Home / Browse projects / Mumbai Suburban, Maharashtra / Shree Swami Samarth Krupa
Shree Swami Samarth Krupa
RG-MH-73833 · RERA P51800018673 · Last updated on MahaRERA portal: 19 Apr 2023
Source: official MahaRERA filing
Red flags
- 3 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Swami Samarth Krupa is a Residential / Group Housing project by Shoreline Builders Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018673 on 27 Nov 2018. The registration is recorded completed; possession was promised by 15 Aug 2024. 3 complaints are on record with the regulator.
At a glance
Project
- NameShree Swami Samarth Krupa
- TypeResidential / Group Housing
- Location
- Off S G Barve Road
- Nehru Nagar Kurla
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800018673
- ReraGenie IDRG-MH-73833
Builder
- NameShoreline Builders Pvt Ltd
- Entity typeOthers
- Named personVivek
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Nov 2018
- Promised completion15 Aug 2024
- Revised completionNone
- Buildings2 building records
- Documents filed50 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Jai Jaywanti CHS Ltd | NA | 19 | 0 | 0 | 0 | 0 |
| Jai Jaywanti CHS Ltd - NA | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 19 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 35%.
Jai Jaywanti CHS Ltd40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 35% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Jai Jaywanti CHS Ltd - NA0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed61
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Jay Jaiwanti CHS Ltd | Kurla | Mumbai Suburban |
| M/S. Star Deluxe | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Atul Situt And Associates |
| Engineer | N S Lele And Associates |
| Partner | Role in project |
|---|---|
| Shoreline Builders Pvt Ltd | - |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303495 | SURESH DAWRE | SHEROLINE BUILDER AND HARSHADA RAJENDRA SHAH | 29/11/2022 |
| CC12400379 | Sheldon Karkada | Rajendra Shah | 09/10/2024 |
| CC12502095 | PRASHANT KHAVNEKAR | Shoreline Builders Pvt Ltd | 26/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Nov 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Nov 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Dec 2022
Documents filed50
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Form 3_Shree Swami Samarth Krupa_Final_compressed (1).pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Shoreline_Form 5 21-22.pdf | 14 Mar 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Jai Jayawanti Reg Cert 001.pdf | 14 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances declaration SBPL.pdf | 17 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances declaration SBPL.pdf | 17 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate SBPL.pdf | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 17 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 new.pdf | 17 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM - 2A.pdf | 17 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 17 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account SBPL .pdf | 17 Feb 2023 |
| Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf | 22 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full O C 19 DEC 2022.pdf | 22 Dec 2022 |
| Building plan approvalFile: IOD.pdf | 18 Aug 2022 |
| Building Plan Approval (IOD)File: IOD.pdf | 18 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: C C.pdf | 18 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: IOD AND CC UPTO 17 FLOOR.pdf | 23 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1Architect Certificate.pdf | 22 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Quality Assurance Certificate.pdf | 22 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance Certificate.pdf | 15 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_Upload.pdf | 7 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 28 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory_compressed.pdf | 28 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate.pdf | 28 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 13 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Shoreline_Form 5_18-19_compressed.pdf | 26 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shoreline_Form 5_19-20_compressed.pdf | 26 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Shoreline_Form 5_20-21_compressed.pdf | 26 Jul 2021 |
| Details of Restarting of Construction work post lockdownFile: Self Declaration_Construction Work post Lockdown.pdf | 29 Aug 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf | 26 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: Shoreline_Form 5_18-19_compressed.pdf | 1 Oct 2019 |
| Proforma of Allotment letterFile: Allottment Letter.pdf | 1 Jul 2019 |
| OtherFile: Allottment Letter.pdf | 1 Jul 2019 |
| Declaration in FORM BFile: Form B26112018154230.pdf | 26 Nov 2018 |
| Building plan approvalFile: IOD 1 8 aug.pdf | 18 Nov 2018 |
| Building plan approvalFile: IOD 2 8 aug.pdf | 18 Nov 2018 |
| Building plan approvalFile: IOD 3 8 aug.pdf | 18 Nov 2018 |
| Layout approvalFile: Layout drgs_Compressed.pdf | 18 Nov 2018 |
| Copy of the legal title reportFile: Title Report.pdf | 18 Nov 2018 |
| Details of encumbrancesFile: Encrumbances.pdf | 18 Nov 2018 |
| Copy of Layout Approval (in case of layout)File: Layout drgs_Compressed.pdf | 18 Nov 2018 |
| Building Plan Approval (IOD)File: IOD 1 8 aug.pdf | 18 Nov 2018 |
| Building Plan Approval (IOD)File: IOD 2 8 aug.pdf | 18 Nov 2018 |
| Building Plan Approval (IOD)File: IOD 3 8 aug.pdf | 18 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-compressed.pdf | 18 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CCI-compressed.pdf | 18 Nov 2018 |
| Certificates of CA (Form 3)File: Form 3.pdf | 18 Nov 2018 |
| Proforma of Allotment letterFile: Allottment Letter-.pdf | 18 Nov 2018 |
| Proforma of Allotment letterFile: Agreement for Sale.pdf | 18 Nov 2018 |
| PAN CardFile: Pancard.pdf | 5 Sep 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 50 filed documents as one ZIP, foldered, with a manifest
Keep Shree Swami Samarth Krupa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nehru Nagar Kurla6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 351 registered projects within 2 km.
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Ruparel Crest
BHARAT MAHAN DEVELOPERS & BUILDERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
See every Mumbai Suburban project, with the district possession charts
Builder: Shoreline Builders Pvt Ltd
Shoreline Builders Pvt Ltd has 1 registration on MahaRERA, including Shree Swami Samarth Krupa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Shree Swami Samarth Krupa is delayed beyond 15 Aug 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Swami Samarth Krupa?
The registered promoter entity is Shoreline Builders Pvt Ltd, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Swami Samarth Krupa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Shree Swami Samarth Krupa?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Shree Swami Samarth Krupa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Swami Samarth Krupa?
The professionals named in the filing: Architect: Atul Situt And Associates; Engineer: N S Lele And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Swami Samarth Krupa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback