Home / Browse projects / Nashik, Maharashtra / SHREE VARAD APARTMENT
SHREE VARAD APARTMENT
RG-MH-46766 · RERA P51600047143 · Last updated on MahaRERA portal: 6 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE VARAD APARTMENT is a Residential / Group Housing project by SHREE RENUKA BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600047143 on 10 Oct 2022. The registration is recorded completed; possession was promised by 31 May 2024.
At a glance
Project
- NameSHREE VARAD APARTMENT
- TypeResidential / Group Housing
- Location
- LAM ROAD
- HAGWANE MALA
- Nashik Road
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600047143
- ReraGenie IDRG-MH-46766
Builder
- NameSHREE RENUKA BUILDERS
- Entity typePartnership
- PartnersMAYUR BALASAHEB CHAUDHARI, KRISHNA BHAUSAHEB THETE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Oct 2022
- Promised completion31 May 2024
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE VARAD APARTMENT | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SHREE VARAD APARTMENT: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAVITRIBAI DATTATRAY HAGWANE | Nashik Road | Nashik |
| VISHNU DATTATRAY HAGWANE | Nashik Road | Nashik |
| ASHOK DATTATRAYA HAGAWANE | Nashik | Nashik |
| SUNIL DATTATRAYA HAGAWANE | Nashik Road | Nashik |
| BHASAKAR DATTATRAY HAGAWANE | Nashik Road | Nashik |
| SHARAD DATTATRAY HAGAWANE | Nashik Road | Nashik |
| ANIL UTTAMCHAND MULCHANDANI | Nashik Road | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIJAY P RANADE |
| Engineer | VIJAY P RANADE |
| Chartered Accountant | ABHISHEK KSHATRIYA |
| Partner | Role in project |
|---|---|
| SHREE RENUKA BUILDERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Nov 2024
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 (1).pdf | 6 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 March.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 June.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 September.pdf | 30 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (1).pdf | 30 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 compressed.pdf | 30 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 compressed.pdf | 30 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 March.pdf | 30 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 June.pdf | 30 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 September.pdf | 30 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate - Varad Appartment.pdf | 30 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventory as on 30 sep 2024.pdf | 30 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf | 30 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: september 2A FORM.pdf | 30 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 30 Nov 2024 |
| Declaration about Commencement CertificateFile: REVISED COMMENCEMENT CERTIFICATE_compressed.pdf | 4 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-2.pdf | 4 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold.pdf | 4 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 (1) compressed.pdf | 4 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Rera Form 5 certificate.pdf | 4 Mar 2024 |
| Building plan approvalFile: revised sanctioned plan_11zon.pdf | 23 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: revised sanctioned plan_11zon.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 final_20240123_0001_11zon.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTURE CERTIFICATE .pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE .pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED compressed.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RENUKA FORM 3_20230120_0001 SIGNED_compressed.pdf | 20 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Form 1.pdf | 2 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 2 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA.pdf | 2 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 2.pdf | 26 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engineer certificate.pdf | 26 Dec 2022 |
| CERSAI detailsFile: cersai report.pdf | 27 Sep 2022 |
| Details of encumbrances concerned to LegalFile: legal encumbrances litigation details.pdf | 9 Sep 2022 |
| Declaration in FORM BFile: Declaration in Form B renuka (1).pdf | 9 Sep 2022 |
| Proforma of Allotment letterFile: Agreement For Sale ANN-A NEW.pdf | 9 Sep 2022 |
| Proforma of Allotment letterFile: PROFORMA LETTER OF ALLOTMENT 831.pdf | 9 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA BANK DETAILS.pdf | 9 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: deviation report for letter of allotment.pdf | 9 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation report for agreement for sale.pdf | 9 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA RENUKA Builders_11zon.pdf | 7 Jul 2022 |
| Building plan approvalFile: PLAN .pdf | 6 Jul 2022 |
| Layout approvalFile: LAYOUT PLAN .pdf | 6 Jul 2022 |
| PAN CardFile: Renuka Builders PAN (1)_11zon.pdf | 6 Jul 2022 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT_compressed.pdf | 6 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: Renuka Self Declaration.pdf | 6 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN .pdf | 6 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN .pdf | 6 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_4_11zon.pdf | 6 Jul 2022 |
| Declaration about Commencement CertificateFile: Declaration Commencement certificate Format D.pdf | 6 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC1.pdf | 6 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG1.pdf | 6 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
Keep SHREE VARAD APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HAGWANE MALA4,100+ in Nashik
Filed coordinates, straight-line distance. 39 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: SHREE RENUKA BUILDERS
SHREE RENUKA BUILDERS has 1 registration on MahaRERA, including SHREE VARAD APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE VARAD APARTMENT is delayed beyond 31 May 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE VARAD APARTMENT?
The registered promoter entity is SHREE RENUKA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE VARAD APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE VARAD APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE VARAD APARTMENT?
The professionals named in the filing: Architect: VIJAY P RANADE; Engineer: VIJAY P RANADE; Chartered Accountant: ABHISHEK KSHATRIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE VARAD APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback