ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SHREE TOWNSHIP PHASE 2

Registered No litigation declared Others project

SHREE TOWNSHIP PHASE 2

By SHREE SHIVBALI BUILDERS PRIVATE LIMITED

RG-MH-06188 · RERA P99000053270 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 50%
13 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

SHREE TOWNSHIP PHASE 2 is a Others project by SHREE SHIVBALI BUILDERS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000053270 on 23 Oct 2023. Possession is promised by 31 Dec 2029. 13 of the 26 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE TOWNSHIP PHASE 2
  • TypeOthers
  • Location
    • KAMBALGAON
    • Palghar
    • 401501
  • Pincode401501
  • RERA no.P99000053270
  • ReraGenie IDRG-MH-06188

Builder

  • NameSHREE SHIVBALI BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27ABFCS9168J1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorROHIT SHIVBALI SINGH
  • Other registrations3 more →

Key dates

this monthRegisteredOct 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed40 files

Current status

50%13 of 26 units booked
44.7%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 WING ANA5422426

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.

BUILDING NO 1 WING A: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,113 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025
LandownerVillageDistrict
MILAN JAYANTILAL SALOTMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityCOLLECTOR
Permissible FSI1001.88
Proposed, not sanctioned1,002 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASAI EAST
Estimated costRs 2.88 cr
Cost incurredRs 1.29 cr
Work done44.69%
BuildingWingEstimatedIncurred
BUILDING NO 1 WING ANARs 2.34 crRs 1.29 cr
-NARs 54.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD S ARCHITECT
EngineerSHILPLEKHA ASSOCIATES
EngineerPRADEEP YADAV
Chartered AccountantASHWIN NAIR
PartnerRole in project
SHREE SHIVBALI BUILDERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf9 Jul 2026
Form 2A (FY 2024-2025)File: FORM 2A JULY 25.pdf28 Jul 2025
Withdrawal Update Form 1File: Form 1 june 25.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM 2 jun 25.pdf25 Jul 2025
Withdrawal Update Form 3File: form 3 jun 25.pdf25 Jul 2025
Layout approvalFile: LAYOUT OF SURVEY NO 59.pdf1 Jul 2023
Building plan approvalFile: blueprint_compressed (1)_rotated.pdf1 Jul 2023
Details of encumbrances concerned to FinanceFile: LOE FINANCE-SHIVBALI.pdf1 Jul 2023
Details of encumbrances concerned to FinanceFile: LOE LEGAL-SHIVBALI.pdf1 Jul 2023
Details of encumbrances concerned to LegalFile: LOE FINANCE-SHIVBALI.pdf1 Jul 2023
Details of encumbrances concerned to LegalFile: LOE LEGAL-SHIVBALI.pdf1 Jul 2023
Copy of Layout Approval (in case of layout)File: LAYOUT OF SURVEY NO 59.pdf1 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: blueprint_compressed (1)_rotated.pdf1 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed (2).pdf1 Jul 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC-SHIVBALI.pdf1 Jul 2023
Declaration in FORM BFile: FORM B-OWNER(SHIVBALI).pdf1 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 S NO 59.pdf1 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 Jul 2023
CERSAI detailsFile: CERSAI-SHIVBALI.pdf1 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-SHIVBALI.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE-ROHIT SINGH.pdf1 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE-AMIT SINGH.pdf1 Jul 2023
Proforma of Agreement for saleFile: DRAFT AGGREMENT.pdf1 Jul 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf1 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A-SHIVBALI.pdf1 Jul 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER-SHIVBALI.pdf1 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT-SHIVBALI.pdf1 Jul 2023
PAN CardFile: SHREE SHIVBALI PAN.pdf22 Jun 2023
Copy of the legal title reportFile: Title in rera format of BLDG NO 01.pdf22 Jun 2023

How this compares with Palghar

50%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE TOWNSHIP PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KAMBALGAON3,200+ in Palghar

Builder: SHREE SHIVBALI BUILDERS PRIVATE LIMITED

SHREE SHIVBALI BUILDERS PRIVATE LIMITED has 4 registrations on MahaRERA, including AKSHAY ENCLAVE and SHREE TOWNSHIP PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREE TOWNSHIP PHASE 2 is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE TOWNSHIP PHASE 2?

The registered promoter entity is SHREE SHIVBALI BUILDERS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27ABFCS9168J1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE TOWNSHIP PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE TOWNSHIP PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE TOWNSHIP PHASE 2?

The professionals named in the filing: Architect: D S ARCHITECT; Engineer: SHILPLEKHA ASSOCIATES; Engineer: PRADEEP YADAV; Chartered Accountant: ASHWIN NAIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE TOWNSHIP PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE TOWNSHIP PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE TOWNSHIP PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.