Home / Browse projects / Nagpur, Maharashtra / SHREE SIDDHESHWAR NAGAR 2

Registered No litigation declared Residential / Group Housing project

SHREE SIDDHESHWAR NAGAR 2

By SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED

RG-MH-03603 · RERA P50500029571 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 36 months from the original
17 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 96%
310 of 310Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

SHREE SIDDHESHWAR NAGAR 2 is a Residential / Group Housing project by SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500029571 on 4 Jun 2021. Possession is promised by 31 Mar 2028. The completion date has moved by 36 months from the original filing. 0 of the 310 units on this registration are recorded sold or booked, and 17 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHREE SIDDHESHWAR NAGAR 2
  • TypeResidential / Group Housing
  • Location
    • VELA HARISHCHANDRA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500029571
  • ReraGenie IDRG-MH-03603

Builder

  • NameSHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45209MH2013PTC249169
  • GSTIN27AATCS9773N1Z0
  • Managing DirectorsRUPALI VARUN ZADE, SWATI RAHUL ZADE, VARUN SUDHAAR ZADE, RAHUL SUDHAKAR ZADE
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2021First promiseMar 2025Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jun 2021
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 31 Mar 2025)
  • Buildings3 building records
  • Documents filed139 files

Current status

0%0 of 310 units booked
91.5%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE SIDDHESHWAR NAGAR 2NA14122640264
SHREE SIDDHESHWAR NAGAR 2NA2220020
SHREE SIDDHESHWAR NAGAR 2NA3202626

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 96%.

SHREE SIDDHESHWAR NAGAR 253%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks66%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.18%
SHREE SIDDHESHWAR NAGAR 291%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SHREE SIDDHESHWAR NAGAR 260%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises69%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.21%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes46%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes84%
Storm Water DrainsYes54%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes32%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes28%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed667

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots667
Closed/Covered667
BuildingClosed/CoveredTotal
SHREE SIDDHESHWAR NAGAR 2582582
SHREE SIDDHESHWAR NAGAR 24242
SHREE SIDDHESHWAR NAGAR 24343

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,680 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Dec 2025

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority (NMRDA)
Permissible FSI36801.82
Proposed, not sanctioned29,135 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANEWADA BRANCH
Estimated costRs 38.96 cr
Cost incurredRs 35.63 cr
Work done91.45%
BuildingWingEstimatedIncurred
SHREE SIDDHESHWAR NAGAR 2NARs 33.18 crRs 30.03 cr
SHREE SIDDHESHWAR NAGAR 2NARs 3.24 crRs 3.24 cr
SHREE SIDDHESHWAR NAGAR 2NARs 2.54 crRs 2.36 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectC D GIRIPUNJE
ArchitectCHANDRASHEKHAR DEOCHAND GIRIPUNJE
EngineerC D GIRIPUNJE
EngineerSUDESH BHIMRAO MALODE
Chartered AccountantDILIP LOHIYA
Chartered AccountantSANJAY S AGRAWAL AND CO
Chartered AccountantSANJAY S AGARWAL AND CO
Chartered AccountantGAD & ASSOCIATES
Chartered AccountantSUMIT SANTOSH AGRAWAL AND ASSOCIATES
PartnerRole in project
SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500028155Mar 2025 → Mar 2028

Reason as filed by the promoterTo: The Real Estate Regulatory Authority (RERA), 6th floor, Housfin Bhavan, Plot No. C-21, E Block, BKC, Bandra East, Mumbai-400051. Subject: Request for Grant of Extension of Project “SHREE SIDDHESHWAR NAGAR 2” (RERA No. P50500029571) Respected Sir/Madam, We, M/s. Shree Siddheshwar Infraventures Private Limited, the Promoters of the MahaRERA registered project “SHREE SIDDHESHWAR NAGAR 2”, located at KH NO 35 PART at Nagpur (M Corp.), Nagpur (Urban), Nagpur, 441108, through our Director and Authorized Signatory Shri Rahul S/o Sudhakar Zade, respectfully submit this application for extension of

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 11Q3Oct23ToDec23.pdf19 Apr 2026
Withdrawal Update Form 2File: 8FORM2Q420222023.pdf19 Apr 2026
Withdrawal Update Form 3File: 4Q4FY20222311zon.pdf19 Apr 2026
Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 SCANNED.pdf2 Feb 2026
Withdrawal Update Form 1File: 11Q3Oct23ToDec23.pdf20 Jan 2026
Withdrawal Update Form 1File: 11Q3Oct23ToDec23.pdf20 Jan 2026
Withdrawal Update Form 1File: 11Q3Oct23ToDec23.pdf20 Jan 2026
Withdrawal Update Form 2File: 8FORM2Q420222023.pdf20 Jan 2026
Withdrawal Update Form 2File: 8FORM2Q420222023.pdf20 Jan 2026
Withdrawal Update Form 2File: 8FORM2Q420222023.pdf20 Jan 2026
Withdrawal Update Form 3File: 4Q4FY20222311zon.pdf20 Jan 2026
Withdrawal Update Form 3File: 4Q4FY20222311zon.pdf20 Jan 2026
Withdrawal Update Form 3File: 4Q4FY20222311zon.pdf20 Jan 2026
Layout approvalFile: LAYOUT.pdf12 Dec 2025
Building plan approvalFile: PLAN 1_compressed (1).pdf12 Dec 2025
Building plan approvalFile: PLAN 2_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 3_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 4_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 5_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 6_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 7_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 8_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 8_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 9_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 10_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 11_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 12_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 13_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 14_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 15_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 16_compressed.pdf12 Dec 2025
Building plan approvalFile: PLAN 17.pdf12 Dec 2025
Building plan approvalFile: PLAN 18.pdf12 Dec 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT-A.pdf3 May 2025
Declaration in FORM BFile: FORM-B.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf2 May 2025
CERSAI detailsFile: CERSAI.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5_MAR-22.pdf2 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Int_rahul zade.pdf2 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Int_Rupali Zade.pdf2 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Int_Swati rahul zade.pdf2 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Int_Varun zade.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5_MAR-23.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5_MAR-24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: jun 2021.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: sep 2021.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: dec 2021.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: mar 2022.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: jun 2022.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: sep 2022.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: dec 2022.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: mar 2023.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: jun 2023.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: sep 2023.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: dec 2023.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: mar 2024.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: jun 2024.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: jun 2024.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: sep 2024.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: dec 2024.pdf1 May 2025
VISTAAR (1)_compressed29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Shree siddheshwar infraventures private limited.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Shree siddheshwar infraventures private limited.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Shree siddheshwar infraventures private limited.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Shree siddheshwar infraventures private limited.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf1 Apr 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITEDP50500025408VELA HARISHCHANDRA, Nagpur37May 2020OngoingNov 2022Not delivered

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 36 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE SIDDHESHWAR NAGAR 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VELA HARISHCHANDRA2,800+ in Nagpur

2 kmSHREE SIDDHESHWAR NAGAR Completed 12Lapsed / revoked 14Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED

SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED has 1 registration on MahaRERA, including SHREE SIDDHESHWAR NAGAR 2. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SHREE SIDDHESHWAR NAGAR 2 is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE SIDDHESHWAR NAGAR 2?

The registered promoter entity is SHREE SIDDHESHWAR INFRAVENTURES PRIVATE LIMITED, a company as per the filing. Its CIN U45209MH2013PTC249169 and GSTIN 27AATCS9773N1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE SIDDHESHWAR NAGAR 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE SIDDHESHWAR NAGAR 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE SIDDHESHWAR NAGAR 2?

The professionals named in the filing: Architect: C D GIRIPUNJE; Architect: CHANDRASHEKHAR DEOCHAND GIRIPUNJE; Engineer: C D GIRIPUNJE; Engineer: SUDESH BHIMRAO MALODE; Chartered Accountant: DILIP LOHIYA; Chartered Accountant: SANJAY S AGRAWAL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE SIDDHESHWAR NAGAR 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE SIDDHESHWAR NAGAR 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE SIDDHESHWAR NAGAR 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.