Home / Browse projects / Raigarh, Maharashtra / Shreeji Today Royal

Registered No litigation declared Others project

Shreeji Today Royal

By Today Royal Developers

RG-MH-66925 · RERA P52000048928 · Last updated on MahaRERA portal: 13 Oct 2026

Source: official MahaRERA filing

Red flags

  • Rs 40.00 crore secured on the land, in favour of Aditya Birla Capital Finance
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedmoved 4 months by MahaRERA order
5 of 11Construction stages donefurthest along: Staircases, 97%
29 of 138Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 110 documents Report an error

Shreeji Today Royal is a Others project by Today Royal Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000048928 on 24 Jan 2023. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 109 of the 138 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameShreeji Today Royal
  • TypeOthers
  • Location
    • Sector - 33
    • Kharghar
    • Navi Mumbai
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000048928
  • ReraGenie IDRG-MH-66925

Builder

  • NameToday Royal Developers
  • Entity typePartnership
  • GSTIN27AAJFT1216A2ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNarayan Jiva Vaviya, Lalji Bhachu Patni, Hemang Dineshbhai Patel, Kalpeshkumar Mohanlal Patel, Saurabh Vithalbhai Patel, Dharmesh Vallabhbhai Bhalani, Mohanram Khemaram Suthar
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2023First promiseDec 2027Revised toApr 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed110 files

Current status

79%109 of 138 units booked
71.0%Work done, per cost certificate

Figures as on 13 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shreeji TodayNA312612018138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.

Shreeji Today: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed144

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots144
Closed/Covered144

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,995 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Finance
Secured amountRs 40.00 crore
CERSAI search filedYes
Declared on18 Aug 2026

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation
Permissible FSI11236.36
Proposed, not sanctioned9,641 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR ELLORA COMMERCIAL UNIT 1-4 PLOT NO-27 SECTOR -11 CBD BELAPUR, NAVI MUMBAI THANE MAHARAS
Estimated costRs 53.00 cr
Cost incurredRs 37.61 cr
Work done70.97%
BuildingWingEstimatedIncurred
Shreeji TodayNARs 50.35 crRs 37.61 cr
-NARs 2.65 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDestination Architecture Interior Designs
EngineerSuraj Mahadik
EngineerAmit Yadav
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantParth Gada
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantGaurav S. Rajpal & Co.
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Today Royal Developers-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2027 → Apr 2028

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2028

Documents filed110

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 110 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 (2).pdf13 Oct 2026
Withdrawal Update Form 2File: Shreeji_Today_Royal_Form2_Q2_2026-27_13-10-2026_11-33.pdf13 Oct 2026
Withdrawal Update Form 3File: Shreeji_Today_Royal_Form3_Q2_2026-27_12-10-2026_17-16_doc1.pdf13 Oct 2026
Form 2A (FY 2022-2023)File: Form 2A 2022-23.pdf10 Oct 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf10 Oct 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf10 Oct 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf10 Oct 2026
Form 5 (FY 2022-2023)File: FINAL Form 5 FY 2022-2023.pdf10 Oct 2026
Form 5 (FY 2023-2024)File: Form-5 Shreeji Today Royal For FY 2023-24.pdf7 Oct 2026
Form 5 (FY 2024-2025)File: Form-5 Shreeji Today Royal For FY 2024-25.pdf7 Oct 2026
Form 5 (FY 2025-2026)File: Shreeji_Today_Royal_Form5_2025-26_06-10-2026_11-39.pdf6 Oct 2026
Form 1File: Form 1 - Shreeji Today Royal as on June 2025.pdf27 Aug 2026
Form 1File: Form 1 - Shreeji Today Royal as on June 2025.pdf27 Aug 2026
Form 2File: Form 2 - Shreeji Today Royal as on March 2025.pdf27 Aug 2026
Form 2File: Form 2 - Shreeji Today Royal as on March 2025.pdf27 Aug 2026
Form 3File: Form 3 - Shreeji Today Royal as on March 2025.pdf27 Aug 2026
Form 3File: Form 3 - Shreeji Today Royal as on March 2025.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf27 Aug 2026
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf27 Aug 2026
OthersFile: drawing.pdf27 Aug 2026
OthersFile: cc.pdf27 Aug 2026
Form 1File: FORM 1 Shreeji Today Royal.pdf20 Jul 2026
Form 2File: Shreeji_Today_Royal_Form2_Q1_2026-27_20-07-2026_16-26.pdf20 Jul 2026
Form 3File: Shreeji_Today_Royal_Form3_Q1_2026-27_20-07-2026_12-06_doc1.pdf20 Jul 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeji Today Royal as on june 2026.pdf20 Jul 2026
Form 1File: Form 1 - Shreeji Today Royal as on March 2026.pdf18 May 2026
Form 2File: Form 2 - Shreeji Today Royal as on March 2026.pdf18 May 2026
Form 3File: Form 3 - Shreeji Today Royal as on March 2026.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeji Today Royal as on March 2026.pdf18 May 2026
Form 1File: Form 1 - Shreeji Today Royal as on Dec 2025.pdf13 May 2026
Form 2File: Form 2 - Shreeji Today Royal as on Dec 2025.pdf13 May 2026
Form 3File: Form 3 - Shreeji Today Royal as on Dec 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeji Today Royal as on Dec 2025.pdf13 May 2026
Form 1File: Form 1 - Shreeji Today Royal as on Sep 2025.pdf13 Nov 2025
Form 2File: Form 2 - Shreeji Today Royal as on Sept 2025.pdf13 Nov 2025
Form 3File: Form 3 - Shreeji Today Royal as on 30-09-2025.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeji Today Royal as on Sept 2025.PDF13 Nov 2025
Form 1File: Form 1 - Shreeji Today Royal as on June 2025.pdf17 Sep 2025
Form 2File: Form 2 - Shreeji Today Royal as on June 2025.pdf17 Sep 2025
Form 3File: Form 3 - Shreeji Today Royal as on June 2025.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Shreeji Today Royal as on June 2025.pdf17 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shreeji Today Royal as on March 2025.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeji Today Royal as on March 2025.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeji Today Royal as on March 2025.pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shreeji Today Royal as on Dec 2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeji Today Royal as on Dec 2024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeji Today Royal as on Dec 2024.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeji Today Royal as on Sep 2024.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shreeji Today Royal as on Sep 2024.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeji Today Royal as on Sep 2024.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shreeji Today Royal Sep 24_compressed.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Shreeji Today Royal Sep 24_compressed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Shreeji Today Royal as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shreeji Today Royal as on 30th June 2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeji Today Royal as on June 2024.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeji Today Royal as on March 2024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shreeji Today Royal as on 31-03-2024.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shreeji Today Royal as on March 2024.pdf1 Apr 2024
Building plan approvalFile: Drawing Revised-1-2_compressed.pdf29 Mar 2024
Building plan approvalFile: Drawing Revised-3-5_compressed.pdf29 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing Revised-1-2_compressed.pdf29 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing Revised-3-5_compressed.pdf29 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Shreeji Today Royal (REVISED).pdf29 Mar 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Shreeji Today Royal as on Dec 2023.pdf13 Mar 2024
Layout approvalFile: Layout - Shreeji Today Royal_compressed.pdf1 Feb 2024
Copy of Layout Approval (in case of layout)File: Layout - Shreeji Today Royal_compressed.pdf1 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - Shreeji Today Royal.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeji Today Royal as on Dec 2023.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shreeji Today Royal as on 31-12-2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Shreeji Today Royal as on Dec 2023.pdf3 Jan 2024
Details of encumbrances concerned to FinanceFile: Application for Encumberance Letter.pdf3 Nov 2023
Details of encumbrances concerned to LegalFile: Application for Encumberance Letter.pdf3 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Final Shreeji Projects.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Shreeji Today Royal as on September 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shreeji Today Royal as on 30-09-2023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (1).pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 April23 to June23.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Apr to June23.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Shreeji Today Royal.pdf3 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Sep 2023

How this compares with Raigarh

79%of this project is bookeddistrict median 28%
21%of Raigarh projects moved their completion datethis one moved by 4 months
25%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shreeji Today Royal on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar, Navi Mumbai5,900+ in Raigarh

2 kmShreeji Today RoyalCompleted 42Lapsed / revoked 14Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: Today Royal Developers

Today Royal Developers has 2 registrations on MahaRERA, including Shreeji Today Royal and ILAND 27. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Shreeji Today Royal is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shreeji Today Royal?

The registered promoter entity is Today Royal Developers, a partnership as per the filing. Its GSTIN 27AAJFT1216A2ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shreeji Today Royal?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shreeji Today Royal?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shreeji Today Royal?

The professionals named in the filing: Architect: Destination Architecture Interior Designs; Engineer: Suraj Mahadik; Engineer: Amit Yadav; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: Parth Gada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shreeji Today Royal?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shreeji Today Royal. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shreeji Today Royal to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.