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area620 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Sep 2024
LandownerVillageDistrict
NILESH NAMDEV GAIKWADPargaonRaigarh

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation Of Maharashtra Ltd
Permissible FSI2508.02
Proposed, not sanctioned2,466 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4 TO 6, NEEL ASHIMA, SECTOR-2A, PLOT NO 14, KARANJADE, PANVEL
Estimated costRs 5.57 cr
Cost incurredRs 4.74 cr
Work done84.94%
BuildingWingEstimatedIncurred
SHREEPATI 171NARs 5.35 crRs 4.74 cr
-NARs 22.30 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL ARCHITECTS
EngineerB S SUKTHANKAR AND ASSOCIATES
EngineerSk Consultants & Engineering
EngineerHrushikesh Vilas Mindhe
EngineerSanjay Parshuram Mhatre
Chartered AccountantA T UPADHYE AND CO
Chartered AccountantDEEPESH SHAH AND ASSOCIATES
PartnerRole in project
SIDDHIVINAYAK HOMES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC SH.pdf29 May 2026
Withdrawal Update Form 1File: Form no -1 plot -171.pdf30 Apr 2026
Withdrawal Update Form 2File: Form2 SIGN.pdf30 Apr 2026
Withdrawal Update Form 3File: Form no-3 CA Siddhivinayak homes.pdf30 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf27 Mar 2026
Withdrawal Update Form 1File: form no-1 atul patel plot -171.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2 Engg Dec-2025.pdf22 Jan 2026
Withdrawal Update Form 3File: Form3 signed for upload.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1 Home sep 25.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 Shreepati 171 for upload.pdf18 Oct 2025
Withdrawal Update Form 3File: Form3 signed for upload.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 -Siddhivinayak Homes.pdf18 Sep 2025
Withdrawal Update Form 1File: Form no -1 p-171.pdf5 Aug 2025
Withdrawal Update Form 2File: Form -2 for Upload.pdf5 Aug 2025
Withdrawal Update Form 3File: CA Form3 25-26 Q1 signed.pdf5 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate SH Q4.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 - march 2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for upload_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 enggi.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 171-1-PUSHPAK RERA (2024 SEPTEMBER) signed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shreepati 171 - September 2024 sined.pdf19 Oct 2024
Building plan approvalFile: ACC DRG_11zon.pdf18 Oct 2024
Copy of the legal title reportFile: Legal Title Report.pdf18 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER- SIDDHIVINAYAK HOMES- PLOT NO 171 SECTOR 01 VADGHAR.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 CA Certificate-SH for upload.pdf18 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Updated CC.pdf18 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: ACC DRG_11zon.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold declaration.pdf18 Oct 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-SIDDHIVINAYAK HOMES- PLOT NO 171 SECTOR 01 VADGHAR.pdf18 Oct 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE - SIDDHIVINAYAK HOMES- PLOT NO 171 SECTOR 01 VADGHAR.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5 SH signed.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate signed.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no-1 shreepati 271.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold declaration - SH.pdf22 Jul 2024
Proforma of Agreement for saleFile: Model of Agreement for Sale.pdf9 Feb 2024
Other - LegalFile: Annexure 'A' - Declaration-Promoter.pdf9 Feb 2024
Other - LegalFile: Agreement to Lease.pdf9 Feb 2024
Other - TechnicalFile: Email from CIDCO to RERA for CC.pdf9 Feb 2024
Layout approvalFile: 9 No Layout certificate.pdf23 Jan 2024
Building plan approvalFile: 10 Approved Plan.pdf23 Jan 2024
PAN CardFile: 5 Pancard.pdf23 Jan 2024
Copy of the legal title reportFile: 6 Legal Title and search report.pdf23 Jan 2024
Details of encumbrances concerned to FinanceFile: 7 No Encumbrances Certificate to finance.pdf23 Jan 2024
Details of encumbrances concerned to FinanceFile: 8 No Encumbrances Certificate to Legal.pdf23 Jan 2024
Details of encumbrances concerned to LegalFile: 7 No Encumbrances Certificate to finance.pdf23 Jan 2024
Details of encumbrances concerned to LegalFile: 8 No Encumbrances Certificate to Legal.pdf23 Jan 2024
Copy of Layout Approval (in case of layout)File: 9 No Layout certificate.pdf23 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 Approved Plan.pdf23 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 11 Commencement Certificate.pdf23 Jan 2024
Declaration about Commencement CertificateFile: 12 Declaration about CC Annexure D.pdf23 Jan 2024
Declaration in FORM BFile: 13 Form-B-Declaration-Promoter.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Form No-1 Architect Certificate.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 Form No-2 Engineer Certificate.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: 16 Sold unsold declaration.pdf23 Jan 2024
CERSAI detailsFile: 17 CERSAI Details.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 18 Form No-3 CA Certificate.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19 1 Other real estate projects - Amol Rajge.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19 3 Other real estate projects - Uday Parab.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19 2 Other real estate projects - Himat Nakarani.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 19 4 Other real estate projects - Shailesh Naik.pdf23 Jan 2024
Proforma of Allotment letterFile: 21 Proforma of Allotment Letter.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 22 Separate bank account- Form A.pdf23 Jan 2024
Deviation Report with respect to Allotment letterFile: 23 No Deviation in Allotment.pdf23 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 24 No Deviation in Agreement.pdf23 Jan 2024

How this compares with Raigarh

41%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREEPATI 171 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK NODE NAVI MUMBAI5,900+ in Raigarh

Builder: SIDDHIVINAYAK HOMES

SIDDHIVINAYAK HOMES has 7 registrations on MahaRERA, including SIDDHIVINAYAK MAHIMA and SIDDHIVINAYAK GARIMA. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHREEPATI 171 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREEPATI 171?

The registered promoter entity is SIDDHIVINAYAK HOMES, a partnership as per the filing. Its GSTIN 27AFDFS1639F1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREEPATI 171?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREEPATI 171?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREEPATI 171?

The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: Sk Consultants & Engineering; Engineer: Hrushikesh Vilas Mindhe; Engineer: Sanjay Parshuram Mhatre; Chartered Accountant: A T UPADHYE AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREEPATI 171?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREEPATI 171. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREEPATI 171 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.