Home / Browse projects / Raigarh, Maharashtra / SHREEJI GLACIA
SHREEJI GLACIA
By SHIVPARVATI INFRA PRIVATE LIMITED
RG-MH-45643 · RERA P52000050775 · Last updated on MahaRERA portal: 16 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 13 months past the filed date
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEJI GLACIA is a Residential / Group Housing project by SHIVPARVATI INFRA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000050775 on 3 May 2023. Possession was promised by 30 Sep 2025 and is now 13 months past that date. 0 of the 1 unit on this registration is recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREEJI GLACIA
- TypeResidential / Group Housing
- Location
- SECTOR 18
- PLOT NO 13A
- Ulawe
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000050775
- ReraGenie IDRG-MH-45643
Builder
- NameSHIVPARVATI INFRA PRIVATE LIMITED
- Entity typeCompany
- DirectorsKAMLESH MAV, LADHAVJI PATEL, ANANDKUMAR SONI, TEJASVI SONI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 May 2023
- Promised completion30 Sep 2025
- Revised completionNone
- Buildings1 building record
- Documents filed60 files
Current status
Figures as on 16 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREEJI GLACIA | NA | 7 | 7 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.
SHREEJI GLACIA: 62% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 16 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Fitness Centre | Yes | 0% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajesh RC Architect |
| Engineer | B S Sukthankar & Associates |
| Chartered Accountant | JITEN BHANUSHALI & ASSOCIATES |
| Chartered Accountant | JITEN BHANUSHALI AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHIVPARVATI INFRA PRIVATE LIMITED | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Special Civil Suit No 89 /2017/2017 | Hon Pavel Court | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Feb 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 16 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGN.pdf | 16 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 16 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1a Form 1 Q1 FY 23-24.pdf | 13 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1b Form 1 Q2 FY 23-24.pdf | 13 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1c Form 1 Q3 FY 23-24.pdf | 13 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1d Form 1 Q4 FY 23-24.pdf | 13 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2a Form 2 Q1 FY 23-24.pdf | 13 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2b Form 2 Q2 FY 23-24.pdf | 13 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2c Form 2 Q3 FY 23-24.pdf | 13 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2d Form 2 Q4 FY 23-24.pdf | 13 Jun 2024 |
| Building plan approvalFile: CIDCO_Building Plan.pdf | 17 May 2024 |
| Layout approvalFile: CIDCO_Building Plan.pdf | 17 May 2024 |
| Copy of Layout Approval (in case of layout)File: CIDCO_Building Plan.pdf | 17 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CIDCO_Building Plan.pdf | 17 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Decl of CC - 31-05-23.pdf | 17 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Renewed CC.pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1__5th_issue__31-03-2024.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q1.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Q4.pdf | 17 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a 2024.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sales.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sales.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sales FY 23-24 Q3.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sales.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: 4c Disclosure of Sales Q3 FY 23-24.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: 4d Disclosure of Sales Q4 FY 23-24.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 23-24 Final.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - FY 23-24 Q2.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate-SHREEJI GLACIA_FY-23-24-Q3.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - FY 23-24 Q4.pdf | 17 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1__2nd_issue___30-06-2023.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1__3rd_issue__30-09-2023.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_-_1__4th_issue__30-12-2023_.pdf | 5 Apr 2024 |
| Declaration about Commencement CertificateFile: Decl of CC.pdf | 25 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final.pdf | 13 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance related to legal.pdf | 23 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance related to legal.pdf | 23 Mar 2023 |
| Proforma of Agreement for saleFile: Draft Agreement after changes.pdf | 23 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report agreement to sale.pdf | 23 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Real Estate Org Anand soni.pdf | 21 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Real Estate Org Kamlesh Bhanushali.pdf | 21 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Real Estate Org Ladhavji patel.pdf | 21 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disc of Real Estate Org Tejasvi soni.pdf | 21 Mar 2023 |
| Layout approvalFile: Layout Approval_compressed.pdf | 1 Mar 2023 |
| Building plan approvalFile: Building Plan.pdf | 1 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances related to legal finance merged.pdf | 1 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances related to legal finance merged.pdf | 1 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Approval_compressed.pdf | 1 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 1 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200261738014_For_Asset_Based_Search_01_03_2023_16_19_46_468.pdf | 1 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decl of Bank.pdf | 1 Mar 2023 |
| PAN CardFile: SHIVPARVATI INFRA.pdf | 9 Feb 2023 |
| Copy of the legal title reportFile: Title Report and Flow of Title Shreeji Glacia.pdf | 9 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Shiv parvati.pdf | 9 Feb 2023 |
| Declaration in FORM BFile: Form B.pdf | 9 Feb 2023 |
| Proforma of Allotment letterFile: Performa Allotment Letter.pdf | 9 Feb 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf | 9 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SHREEJI GLACIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PLOT NO 13A5,900+ in Raigarh
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SHIVPARVATI INFRA PRIVATE LIMITED
SHIVPARVATI INFRA PRIVATE LIMITED has 1 registration on MahaRERA, including SHREEJI GLACIA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that SHREEJI GLACIA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SHREEJI GLACIA is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEJI GLACIA?
The registered promoter entity is SHIVPARVATI INFRA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEJI GLACIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEJI GLACIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEJI GLACIA?
The professionals named in the filing: Architect: Rajesh RC Architect; Engineer: B S Sukthankar & Associates; Chartered Accountant: JITEN BHANUSHALI & ASSOCIATES; Chartered Accountant: JITEN BHANUSHALI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEJI GLACIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.