Registered No litigation declared Residential / Group Housing project

SHREENATH DEVELOPERS

By HARESH PRANLAL MEHTA

RG-MH-17618 · RERA P99000055381 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
42 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

SHREENATH DEVELOPERS is a Residential / Group Housing project by HARESH PRANLAL MEHTA in Palghar, Maharashtra, registered with MahaRERA as P99000055381 on 22 Mar 2024. Possession is promised by 31 Dec 2027. 0 of the 42 units on this registration are recorded sold or booked, and 6 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHREENATH DEVELOPERS
  • TypeResidential / Group Housing
  • Location
    • SARPADA ROAD
    • UMROLI
    • Palghar
    • 401501
  • Pincode401501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000055381
  • ReraGenie IDRG-MH-17618

Builder

  • NameHARESH PRANLAL MEHTA
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed71 files

Current status

0%0 of 42 units booked
29.6%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE BNA4312012
TYPE CNA4318018
TYPE DNA4312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

TYPE B55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
TYPE B11
TYPE C11
TYPE D11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityAdditional District Collector Thane, Headquarters Jawhar
Permissible FSI1722.75
Proposed, not sanctioned1,623 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAI KIRAN BLDG OPP RAILWAY STATION BHAYANDAR EAST 401105
Estimated costRs 2.85 cr
Cost incurredRs 84.30 lakh
Work done29.58%
BuildingWingEstimatedIncurred
TYPE BNARs 90.00 lakhRs 82.80 lakh
TYPE CNARs 90.00 lakh-
TYPE DNARs 90.00 lakh-
-NARs 15.00 lakhRs 1.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJ ASSOCIATES
EngineerRAJ ASSOCIATES
EngineerPradip Patil
Chartered AccountantR D LUKAD
Chartered AccountantR. D. Lukad & Co.
PartnerRole in project
HARESH PRANLAL MEHTA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Shreenath (1).pdf8 Jul 2026
Withdrawal Update Form 1File: Form 1 Oct DEC.pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 Jan to Mar.pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 Jan to Mar.pdf7 Jul 2026
Withdrawal Update Form 1File: Form 1 Oct DEC.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 Oct Dec.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 Jan to mar.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 Jan to mar.pdf7 Jul 2026
Withdrawal Update Form 2File: Form 2 Oct Dec.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 OCt Dec.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 jan to mar.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 jan to mar.pdf7 Jul 2026
Withdrawal Update Form 3File: Form 3 OCt Dec.pdf7 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf7 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf7 Jul 2026
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf4 Jul 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf4 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 2025-26.pdf4 Jul 2026
Withdrawal Update Form 1File: architect Certificate.pdf14 May 2026
Withdrawal Update Form 1File: architect Certificate.pdf14 May 2026
Withdrawal Update Form 2File: Enginner Certificate.pdf14 May 2026
Withdrawal Update Form 2File: Enginner Certificate.pdf14 May 2026
Withdrawal Update Form 3File: Form 3.pdf14 May 2026
Withdrawal Update Form 3File: Form 3.pdf14 May 2026
Withdrawal Update Form 1File: architect Certificate.pdf30 Dec 2025
Withdrawal Update Form 2File: Enginner Certificate.pdf30 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf30 Dec 2025
Withdrawal Update Form 1File: architect Certificate.pdf6 Oct 2025
Withdrawal Update Form 2File: Enginner Certificate.pdf6 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf6 Oct 2025
Form 1File: Architect April To june2024.pdf26 Aug 2025
Form 2File: Eng April To June 2024.pdf26 Aug 2025
Form 3File: SHREENATH DEV APRIL - JUNE 2024-.pdf26 Aug 2025
Disclosure of Sold and Booked InventoryFile: New Sold.pdf26 Aug 2025
Form 1File: Architect Jul Sep 2024.pdf26 Aug 2025
Form 2File: Eng Jul To Sep 24.pdf26 Aug 2025
Form 3File: SHREENATH DEV JULY-SEP 2024.pdf26 Aug 2025
Disclosure of Sold and Booked InventoryFile: New Sold.pdf26 Aug 2025
Form 1File: Architect oCT Dec 2024.pdf26 Aug 2025
Form 2File: ENG dec 2024.pdf26 Aug 2025
Form 3File: SHREENATH DEV OCT -DEC 2024.pdf26 Aug 2025
Disclosure of Sold and Booked InventoryFile: New Sold.pdf26 Aug 2025
Form 1File: Architect JAn MAr 25.pdf26 Aug 2025
Form 2File: Eng Jan- Mar 25.pdf26 Aug 2025
Form 3File: SHREENATH DEV JAN-MARCH 2025.pdf26 Aug 2025
Disclosure of Sold and Booked InventoryFile: New Sold.pdf26 Aug 2025
Other - TechnicalFile: CC Validity.pdf19 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Other - Technical(1).pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM1_page-0001.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG-FORM2_page-0001.pdf12 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow12 Mar 2024
Other - TechnicalFile: Declartion.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2024
Proforma of Agreement for saleFile: Rera Draft Agreement-Shreenath Developer.pdf30 Jan 2024
Layout approvalFile: LAYOUT (2).pdf29 Jan 2024
Building plan approvalFile: Builing Plan -1.pdf29 Jan 2024
PAN CardFile: Pan Card.pdf29 Jan 2024
Copy of the legal title reportFile: Title Report.pdf29 Jan 2024
Details of encumbrances concerned to FinanceFile: Finance Encumbrance.pdf29 Jan 2024
Details of encumbrances concerned to LegalFile: Finance Encumbrance.pdf29 Jan 2024
Copy of Layout Approval (in case of layout)File: LAYOUT (2).pdf29 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Builing Plan -1.pdf29 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf29 Jan 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf29 Jan 2024
Declaration in FORM BFile: Affidavit.pdf29 Jan 2024
CERSAI detailsFile: Cersai.pdf29 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloseur of Interest.pdf29 Jan 2024
Proforma of Allotment letterFile: Allotment Letter.pdf29 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation-Allotment.pdf29 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation-Agreement.pdf29 Jan 2024
Other - TechnicalFile: HARISH MEHTA UMROLI SUBMISSION COLLECTOR OFC.pdf29 Jan 2024

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREENATH DEVELOPERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UMROLI3,200+ in Palghar

2 kmSHREENATH DEVELOPERSCompleted 56Lapsed / revoked 35Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 186 registered projects within 2 km.

Builder: HARESH PRANLAL MEHTA

HARESH PRANLAL MEHTA has 1 registration on MahaRERA, including SHREENATH DEVELOPERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREENATH DEVELOPERS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREENATH DEVELOPERS?

The registered promoter entity is HARESH PRANLAL MEHTA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREENATH DEVELOPERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREENATH DEVELOPERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREENATH DEVELOPERS?

The professionals named in the filing: Architect: RAJ ASSOCIATES; Engineer: RAJ ASSOCIATES; Engineer: Pradip Patil; Chartered Accountant: R D LUKAD; Chartered Accountant: R. D. Lukad & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREENATH DEVELOPERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREENATH DEVELOPERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREENATH DEVELOPERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.