Home / Browse projects / Raigarh, Maharashtra / SHREE VIJAY HEIGHTS

Registered No litigation declared Others project

SHREE VIJAY HEIGHTS

By SHREE BUILDERS AND DEVELOPERS

RG-MH-79725 · RERA P52000047040 · Last updated on MahaRERA portal: 17 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Stilt Floor, 95%
78 of 117Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SHREE VIJAY HEIGHTS is a Others project by SHREE BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000047040 on 26 Sep 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 39 of the 117 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE VIJAY HEIGHTS
  • TypeOthers
  • Location
    • PLOT NO 96 SECTOR 07 PUSHPAKNAGAR DAPOLI
    • SECTOR 07 PUSHPAKNAGAR DAPOLI
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000047040
  • ReraGenie IDRG-MH-79725

Builder

  • NameSHREE BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • GSTIN27AELFS3099G1ZI
  • PartnersSATISH ANANT KADU, AMOL SUKHADEV JARE
  • Other registrations12 more →
  • Completed3 of 13
  • No longer live5 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed66 files

Current status

33%39 of 117 units booked
90.0%Work done, per cost certificate

Figures as on 17 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE VIJAY HEIGHTSNA121210413117

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

SHREE VIJAY HEIGHTS: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.93%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed145

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots145
Closed/Covered37
Open Space108

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,430 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
Declared on28 Nov 2025
LandownerVillageDistrict
HIRABAI JANARDAN MHATREOwleRaigarh
ANIL JANARDAN MHATREOwleRaigarh
RANJEET JANARDAN MHATREOwleRaigarh
TAIBAI JANARDAN MHATRE ALIAS ASHA VIJAY VANAGEOwleRaigarh
CHHAYA JANARDAN MHATRE ALIAS CHHAYA VIKAS GAIKWADKalamboliRaigarh
BHAGYASHRI VIJAY MHATRE ALIAS BHAGYASHRI B PATILShivkarRaigarh

Approvals and building plan

Sanctioning authorityCIDCO LTD
Permissible FSI3560.0
Proposed, not sanctioned2,829 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSH 6 AND 7 PARTH SOLITAIRE PLOT NO 2 SEC 9E KALAMBOLI 410218
Estimated costRs 8.00 cr
Cost incurredRs 7.20 cr
Work done90.0%
BuildingWingEstimatedIncurred
-NARs 8.00 crRs 7.20 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDISHA ARCHITECTS
EngineerB S SUKTHANKAR AND ASSOCIATES
EngineerMAHESH
Chartered AccountantBHAVESH BHANUSHALI AND ASSOCIATES
Chartered AccountantBHAVESH GOPAL BHANUSHALI
Chartered AccountantVAISHNAVI R MORAJKAR
PartnerRole in project
SHREE BUILDERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24122518963Dec 2025 → Dec 2026

Reason as filed by the promoterDue to unforeseen delays in obtaining necessary approvals from CIDCO LTD, the project’s timeline has been significantly impacted, We sincerely apologize for any inconvenience this delay may cause and thank you for your understanding and consideration of our request

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Pl 96 Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form2 Pl 96 Shree Vijay Heights.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Shree Vijay Heights Q3.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf9 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf9 Dec 2025
Withdrawal Update Form 3File: aa.pdf9 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf5 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf5 Dec 2025
Withdrawal Update Form 3File: Shree Vijay Heights Form 3 Scanned Q1 FY 2024-25.pdf5 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form I Plot No 96.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 96.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Pl 96 Shree vijay heights.pdf19 Oct 2024
Form 5 (FY 2023-2024)File: Shree Vijay Heights Form 5.pdf20 Sep 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 2024 Shree Vijay Engi.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Vijay Heights Form 3 Scanned Q1 FY 2024-25.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf21 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree builders and developers_Shree vijay heights_form 3_Q4_FY 2023-24.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 Q1 - 2024.pdf19 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Shree Vijay Heights Form 5 FY 2022-23.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Shree Builder and Developers Q3 FY 2023-24 signed scan.pdf21 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023 Form 2 Engi Certi Plot No 96 Shree Vijay Heights.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Plot 96 form 1 Q3 1.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 FY 23-24 Form 2 Shree Vijay Heights Plot 96 Signed.pdf15 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2023-24 FORM 3 SBD - Shree Vijay Heights.pdf15 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot No 96.pdf9 Oct 2023
Building plan approvalFile: 2nd CC Plann.pdf27 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 2nd CC Plann.pdf27 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: 2nd CC Copy.pdf27 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Plot No 96 Sector No 07.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate.pdf27 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf27 Jul 2023
Proforma of Allotment letterFile: Revised AFS- DRAFT - model .pdf9 Sep 2022
Proforma of Allotment letterFile: Revised Model Letter of Allotment - RERA.pdf9 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 scanned.pdf6 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Report respect to Allotment.pdf31 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report respect to AFS.pdf31 Aug 2022
Other - LegalFile: 1 Tripartite Agreement Plot 96 Shree Builders and Developers.pdf21 Aug 2022
Other - LegalFile: 2 Tripartite Agreement Plot 96 Shree Builders Developers.pdf21 Aug 2022
Other - LegalFile: 3 Tripartite Agreement Plot 96 Shree Builders Developers.pdf21 Aug 2022
Other - LegalFile: 4 Tripartite Agreement Plot 96 Shree Builders Developers.pdf21 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account for RERA Declaration.pdf27 Jul 2022
Layout approvalFile: Layout Plan 96.pdf22 Jul 2022
Building plan approvalFile: 1 CC Plan Plot No 96.pdf22 Jul 2022
Building plan approvalFile: 2 CC Plan Plot No 96.pdf22 Jul 2022
Building plan approvalFile: 3 CC Plan Plot No 96.pdf22 Jul 2022
Building plan approvalFile: 4 CC Plan Plot No 96.pdf22 Jul 2022
Building plan approvalFile: 5 CC Plan Plot No 96.pdf22 Jul 2022
PAN CardFile: 1.pdf22 Jul 2022
Details of encumbrances concerned to FinanceFile: Declaration about Finance.pdf22 Jul 2022
Details of encumbrances concerned to FinanceFile: Declaration of Encumbrance concerned to Finance - Promoter.pdf22 Jul 2022
Details of encumbrances concerned to LegalFile: Declaration about legal.pdf22 Jul 2022
Details of encumbrances concerned to LegalFile: Declaration of Encumbrance concerned to Legal - Promoter - Copy.pdf22 Jul 2022
Copy of Layout Approval (in case of layout)File: Layout Plan 96.pdf22 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 CC Plan Plot No 96.pdf22 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 CC Plan Plot No 96.pdf22 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 3 CC Plan Plot No 96.pdf22 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 CC Plan Plot No 96.pdf22 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: 5 CC Plan Plot No 96.pdf22 Jul 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf22 Jul 2022
Declaration in FORM BFile: Form B Developers.pdf22 Jul 2022
CERSAI detailsFile: CERSAI Report with declaration.pdf22 Jul 2022
Copy of the legal title reportFile: Legal Title Report - Plot 96 Sec 7 Shree Builders.pdf20 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Copy Plot 96.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect Form 1 PLOT NO 96 SECT-7 PUSHPAK 24-05-2022.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 Plot 96.pdf20 Jul 2022

How this compares with Raigarh

33%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE VIJAY HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR 07 PUSHPAKNAGAR DAPOLI5,900+ in Raigarh

Builder: SHREE BUILDERS AND DEVELOPERS

SHREE BUILDERS AND DEVELOPERS has 13 registrations on MahaRERA, including SHREE DATTA SUMAN and SHREE SHILP. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHREE VIJAY HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE VIJAY HEIGHTS?

The registered promoter entity is SHREE BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AELFS3099G1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE VIJAY HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE VIJAY HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE VIJAY HEIGHTS?

The professionals named in the filing: Architect: DISHA ARCHITECTS; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: MAHESH; Chartered Accountant: BHAVESH BHANUSHALI AND ASSOCIATES; Chartered Accountant: BHAVESH GOPAL BHANUSHALI; Chartered Accountant: VAISHNAVI R MORAJKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE VIJAY HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE VIJAY HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE VIJAY HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.