ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / SHREE SIDDHI HEIGHTS

Registered No litigation declared Residential / Group Housing project

SHREE SIDDHI HEIGHTS

By ABHAY YASHWANT THITE

RG-MH-20212 · RERA P99000007407 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 87 months
  • 6 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 87 months from the original
0 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 98%
41 of 191Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SHREE SIDDHI HEIGHTS is a Residential / Group Housing project by ABHAY YASHWANT THITE in Palghar, Maharashtra, registered with MahaRERA as P99000007407 on 17 Aug 2017. Possession is promised by 31 Mar 2027. The completion date has moved by 87 months from the original filing. 150 of the 191 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSHREE SIDDHI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • near on the way hotel
    • VIRAR(west)
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000007407
  • ReraGenie IDRG-MH-20212

Builder

  • NameABHAY YASHWANT THITE
  • Entity typeIndividual

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed87 files

Current status

79%150 of 191 units booked
97.8%Work done, per cost certificate

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SIDDHI HEIGHTS BUILDING ANA1313623294
SHREE SIDDHI HEIGHTS BUILDING NO BNA1313633497

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.

SHREE SIDDHI HEIGHTS BUILDING A77%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor95%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
SHREE SIDDHI HEIGHTS BUILDING NO B77%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)0%
Plinth95%
Stilt Floor95%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Open Space14
BuildingOpen SpaceTotal
SHREE SIDDHI HEIGHTS BUILDING A77
SHREE SIDDHI HEIGHTS BUILDING NO B77

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,308 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Apr 2026

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI10771.48
Proposed, not sanctioned10,759 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVIRAR WEST
Estimated costRs 18.36 cr
Cost incurredRs 17.95 cr
Work done97.76%
BuildingWingEstimatedIncurred
SHREE SIDDHI HEIGHTS BUILDING NO BNARs 14.49 crRs 14.20 cr
-NARs 2.40 crRs 2.35 cr
SHREE SIDDHI HEIGHTS BUILDING ANARs 1.47 crRs 1.40 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHIVPRASAD MAHAJAN
ArchitectDESIGN CONSORTUIM
EngineerPRAKASH SAINI
Chartered AccountantDOLLY MILAN ASHER
Chartered AccountantRAMAN SHAH
PartnerRole in project
ABHAY YASHWANT THITE-

Extensions applied for6

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000002429Dec 2019 → Dec 2020

Reason as filed by the promoterCHANGE OF CONTRACTOR AND DELAY IN GETTING REVISED C.C. AND AS PER NEW RULE FOR PARKING IMPOSED BY MUNCIPAL CORPORATION WE ARE BUILDING PARKING TOWER.

EXT99000012645Dec 2019 → Sep 2023

Reason as filed by the promoterDUE TO COVID AND FINANCIAL CRISES.

EXT99000009574Dec 2019 → Mar 2022

Reason as filed by the promoterThe project is nearly complete, however only Car Parking mechanism is pending due to shortage of Car parking machinery is the whole market due to Covid-19 due to which OC is pending, we have appointed new contractor for Car Parking mechanism and work has started. We will ensure that we will fully complete the project very soon and obtain the OC. We have uploaded form 5, disclosure of sold & unsold units as well as consents of 70 buyers out of 124 sold units, i.e. more than 50% already and rest consents are also in process. (The data appearing in summary is wrong ie. total no. of Apartment is o

EXT99000017738Dec 2019 → Sep 2024

Reason as filed by the promoterDELAY DUE TO INSTALLATION OF PARKING TOWER

EXT99000025144Dec 2019 → Sep 2025

Reason as filed by the promoterDELAY DUE TO PARKING TOWER

EA02052620810Dec 2019 → Mar 2027

Reason as filed by the promoterDelay due to pending of mechnical parking tower works now at finising stage.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000023086MR. George Philip LopesMr. Abhay Thite24/01/2018
CC006000000057073MR. YOGESH KANTILAL RAVALM/S SHREE SIDDHI DEVELOPERS27/11/2018
CC006000000303032Bhupesh Pandurang NaikShree Siddhi Developers13/10/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Nov 2024

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 30 6 25.pdf14 Apr 2026
Withdrawal Update Form 1File: form 1 30 9 25.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 30 06 25.pdf14 Apr 2026
Withdrawal Update Form 2File: Form 2 30 09 25.pdf14 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (1) SIGNED.pdf14 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (1) SIGNED.pdf14 Apr 2026
Disclosure of sold/ booked inventoryFile: sold unsold list.pdf18 Dec 2024
Declaration in FORM BFile: shree siddhi affidavit.pdf22 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf22 Nov 2024
Certificates of CA (Form 3)File: form 3_11zon.pdf22 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: from 2.pdf22 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: sold unsold list 1.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: sold unsold list.pdf22 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf22 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24.pdf18 Nov 2024
Declaration in FORM BFile: AffidavitCumDeclaration.pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CertificateOfPercentage.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ilovepdf_merged (2)_compressed.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: EngineersCertificate.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: DisclosureOfSoldBooked_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: Form3_compressed.pdf12 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: AnnexureA.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ReportOnStatementOfAccounts.pdf12 Oct 2023
Proforma of Agreement for saleFile: AGREEMENT.pdf12 Oct 2023
Details of encumbrances concerned to LegalFile: concern letter.pdf3 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200248852676_For_Asset_Based_Search_03_10_2022_16_38_55_482.pdf3 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021-22.pdf3 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-22 NEW.pdf3 Oct 2022
Proforma of Allotment letterFile: Annexure A.pdf3 Oct 2022
Proforma of Allotment letterFile: Annexure 1 SSD.pdf3 Oct 2022
Proforma of Allotment letterFile: AGREEMENT DRAFT_merged.pdf3 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about bank ac.pdf3 Oct 2022
Deviation Report with respect to Allotment letterFile: Deviation report For allottment letter.pdf3 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale.pdf3 Oct 2022
Proforma of Allotment letterFile: Draft Agreement SSD.pdf4 Feb 2022
Details of encumbrancesFile: Adobe Scan 07 Oct 2021.pdf7 Oct 2021
Declaration about Commencement CertificateFile: Declaration about CC.pdf29 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf29 Jun 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: download.pdf29 Jun 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form V-18-19-ShreeSiddhi.pdf22 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form V-2019-20-shreesiddhi.pdf22 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Siddhi developers.pdf28 Jan 2020
Certificates of CA (Form 5)File: ABHAY THITE FORM 5.pdf4 Feb 2019
Building plan approvalFile: BOP 1 7.pdf25 Dec 2018
Building plan approvalFile: BOP 2 7.pdf25 Dec 2018
Building plan approvalFile: BOP 3 7.pdf25 Dec 2018
Building plan approvalFile: BOP 5 7.pdf25 Dec 2018
Building plan approvalFile: BOP 6 7.pdf25 Dec 2018
Building plan approvalFile: BOP 7 7.pdf25 Dec 2018
Building plan approvalFile: BOP 4 7 (1).pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 1 7.pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 2 7.pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 3 7.pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 5 7.pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 6 7.pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 7 7.pdf25 Dec 2018
Building Plan Approval (IOD)File: BOP 4 7 (1).pdf25 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITEC.pdf25 Dec 2018
Certificates of CA (Form 3)File: CA CER 25 12.pdf25 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf24 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate.pdf24 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate.pdf28 Feb 2018
Certificates of CA (Form 3)File: C A Cerificate.pdf28 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 0280.pdf12 Feb 2018
Layout approvalFile: Layout Plan Plot No 4.pdf31 Jul 2017
Copy of the legal title reportFile: Title Clearance and Certificate Plot no 2.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate Search Report Plot 4.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan Plot No 4.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Shree Ganesh.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Shree Krupa.pdf31 Jul 2017
Certificates of CA (Form 3)File: C A Certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: Declaration.pdf31 Jul 2017
OtherFile: Consent Letter.pdf31 Jul 2017
OtherFile: Mhada.pdf31 Jul 2017
OtherFile: SOC.pdf31 Jul 2017
Building plan approvalFile: Layout Plan Plot No 4.pdf29 Jul 2017
Layout approvalFile: Layout Plan Plot No 2.pdf29 Jul 2017

How this compares with Palghar

79%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 87 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SIDDHI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR(west)3,200+ in Palghar

2 kmSHREE SIDDHI HEIGHTSCompleted 33Lapsed / revoked 23Other 86Dot size: filed unitsN

Filed coordinates, straight-line distance. 142 registered projects within 2 km.

Builder: ABHAY YASHWANT THITE

ABHAY YASHWANT THITE has 1 registration on MahaRERA, including SHREE SIDDHI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREE SIDDHI HEIGHTS is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SIDDHI HEIGHTS?

The registered promoter entity is ABHAY YASHWANT THITE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SIDDHI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREE SIDDHI HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREE SIDDHI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SIDDHI HEIGHTS?

The professionals named in the filing: Architect: SHIVPRASAD MAHAJAN; Architect: DESIGN CONSORTUIM; Engineer: PRAKASH SAINI; Chartered Accountant: DOLLY MILAN ASHER; Chartered Accountant: RAMAN SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SIDDHI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SIDDHI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SIDDHI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.