Home / Browse projects / Shreeji Towers
Shreeji Towers
By NEUMEC DEVELOPER AND BUILDERS
RG-MH-11587 · RERA P51900012467 · Last updated on MahaRERA portal: 3 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 4 cases
- 2 complaints at MahaRERA
- Completion date moved by 91 months
- 6 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shreeji Towers is a Residential / Group Housing project by NEUMEC DEVELOPER AND BUILDERS in Barkat Ali Naka, 400037, registered with MahaRERA as P51900012467 on 1 Sep 2017. Possession is promised by 30 Sep 2027. The completion date has moved by 91 months from the original filing. 59 of the 84 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameShreeji Towers
- TypeResidential / Group Housing
- Location
- Saltpan Division
- Kamlakar Nagar
- Barkat Ali Naka
- 400037
- Pincode400037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900012467
- ReraGenie IDRG-MH-11587
Builder
- NameNEUMEC DEVELOPER AND BUILDERS
- Entity typePartnership
- GSTIN27AAFFN9194B1Z3
- PartnersHEMCHAND JAYNARAYAN PUROHIT, DINESH HEMCHAND PUROHIT, RATNASAGAR DEVELOPERS LLP
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Sep 2017
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 28 Feb 2020)
- Buildings1 building record
- Documents filed131 files
Current status
Figures as on 3 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shreeji Towers | NA | 45 | 36 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 99%.
Shreeji Towers: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 88% |
Progress on shared amenities15
As on 3 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 25% |
| Water conservation /Rain water harvesting | Yes | 25% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 95% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed90
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shree Ganesh Sai SRA Sahakari Gruhnirman Sanstha | - | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shreeji Towers | NA | Rs 53.06 cr | Rs 52.22 cr |
| - | NA | Rs 3.00 cr | Rs 1.00 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Consultants combined architects |
| Architect | Architectural Concept |
| Engineer | Supcons Consultants |
| Engineer | Computer Help |
| Chartered Accountant | R.K. Jhunjhunwala & Associates |
| Chartered Accountant | Falod & Maheshwari |
| Partner | Role in project |
|---|---|
| NEUMEC DEVELOPER AND BUILDERS | - |
Extensions applied for6
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per the details mentioned at the time of registration of the project at the MahaRERA Website we have mentioned 28/02/2020 as the project completion date. Unfortunately, due to various reasons being lack of labour due to de-monetization, implementation of GST and introduction of DCPR 2034 by the Competent Authority, Therefore we would like to seek an extension period of one year ie. Till 27/02/2021.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of the project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of pandemic of Covid-19. We have consent of 54% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 61.81% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoter1) M/s Neumec Developers and Builders, Limited Liability Partnership Firm having Partners namely 1) Rakesh Jhunjhunwala [deceased] age, 62 years 2) Rekha Jhunjhunwala age, 62 years 3) Rajesh Jhunjhunwala, age 66 years 4) Dinesh Purohit age 45 years 5) Hemchand Purohit, age 73 years having address at 201. Regent Chambers above Status Restaurant, Nariman Point, Mumbai- 400021. Hereinafter Referred to as ‘ The Applicant’. 2) The Applicant made an Application before the Maharashtra Real Estate (Regulatory ) Authority through their Website for Rera Certificate Extention as per Section 6 of RERA 201
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. we kindly request an extension until 30-09-2025 to complete the project and fulfil all regulatory requirements. In accordance with circular no 28, we hereby a
Reason as filed by the promoterWe sincerely apologize for the delay in completing the project and for the late submission of this extension request. The delay has been primarily due to several unforeseen and unavoidable circumstances that have adversely affected the project's progress. These include: 1. Procurement Delays: We experienced significant setbacks due to the delay in the construction and operationalization of the RMC (Ready-Mix Concrete) plant/tower, which is critical to the progress of construction activities. 2. Financial Constraints: The project faced temporary liquidity issues that impacted our ability to mai
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 26628/2022 | High Court | Ongoing |
| 26635/2022 | High Court | Ongoing |
| 26635/2022 | High Court | Ongoing |
| 26628/2022 | High Court | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044450 | Antop Hill Warehousing Company Limited | M/s Nuemac Builders & Developers | 09/05/2018 |
| CC006000000292258 | Mr. Chirag Jain and Mr. Vishal Jain | M/s. Neumec Developer and Builders | 08/08/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Oct 2022
Documents filed131
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Final Form 3 SEPT 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Final Form 3 SEPT 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Final Form 3 SEPT 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Withdrawal Update Form 3File: Final Form 3 SEPT 2025 Shreeji Towers.pdf | 3 Nov 2025 |
| Certificates of CA (Form 5)File: form_5_Year_17-18.pdf | 4 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form_5_Year_18-19.pdf | 4 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM_-2A-22-23.pdf | 4 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SIGN.pdf | 26 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 22 Nov 2024 |
| Certificates of CA (Form 3)File: FROM 3 30-09-2024.pdf | 22 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30-09-2024.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 22 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FROMAT -A.pdf | 22 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE -A.pdf | 22 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf | 22 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 22 Nov 2024 |
| Declaration in FORM BFile: affidavit .pdf | 3 Aug 2024 |
| Declaration in FORM BFile: Affidavit Cum Declaration .pdf | 3 Aug 2024 |
| Declaration in FORM BFile: Declaration by Land Owner.pdf | 3 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SIGN.pdf | 27 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SIGN.pdf | 27 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A DT.pdf | 27 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31122023.pdf | 14 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31122023_compressed.pdf | 14 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31032024_compressed.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold AND Booked Inventory.pdf | 14 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 31122023_compressed.pdf | 14 Jun 2024 |
| Certificates of CA (Form 3)File: Form 3 31032024_compressed.pdf | 14 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY202223.pdf | 14 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 14 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 14 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 14 Jul 2023 |
| Declaration in FORM BFile: affidavit cum declaration.pdf | 3 Jun 2023 |
| Declaration in FORM BFile: form b.pdf | 17 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Neumec 2020.pdf | 17 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Neumec 2021.pdf | 17 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - March 23.pdf | 24 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on March 23.pdf | 24 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29 March 23.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: FORM 3 - March 23_compressed.pdf | 24 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: img428.pdf | 21 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3- Shreeji Towers.pdf | 17 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Shreeji Towers.pdf | 10 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Shreeji Towers.pdf | 7 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Statement as on 31Dec22.pdf | 7 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY 2021-22.pdf | 4 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22_.pdf | 4 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate as on 30 June 22.pdf | 2 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate as on 30 Sep 22.pdf | 2 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers' Certificate as on 30 Jun 22.pdf | 2 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers' Certificate as on 30 Sep 22.pdf | 2 Nov 2022 |
| Certificates of CA (Form 3)File: Form 3 - June 2022.pdf | 2 Nov 2022 |
| Certificates of CA (Form 3)File: Form 3 - Sept 2022.pdf | 2 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Shreeji Towers Circular 29- June 2022.pdf | 31 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Shreeji Towers Circular 29- September 2022.pdf | 31 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE - 5 YEARS_compressed.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE- 1st Year.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE- 2nd Year.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE- 3rd Year.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE- 4th Year.pdf | 21 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE- 5th Year.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-ENGINEER CERTIFICATE - 5 COMBINE.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- 1st Year.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- 2nd Year.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- 3rd Year.pdf | 21 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- 4th Year.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: FORM 3 - ANNX D - COST OF PROJECT - 5 YRS_compressed.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: FORM 3- 1st Year.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: FORM 3- 2nd Year.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: FORM 3- 3rd Year.pdf | 21 Oct 2022 |
| Certificates of CA (Form 3)File: FORM 3- 4th Year.pdf | 21 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 131 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shreeji Towers on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Barkat Ali Naka
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
The Earth
AB BUILDERS AND DEVELOPERS SOLUTIONS PRIVA
AJMERA MANHATTAN BUILDING 3A AND 3B
AJMERA REALTY AND INFRA INDIA LTD
AJMERA MANHATTAN BUILDING 4A AND 4B
AJMERA REALTY AND INFRA INDIA LTD
DOSTI EASTERN BAY - PHASE 3
DOSTI REALTY LTD
Siddha Sky Phase 2
M/s Sejal Shakti Realtors LLP
Siddha Sky Phase 4
Sejal Shakti Realtors LLP
Builder: NEUMEC DEVELOPER AND BUILDERS
NEUMEC DEVELOPER AND BUILDERS has 1 registration on MahaRERA, including Shreeji Towers. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if Shreeji Towers is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shreeji Towers?
The registered promoter entity is NEUMEC DEVELOPER AND BUILDERS, a partnership as per the filing. Its GSTIN 27AAFFN9194B1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shreeji Towers?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Shreeji Towers?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Shreeji Towers?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shreeji Towers?
The professionals named in the filing: Architect: Consultants combined architects; Architect: Architectural Concept; Engineer: Supcons Consultants; Engineer: Computer Help; Chartered Accountant: R.K. Jhunjhunwala & Associates; Chartered Accountant: Falod & Maheshwari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shreeji Towers?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback