Home / Browse projects / Thane, Maharashtra / SHREEJI ANGARIKA
SHREEJI ANGARIKA
RG-MH-06164 · RERA P51700052375 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 6 months
- 1 extension taken
- Rs 8.00 crore secured on the land, in favour of STATE BANK OF INDIA
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREEJI ANGARIKA is a Others project by SIDDHIVINAYAK DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700052375 on 21 Aug 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 6 months from the original filing. 32 of the 56 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREEJI ANGARIKA
- TypeOthers
- Location
- INDRALOK PHASE - 23
- NEAR OM SHANTI CHOWK
- BHAYANDAR EAST
- Mira-Bhayandar (M Corp.)
- Thane
- 401105
- Pincode401105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700052375
- ReraGenie IDRG-MH-06164
Builder
- NameSIDDHIVINAYAK DEVELOPERS
- Entity typePartnership
- PartnersRAJESH PURSHOTTAM PATEL, HASATMUKH RAMESH PATIL, BHAGWANJI MANJI HEDPARA, VINOD VELJIBHAI SORIYA, JOGENDRA RAMESH PATIL, PAWAN KIRAN PATIL, SHREEJI INTERBUILT LLP THROUGH ITS PARTNER NILESH SHARAD PAREKH, KASTURI BUILDCON LLP THROUGH ITS PARTNER HARISH BABULAL AGRAWAL
- Other registrations45 more →
- Completed21 of 46
- No longer live7 lapsed, de-registered or revoked
- Declared earlier projects11 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Aug 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed86 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREEJI ANGARIKA WING B | NA | 17 | 16 | 46 | 10 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
SHREEJI ANGARIKA WING B: 65% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREEJI ANGARIKA WING B | NA | Rs 19.29 cr | Rs 14.30 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | APEX CONSULTANCY |
| Engineer | PROTECH CONSULTANTS |
| Engineer | RAKESH PATEL |
| Chartered Accountant | VAIBHAV PATIL & CO |
| Partner | Role in project |
|---|---|
| SIDDHIVINAYAK DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. We have completed 85% work of the Project. 2. We are in the process of completing the remaining project work and procuring the Occupancy Certificate & Form 4 - Architect’s Certificate on Completion of Project. 3. We have also taken consent for extension from more than 51% of allottees. 4. The remaining project work & process of procuring the Occupancy Certificate will be completed by 31/12/2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 SD 31032026.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 S D 31032026.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 S D 31032026.pdf | 25 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 SD 31122025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 SD 31122025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 SD 31122025.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 Arc Cert 30-06-2025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Arc Cert 30-09-2025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Eng Cert 30-06-2025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Eng Cert 30-09-2025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 CA Cert 30062025.pdf | 25 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 CA Cert 30092025 SD.pdf | 25 Dec 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 10 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 10 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 siddivinayk devlopers.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Ceritificate.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Ceritificate.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Ceritificate.pdf | 9 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 9 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Ass.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 CA Cert.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 8 Nov 2024 |
| Building plan approvalFile: Plan 1.pdf | 27 Apr 2024 |
| Building plan approvalFile: Plan 2.pdf | 27 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 27 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 27 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC Siddhivinayak Developer.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Cert.pdf | 27 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert.pdf | 27 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Ass.pdf | 27 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT's CERTIFICATE.pdf | 1 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER's CERTIFICATE.pdf | 1 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SD FORM 2A- 2nd quarter 23-24.pdf | 1 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SD FORM 2A- 3rd quarter 23-24.pdf | 1 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SD DISCLOSURE OF SOLD.pdf | 1 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SD FORM 3.pdf | 1 Mar 2024 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 24 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION ENCUMBRANCES.pdf | 24 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION FINANCE.pdf | 24 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION LEGAL.pdf | 24 Jul 2023 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION ENCUMBRANCES.pdf | 24 Jul 2023 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION FINANCE.pdf | 24 Jul 2023 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION LEGAL.pdf | 24 Jul 2023 |
| Proforma of Agreement for saleFile: Final Agreement.pdf | 24 Jul 2023 |
| Proforma of Allotment letterFile: Final Allotment letter.pdf | 24 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation ALLOTMENT LETTER.pdf | 24 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation AGREEMENT FOR SALE.pdf | 24 Jul 2023 |
| Other - LegalFile: Declaration.pdf | 24 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: DECLARATION COMMENCEMENT CERTIFICATE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: BMH DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: HRP DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: JRP DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: KASTURI BUILDCON LLP DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NBH DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NSP DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: PKP DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RPP DISCLOSURE.pdf | 14 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: VVS DISCLOSURE.pdf | 14 Jul 2023 |
| Other - TechnicalFile: CORRECTION LAND DETAIL.pdf | 14 Jul 2023 |
| Layout approvalFile: 5 Plan 1.pdf | 21 Jun 2023 |
| Building plan approvalFile: 6 Plan 2.pdf | 21 Jun 2023 |
| PAN CardFile: 1 Pan Card.pdf | 21 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCES CONCERNED TO FINANCE.pdf | 21 Jun 2023 |
| Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCES CONCERNED TO FINANCE.pdf | 21 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: 5 Plan 1.pdf | 21 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 Plan 2.pdf | 21 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificate.pdf | 21 Jun 2023 |
| Declaration about Commencement CertificateFile: 8 DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 21 Jun 2023 |
| Declaration in FORM BFile: 9 AFFIDAVIT CUM DECLARATION Form B.pdf | 21 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 45 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREEJI ANGARIKA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR OM SHANTI CHOWK, BHAYANDAR EAST7,600+ in Thane
Filed coordinates, straight-line distance. 243 registered projects within 2 km.
VIHANG LUXURIA
REYANSHP REALTY LLP
ESQUIRE
JP INFRA&SALASAR BUILDCON LLP
ANJANI BLISS
ANJANI KUMAR COMPANY PRIVATE LIMITED
SHREE BALAJI EMPIRE
SHUBHAM HOUSING
SMIT VISTA
SMIT MEGASTRUCTURES
INDRA NEEL
SONAM SPARK INFRA PRIVATE LIMITED
See every Thane project, with the district possession charts
Builder: SIDDHIVINAYAK DEVELOPERS
SIDDHIVINAYAK DEVELOPERS has 46 registrations on MahaRERA, including VIJAY PLAZA - A and VIJAY PLAZA - B. Its filings disclose 11 earlier MahaRERA projects: declares 6 of 9 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHREEJI ANGARIKA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREEJI ANGARIKA?
The registered promoter entity is SIDDHIVINAYAK DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREEJI ANGARIKA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREEJI ANGARIKA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREEJI ANGARIKA?
The professionals named in the filing: Architect: APEX CONSULTANCY; Engineer: PROTECH CONSULTANTS; Engineer: RAKESH PATEL; Chartered Accountant: VAIBHAV PATIL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREEJI ANGARIKA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback