ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Shreeji Residency

Registered No litigation declared Residential / Group Housing project

Shreeji Residency

By Shreeji Lifespaces Buildcon

RG-MH-49567 · RERA P52000046569 · Last updated on MahaRERA portal: 4 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
9 of 11Construction stages donefurthest along: Installation of Lifts, 90%
3 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Shreeji Residency is a Residential / Group Housing project by Shreeji Lifespaces Buildcon in Raigarh, Maharashtra, registered with MahaRERA as P52000046569 on 13 Aug 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 79 of the 82 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameShreeji Residency
  • TypeResidential / Group Housing
  • Location
    • Sector No. 8
    • New Panvel East
    • New Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000046569
  • ReraGenie IDRG-MH-49567

Builder

  • NameShreeji Lifespaces Buildcon
  • Entity typePartnership
  • PartnersLalji Vaghji Polar, Narayan Jiva Vaviya, Lalji Bhachu Patni, Hira Jiva Vaviya, Mohanram Khemaram Suthar, Ramji Manji Dubariya, Harji Dana Mor

Key dates

this monthRegisteredAug 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed97 files

Current status

96%79 of 82 units booked
99.5%Work done, per cost certificate

Figures as on 4 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shreeji ResidencyNA111182082

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

Shreeji Residency: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed96

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots96
Closed/Covered96

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,924 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI6891.94
Proposed, not sanctioned4,892 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEllora ,Commercial Unit 1-4, Plot No 27, Sector 11, CBD Belapur, Navi Mumbai 400614
Estimated costRs 24.00 cr
Cost incurredRs 23.87 cr
Work done99.46%
BuildingWingEstimatedIncurred
Shreeji ResidencyNARs 22.08 crRs 21.99 cr
-NARs 1.92 crRs 1.88 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastospati Design Group
EngineerS R CONSULTANT
EngineerAmit Yadav
Chartered AccountantCA Rutuja Narsingh and Associates
Chartered AccountantG M Sandha & Associates
Chartered AccountantJayesh K Patel & Co
PartnerRole in project
Shreeji Lifespaces Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA22122518909Dec 2025 → Dec 2026

Reason as filed by the promoterThe project is being developed on land bearing Plot Nos. 34+35, 36+37, and 42+43, admeasuring approximately 1924.32 sq. mtrs., situated at Sector 8, Village New Panvel, Taluka Panvel, District Raigad (“Said Land”). The Said Land was acquired from CIDCO under an Agreement to Lease dated 27/09/2021 (registered on 28/09/2021, Doc. No. PVL-4/10429/2021) read with a Tripartite Agreement dated 06/01/2022 (registered on 07/01/2022, Doc. No. PVL-5/277/2022). On 15/03/2024, the Government of Maharashtra introduced a scheme permitting Panvel Municipal Corporation to sell TDR to promoters. The said schem

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 SING.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM 2 SING.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3 Q4.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM 1 SING.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM 2 SING.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 (2).pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Jan 2026
Layout approvalFile: REVISED CC- (1)_11zon.pdf22 Dec 2025
Building plan approvalFile: REVISED CC DRWG (1)_11zon.pdf22 Dec 2025
Building plan approvalFile: REVISED CC DRWG (1)_11zon.pdf22 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3 Q2 SL Buildcon NEW.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf9 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf9 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf9 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 .pdf9 Oct 2025
Withdrawal Update Form 3File: Form 3 .pdf9 Oct 2025
Form 5 (FY 2024-2025)File: Shreeji Lifespaces Buildcon Final.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf30 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf30 Jul 2025
Withdrawal Update Form 3File: Form 3 .pdf30 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - S L BUILDCON.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - S L BUILDCON.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SL BUILDCON.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - S L BUILDCON.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 SL Buildcon.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - S L BUILDCON.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - S L BUILDCON.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - BUILDCON.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 SL Buildcon.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 SL Buildcon.pdf19 Apr 2024
Building plan approvalFile: Revised Drawing_compressed.pdf16 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Drawing_compressed.pdf16 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf16 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SL BUILDCON.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot No 34 - 35 - 36 - 37 And 42 - 43.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot No - 34 35 36 37 And 42 43 Sector 08.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 New.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SL Buildcon FORM 3 Q2.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 SL Buildcon.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shreeji Lifespaces Buildcon -Form.pdf23 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shreeji Lifespaces Buildcon -Form-5.pdf23 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Shreeji Lifespaces Buildcon -Form-5.pdf23 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf30 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - SHREEJI RESIDENCY.pdf30 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Copy of FORM 3 v2 Q4.pdf30 May 2023
Layout approvalFile: Layout pg 1.pdf20 Apr 2023
Building plan approvalFile: Layout pg 1.pdf20 Apr 2023
Building plan approvalFile: Layout pg 1.pdf20 Apr 2023
Building plan approvalFile: Layout pg 2_11zon.pdf20 Apr 2023
Building plan approvalFile: Lyout pg 3_11zon.pdf20 Apr 2023
Copy of Layout Approval (in case of layout)File: Layout pg 1.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout pg 1.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout pg 1.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout pg 2_11zon.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Lyout pg 3_11zon.pdf20 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SHREEJI LIFESPACES BUILDCON.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate Form1 for Q3.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Copy of FORM 3 v2 Q3.pdf21 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Shreeji residency.pdf28 Oct 2022
Details of encumbrances concerned to LegalFile: Encumbrance Shreeji residency.pdf28 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Revised Seperate Bank ac detail -Shreeji residency.pdf5 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 - Shreeji Residency.pdf4 Aug 2022
Building plan approvalFile: Approved Plan CC PG 3 06072022_11zon.pdf30 Jul 2022

How this compares with Raigarh

96%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shreeji Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Panvel East5,900+ in Raigarh

Builder: Shreeji Lifespaces Buildcon

Shreeji Lifespaces Buildcon has 1 registration on MahaRERA, including Shreeji Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Shreeji Residency is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shreeji Residency?

The registered promoter entity is Shreeji Lifespaces Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shreeji Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shreeji Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shreeji Residency?

The professionals named in the filing: Architect: Vastospati Design Group; Engineer: S R CONSULTANT; Engineer: Amit Yadav; Chartered Accountant: CA Rutuja Narsingh and Associates; Chartered Accountant: G M Sandha & Associates; Chartered Accountant: Jayesh K Patel & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shreeji Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shreeji Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shreeji Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.