Shree Vastu Symphony
By Shree Vastupurti Associates
RG-MH-14380 · RERA P52000022687 · Last updated on MahaRERA portal: 20 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 45 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Vastu Symphony is a Residential / Group Housing project by Shree Vastupurti Associates in Raigarh, Maharashtra, registered with MahaRERA as P52000022687 on 12 Oct 2019. Possession is promised by 30 Jun 2027. The completion date has moved by 45 months from the original filing. 26 of the 38 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameShree Vastu Symphony
- TypeResidential / Group Housing
- Location
- Village Road
- Vihighar
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000022687
- ReraGenie IDRG-MH-14380
Builder
- NameShree Vastupurti Associates
- Entity typePartnership
- PartnerAsif Patel
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Oct 2019
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Sep 2023)
- Buildings2 building records
- Documents filed115 files
Current status
Figures as on 20 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A-Wing | NA | 5 | 4 | 16 | 0 | 16 |
| B-Wing | NA | 5 | 4 | 22 | 0 | 22 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 70%.
A-Wing46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B-Wing46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A-Wing | 7 | 7 |
| B-Wing | 7 | 7 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B-Wing | NA | Rs 1.93 cr | Rs 1.40 cr |
| A-Wing | NA | Rs 1.64 cr | Rs 1.19 cr |
| - | NA | Rs 66.02 lakh | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Neha Jain |
| Engineer | Nilesh Samant |
| Engineer | DU Consultant |
| Chartered Accountant | Mukund Thale |
| Chartered Accountant | Swapnil Mane & Associates |
| Partner | Role in project |
|---|---|
| Shree Vastupurti Associates | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSir, The Covid crises and the resultant restriction by Government resulted into migration of labour on a large scale. The pandemic also affected the availability of construction material which resulted in completed stoppage of work. Further, since our project is located away from urban area, it took us long time to restart the work and therefore need a period of another 10-12 months for work completion and 2-3 months for getting Occupation Certificate. In view of the above, we request this Hon’ble Authority to allow extension to the Project completion date as applied for u/s 7 (3) of Real Esta
Reason as filed by the promoterThe work of structure, blockwork for external and internal walls as well as railings have been completed. Work is in progress plaster and elevation work. Also work for other internal finishes is in progress. The balance work shall be carried out as per the CPM chart enclosed with this application. We are hopeful of completing the balance work as per the schedule given in CPM Chart. In view of the above, we request this Hon’ble Authority to allow extension to the Project completion date as applied for u/s 7 (3) of Real Estate (Regulation and Development) Act,2016.
Reason as filed by the promoterThe said extension is necessitated due to changes in the planning of the project as additional FSI has become available following the implementation of UDCPR across the state of Maharashtra. Therefore, the project timeline for completion has increased as detailed in the CPM chart enclosed with this Application. We are also in the process of applying for correction in the project details by filing appropriate application under section 14(2) of Real Estate (Regulation & Development) Act, 2016 soon after the extension of project registration validity is approved by this Hon’ble Authority. In view
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Sep 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Sep 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: SV Symphony Form-2A FY 2025-26.pdf | 20 Aug 2026 |
| Form 2A (FY 2024-2025)File: SV Symphony Form-2A FY 2024-25.pdf | 20 Aug 2026 |
| Withdrawal Update Form 1File: SV Symphony Form-1 Dec 2025.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: SV Symphony Form-2 Dec 2025.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: SV Symphony Form-3 Dec 2025.pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: SV Symphony Form-1 Sep 2025.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: SV Symphony Form-2 Sep 2025.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: SV Symphony Form-3 Sep 2025.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: SV Symphony Form-1 Jun 25.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: SV Symphony Form-2 June 2025.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: SV Symphony Form-3 June 2025.pdf | 23 May 2026 |
| Form 1File: Symphony Arch Form 1 202303.pdf | 31 Dec 2025 |
| Form 2File: Symphony Engr form 2 202303.pdf | 31 Dec 2025 |
| Form 3File: Symphony CA Form 3 202303.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Symphony Sold disclr 202303.pdf | 31 Dec 2025 |
| Form 1File: Symphony Arch Form 1 202309.pdf | 31 Dec 2025 |
| Form 2File: Symphony Engr Form 2 202309.pdf | 31 Dec 2025 |
| Form 3File: Symphony CA Form 3 202309.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Symphony Sold Inv disclr 202309.pdf | 31 Dec 2025 |
| Form 1File: Symphony Arch Form 1 202403.pdf | 31 Dec 2025 |
| Form 2File: Symphony Engr Form 2 202403.pdf | 31 Dec 2025 |
| Form 3File: Symphony CA Form 3 202403.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Symphony Sold Inve Disclr 202403.pdf | 31 Dec 2025 |
| Form 1File: Symphony Arch Form 1 202412.pdf | 31 Dec 2025 |
| Form 2File: Symphony Engr Form 2 202412.pdf | 31 Dec 2025 |
| Form 3File: Symphony CA Form 3 202412.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Symphony Sold Inventory Disclr 202412.pdf | 31 Dec 2025 |
| Form 5 (FY 2023-2024)File: Form-5_FY 2023-24.pdf | 31 Dec 2025 |
| Form 5 (FY 2022-2023)File: Form-5_FY 2022-23.pdf | 31 Dec 2025 |
| Form 5 (FY 2021-2022)File: Form-5 FY 2021-22.pdf | 31 Dec 2025 |
| Declaration in FORM BFile: Form B.pdf | 31 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023-24_CA_Form-5.pdf | 31 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 FY 2023-24 Q2 181123.pdf | 22 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY20425 Q1 F3 030824.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY2425 Q2 F3 201224.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY2425 Q3 F3 270125.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY202425 Q4 F3 030824.pdf | 10 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SV Symphony CA Certificate Form-3 FY 2023-24 Q2 181123.pdf | 8 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 05032025 FY202223.pdf | 6 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 July23 to Sep23 300923.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Oct23 to Dec23 020124.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 010424.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 010724.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 041024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 090125.pdf | 28 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: F2A Quality Assurance Certificate Fy 23-24 100125.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 July23 to Oct23.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Oct23 to Dec23.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 July24 to Oct 24.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Jan 24 to Mar 24 01042024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 Apr24 to June24 01072024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 July24 to Oct 24 01102024.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Oct24 to Dec24 01012025.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F 1 Apr24 to June24.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SV Sym F3 FY 2023 24 Q3.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SV Sym F3 FY 202425 Q1.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SV Sym F3 FY 2023 24 Q4.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SV Sym F3 FY 2023 24 Q2.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold details July23 to Sep23.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold details Oct23 to Dec23.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory qtr jan to march24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: inventory qtr Apr to June 24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory qtr July to sep 24.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory qtr Oct to Dec24.pdf | 27 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 Shree Vastu Symphony FY 2023 24.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202203_Er.pdf | 5 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202303_Er.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22_Form-2A.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23_Form-2A.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 202306_Sold.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 202303_Sold.pdf | 24 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 202303_Sold.pdf | 24 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202303_CA_R.pdf | 24 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202206_Ar.pdf | 23 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202209_Ar.pdf | 23 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202212_Ar.pdf | 23 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202303_Ar.pdf | 23 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 202306_Ar.pdf | 23 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202003_Er.pdf | 23 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 202103_Er.pdf | 23 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Vastu Symphony on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vihighar5,900+ in Raigarh
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Shree Vastupurti Associates
Shree Vastupurti Associates has 1 registration on MahaRERA, including Shree Vastu Symphony. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Shree Vastu Symphony is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Vastu Symphony?
The registered promoter entity is Shree Vastupurti Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Vastu Symphony?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Vastu Symphony?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Vastu Symphony?
The professionals named in the filing: Architect: Ar Neha Jain; Engineer: Nilesh Samant; Engineer: DU Consultant; Chartered Accountant: Mukund Thale; Chartered Accountant: Swapnil Mane & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Vastu Symphony?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback