Home / Browse projects / Mumbai Suburban, Maharashtra / SHREE SIDDHI BLDG NO 69
SHREE SIDDHI BLDG NO 69
By HIRANIMANTHAN BUILDERS AND DEVELOPERS
RG-MH-10915 · RERA P51800003413 · Last updated on MahaRERA portal: 20 Jun 2023
Source: official MahaRERA filing
Red flags
- Completion date moved by 48 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE SIDDHI BLDG NO 69 is a Residential / Group Housing project by HIRANIMANTHAN BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003413 on 5 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2024. The completion date has moved by 48 months from the original filing.
At a glance
Project
- NameSHREE SIDDHI BLDG NO 69
- TypeResidential / Group Housing
- Location
- Nehru Nagar
- Kurla
- Mumbai Suburban
- 400024
- Pincode400024
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800003413
- ReraGenie IDRG-MH-10915
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Aug 2017
- Promised completion31 Mar 2024
- Revised completionRevised to 31 Mar 2024 (originally 31 Mar 2020)
- Buildings1 building record
- Documents filed87 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE SIDDHI CHS | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHREE SIDDHI CHS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| DINESH SAWANT | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KISHORE LOTLIKAR |
| Engineer | NIRANJAN SHREEPAD LELE |
| Partner | Role in project |
|---|---|
| HIRANIMANTHAN BUILDERS AND DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per the CC received from MHADA on October 2019 we would require this time to complete the work of approved BUA.
Reason as filed by the promoterDue to change in Development Control Rules we had got additional FSI to use. We had started construction for the additional FSI we got. We had taken necessary consent from the customer for extending project completion date
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Nov 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Jun 2023
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf | 20 Jun 2023 |
| Other - FinanceFile: bank project closure letter.pdf | 20 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OCC and BCC Approved of Bldg no-69 Shree Siddhi CHS Ltd NN Dt-12-06-2023.pdf | 16 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-ARCH-69-MARCH23.pdf | 26 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG-69-DEC22.pdf | 7 Feb 2023 |
| Certificates of CA (Form 3)File: 69-CA-RERA-DEC22.pdf | 7 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH-69-DEC23.pdf | 24 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 69 - RERA Form 5 - Mar 22_compressed.pdf | 17 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 69 quality certificate rera.pdf | 13 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 69 ARCH Q2.pdf | 14 Oct 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Soc Regn Cert 69.pdf | 24 Sep 2022 |
| Certificates of CA (Form 3)File: Certificate HMBD Bldg 69 AY 2022-23_compressed.pdf | 23 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-69-ARCH-JUNE22.pdf | 27 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 69 quality certificate rera.pdf | 19 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BLDG_NO_-_69_RERA_CERTIFICATE_DATED_-_18-04-2022.pdf | 2 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 69-RERA-MARCH22N.pdf | 2 Jun 2022 |
| Certificates of CA (Form 3)File: Rera-69-ca-march22_compressed.pdf | 2 Jun 2022 |
| CERSAI detailsFile: CERSAI FINAL.pdf | 21 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure Bldg no 69.pdf | 21 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: bldg no 69_compressed.pdf | 9 Mar 2022 |
| Layout approvalFile: plan_compressed (1).pdf | 2 Nov 2021 |
| Copy of Layout Approval (in case of layout)File: plan_compressed (1).pdf | 2 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC of bldg no69 19 floors.pdf | 2 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH Q2 21-22.pdf | 24 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng-cer-69-sept21.pdf | 24 Oct 2021 |
| Certificates of CA (Form 3)File: CA CETIFICATE Q2.pdf | 24 Oct 2021 |
| Declaration about Commencement CertificateFile: DECLARATION LETTER-69.pdf | 10 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE LIST-69.pdf | 10 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-69-ARCH-FORM-1-MARCH21.pdf | 15 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA-69-ENG-FORM2-MARCH21.pdf | 15 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM2A-69.pdf | 15 Jul 2021 |
| Certificates of CA (Form 3)File: RERA-69-CA-FORM-3-MARCH21.pdf | 15 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf | 15 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA-69-CA-5A-19-20.pdf | 15 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BLDG_NO_-_69_RERA_CERTIFICATE_DATED_-_01-10-2020.pdf | 1 Mar 2021 |
| Certificates of CA (Form 5)File: Full set HMBD K 69 Rera Certificate Sept 20_compressed.pdf | 1 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG-JUNE20-69_compressed.pdf | 27 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BLDG_NO_-_69_RERA_CERTIFICATE_DATED_-_01-08-2020_compressed.pdf | 19 Oct 2020 |
| Certificates of CA (Form 3)File: 69 -HMBD - Rera Certificate - June 20_compressed.pdf | 19 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT BLDG NO 69 MAR 2020.pdf | 24 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CERT 69 MAR 2020.pdf | 24 Sep 2020 |
| Certificates of CA (Form 3)File: HMBD Bldg No 69 CA CERT MAR 2020.pdf | 24 Sep 2020 |
| Details of encumbrancesFile: Bldg no 69 Encumbrance GeeCee.pdf | 29 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: bldg no 69.pdf | 10 Dec 2019 |
| Certificates of CA (Form 5)File: Bldg 69 Form 5.pdf | 10 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 69 151019 MHADA.pdf | 19 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH 69 SEPT 19.pdf | 19 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bldg 69 Engineer Sept 19.pdf | 19 Nov 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 69 Sept 2019.pdf | 19 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH 69 SEPT 19.pdf | 18 Nov 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bldg 69 Engineer Sept 19.pdf | 18 Nov 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 69 Sept 2019.pdf | 18 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Bldg no 69.pdf | 20 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bldg no 69.pdf | 20 Aug 2019 |
| Certificates of CA (Form 3)File: Bldg no 69.pdf | 20 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: rera-69-17-4-19.pdf | 2 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate 69.pdf | 2 May 2019 |
| Certificates of CA (Form 3)File: bldg no 69.pdf | 2 May 2019 |
| Certificates of CA (Form 5)File: BLDG NO 69.pdf | 1 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED CC 4-10-18-69.pdf | 29 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH-69-DEC18.pdf | 29 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG CER 69 DEC 18.pdf | 29 Jan 2019 |
| Certificates of CA (Form 3)File: Rera Certificate - 69.pdf | 29 Jan 2019 |
| Proforma of Allotment letterFile: RERA-69.pdf | 29 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 69.pdf | 15 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG-146-SEPT18.pdf | 15 Jan 2019 |
| Certificates of CA (Form 3)File: Bldg no 69.pdf | 15 Jan 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE-69-JULY18.pdf | 11 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 69-RERA-JUNE18 ARCH.pdf | 4 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 69-ENG CERT JULY18.pdf | 4 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 69archcert.pdf | 1 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 69enggcert.pdf | 1 Nov 2017 |
| Certificates of CA (Form 3)File: 69cacert.pdf | 1 Nov 2017 |
| Layout approvalFile: layout69.pdf | 29 Jul 2017 |
| Building plan approvalFile: iod69.pdf | 29 Jul 2017 |
| PAN CardFile: HMBD-PAN CARD.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: searchtitlecertificate69.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Bldg No-69.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: layout69.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: iod69.pdf | 29 Jul 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MEGHDOOT CHS | MEGHDOOT CHS BUIDLING NO 73 NEHRU NAGAR KURLA EAST MUMBAI 400024 | 51 | Completed | Nov 2010 | Late, Dec 2010 |
| ANTARIKSH CHS | ANTARIKSH CHS BUILDING NO 43 NEHRU NAGAR KURLA EAST MUMBAI 400024 | 75 | Completed | Feb 2008 | Late, Mar 2008 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep SHREE SIDDHI BLDG NO 69 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nehru nagar6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 360 registered projects within 2 km.
Ruparel Urbana
R R Builders
SKYVIEW CHS
HIRANIMANTHAN BUILDERS AND DEVELOPERS
Ruparel Crest
BHARAT MAHAN DEVELOPERS & BUILDERS
Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd
VIKAS NARAYAN RAIKAR
Pearl Grace
Pearl Concept Habitat LLP
SAYBA CRYSTAL
AMOOL ENTERPRISES
See every Mumbai Suburban project, with the district possession charts
Builder: HIRANIMANTHAN BUILDERS AND DEVELOPERS
HIRANIMANTHAN BUILDERS AND DEVELOPERS has 6 registrations on MahaRERA, including SKYVIEW CHS and SHREE SIDDHI BLDG NO 69. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SHREE SIDDHI BLDG NO 69 is delayed beyond 31 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE SIDDHI BLDG NO 69?
The registered promoter entity is HIRANIMANTHAN BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE SIDDHI BLDG NO 69?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE SIDDHI BLDG NO 69?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE SIDDHI BLDG NO 69?
The professionals named in the filing: Architect: KISHORE LOTLIKAR; Engineer: NIRANJAN SHREEPAD LELE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SIDDHI BLDG NO 69?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback