Home / Browse projects / Raigarh, Maharashtra / SHREE VIJAY HEIGHTS
SHREE VIJAY HEIGHTS
By SHREE BUILDERS AND DEVELOPERS
RG-MH-79725 · RERA P52000047040 · Last updated on MahaRERA portal: 17 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE VIJAY HEIGHTS is a Others project by SHREE BUILDERS AND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000047040 on 26 Sep 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 39 of the 117 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE VIJAY HEIGHTS
- TypeOthers
- Location
- PLOT NO 96 SECTOR 07 PUSHPAKNAGAR DAPOLI
- SECTOR 07 PUSHPAKNAGAR DAPOLI
- Dapoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000047040
- ReraGenie IDRG-MH-79725
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Sep 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed66 files
Current status
Figures as on 17 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE VIJAY HEIGHTS | NA | 12 | 12 | 104 | 13 | 117 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.
SHREE VIJAY HEIGHTS: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 93% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 93% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 17 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 70% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed145
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership6
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| HIRABAI JANARDAN MHATRE | Owle | Raigarh |
| ANIL JANARDAN MHATRE | Owle | Raigarh |
| RANJEET JANARDAN MHATRE | Owle | Raigarh |
| TAIBAI JANARDAN MHATRE ALIAS ASHA VIJAY VANAGE | Owle | Raigarh |
| CHHAYA JANARDAN MHATRE ALIAS CHHAYA VIKAS GAIKWAD | Kalamboli | Raigarh |
| BHAGYASHRI VIJAY MHATRE ALIAS BHAGYASHRI B PATIL | Shivkar | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 8.00 cr | Rs 7.20 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DISHA ARCHITECTS |
| Engineer | B S SUKTHANKAR AND ASSOCIATES |
| Engineer | MAHESH |
| Chartered Accountant | BHAVESH BHANUSHALI AND ASSOCIATES |
| Chartered Accountant | BHAVESH GOPAL BHANUSHALI |
| Chartered Accountant | VAISHNAVI R MORAJKAR |
| Partner | Role in project |
|---|---|
| SHREE BUILDERS AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to unforeseen delays in obtaining necessary approvals from CIDCO LTD, the project’s timeline has been significantly impacted, We sincerely apologize for any inconvenience this delay may cause and thank you for your understanding and consideration of our request
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Pl 96 Form 1.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: Form2 Pl 96 Shree Vijay Heights.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Shree Vijay Heights Q3.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 9 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 9 Dec 2025 |
| Withdrawal Update Form 3File: aa.pdf | 9 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 5 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 5 Dec 2025 |
| Withdrawal Update Form 3File: Shree Vijay Heights Form 3 Scanned Q1 FY 2024-25.pdf | 5 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form I Plot No 96.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 96.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Pl 96 Shree vijay heights.pdf | 19 Oct 2024 |
| Form 5 (FY 2023-2024)File: Shree Vijay Heights Form 5.pdf | 20 Sep 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 2024 Shree Vijay Engi.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Vijay Heights Form 3 Scanned Q1 FY 2024-25.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf | 21 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree builders and developers_Shree vijay heights_form 3_Q4_FY 2023-24.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FOrm 2 Q1 - 2024.pdf | 19 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Shree Vijay Heights Form 5 FY 2022-23.pdf | 12 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Shree Builder and Developers Q3 FY 2023-24 signed scan.pdf | 21 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023 Form 2 Engi Certi Plot No 96 Shree Vijay Heights.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Plot 96 form 1 Q3 1.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 FY 23-24 Form 2 Shree Vijay Heights Plot 96 Signed.pdf | 15 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 2023-24 FORM 3 SBD - Shree Vijay Heights.pdf | 15 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot No 96.pdf | 9 Oct 2023 |
| Building plan approvalFile: 2nd CC Plann.pdf | 27 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2nd CC Plann.pdf | 27 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2nd CC Copy.pdf | 27 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Plot No 96 Sector No 07.pdf | 27 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate.pdf | 27 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 27 Jul 2023 |
| Proforma of Allotment letterFile: Revised AFS- DRAFT - model .pdf | 9 Sep 2022 |
| Proforma of Allotment letterFile: Revised Model Letter of Allotment - RERA.pdf | 9 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 scanned.pdf | 6 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report respect to Allotment.pdf | 31 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report respect to AFS.pdf | 31 Aug 2022 |
| Other - LegalFile: 1 Tripartite Agreement Plot 96 Shree Builders and Developers.pdf | 21 Aug 2022 |
| Other - LegalFile: 2 Tripartite Agreement Plot 96 Shree Builders Developers.pdf | 21 Aug 2022 |
| Other - LegalFile: 3 Tripartite Agreement Plot 96 Shree Builders Developers.pdf | 21 Aug 2022 |
| Other - LegalFile: 4 Tripartite Agreement Plot 96 Shree Builders Developers.pdf | 21 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account for RERA Declaration.pdf | 27 Jul 2022 |
| Layout approvalFile: Layout Plan 96.pdf | 22 Jul 2022 |
| Building plan approvalFile: 1 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building plan approvalFile: 2 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building plan approvalFile: 3 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building plan approvalFile: 4 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building plan approvalFile: 5 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| PAN CardFile: 1.pdf | 22 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration about Finance.pdf | 22 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrance concerned to Finance - Promoter.pdf | 22 Jul 2022 |
| Details of encumbrances concerned to LegalFile: Declaration about legal.pdf | 22 Jul 2022 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrance concerned to Legal - Promoter - Copy.pdf | 22 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Plan 96.pdf | 22 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 CC Plan Plot No 96.pdf | 22 Jul 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 22 Jul 2022 |
| Declaration in FORM BFile: Form B Developers.pdf | 22 Jul 2022 |
| CERSAI detailsFile: CERSAI Report with declaration.pdf | 22 Jul 2022 |
| Copy of the legal title reportFile: Legal Title Report - Plot 96 Sec 7 Shree Builders.pdf | 20 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy Plot 96.pdf | 20 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect Form 1 PLOT NO 96 SECT-7 PUSHPAK 24-05-2022.pdf | 20 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 Plot 96.pdf | 20 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE VIJAY HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR 07 PUSHPAKNAGAR DAPOLI5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SHREE BUILDERS AND DEVELOPERS
SHREE BUILDERS AND DEVELOPERS has 13 registrations on MahaRERA, including SHREE DATTA SUMAN and SHREE SHILP. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHREE VIJAY HEIGHTS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE VIJAY HEIGHTS?
The registered promoter entity is SHREE BUILDERS AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AELFS3099G1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE VIJAY HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE VIJAY HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE VIJAY HEIGHTS?
The professionals named in the filing: Architect: DISHA ARCHITECTS; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: MAHESH; Chartered Accountant: BHAVESH BHANUSHALI AND ASSOCIATES; Chartered Accountant: BHAVESH GOPAL BHANUSHALI; Chartered Accountant: VAISHNAVI R MORAJKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE VIJAY HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback