SHREE SANKET EMPIRE
RG-MH-07798 · RERA P51600007618 · Last updated on MahaRERA portal: 3 Aug 2023
Source: official MahaRERA filing
Red flags
- Completion date moved by 75 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE SANKET EMPIRE is a Commercial project by SHREE SANKET DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600007618 on 17 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2024. The completion date has moved by 75 months from the original filing.
At a glance
Project
- NameSHREE SANKET EMPIRE
- TypeCommercial
- Location
- -
- Sangameshwar (CT)
- Malegaon
- Nashik
- 423203
- Pincode423203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600007618
- ReraGenie IDRG-MH-07798
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Aug 2017
- Promised completion31 Mar 2024
- Revised completionRevised to 31 Mar 2024 (originally 31 Dec 2017)
- Buildings2 building records
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE SANKET EMPIRE | NA | 6 | 0 | 0 | 0 | 0 |
| SHREE SANKET EMPIRE | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 3 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
SHREE SANKET EMPIRE91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SHREE SANKET EMPIRE91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed89
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SHREE SANKET EMPIRE | 15 | 0 | 15 |
| SHREE SANKET EMPIRE | 15 | 59 | 74 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KABRA AND SHAH ASSOCIATES |
| Engineer | PRASANNA MANOHAR BHORE |
| Partner | Role in project |
|---|---|
| SHREE SANKET DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterConstruction activity has not been completed due to non-availability of material issue.
Reason as filed by the promoterWE HAVE APPLIED FOR OCCUPANCY CERTIFICATE TO LOCAL PLANNING AUTHORITY WITHIN DUE DATE. HOWEVER, WE DID NOT RECEIVE COPY OF COMPLETION CERTIFICATE FROM LOCAL PLANNING AUTHORITY IN DUE TIME. HENCE, WE ARE APPLYING FOR EXTENTION
Litigation declared1
| Case | Court | Status |
|---|---|---|
| SUIT NO 53 AND APPLICATION NO 50/2015 | ADD DISTRICT COURT DIV MALEGAON | MATTERS ARE FIXED FOR HEARING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Jan 2023
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_Sanket Empire_310318.pdf | 3 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_Sanket Empire_310319.pdf | 3 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_Sanket Empire_310320.pdf | 3 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_Sanket Empire_310321.pdf | 3 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form - 1_Sanket Empire_310322.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2_Sanket Empire_310318.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2_Sanket Empire_310319.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2_Sanket Empire_310320.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2_Sanket Empire_310321.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2_Sanket Empire_310322.pdf | 3 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_18-19.PDF | 26 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_19-20.PDF | 26 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_20-21.PDF | 26 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_21-22.PDF | 26 Jul 2023 |
| CERSAI detailsFile: CERSAI_Undertaking.pdf | 14 Jul 2023 |
| Declaration in FORM BFile: Form B_Sanket Empire Extention_compressed.pdf | 8 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booking Inventory .PDF | 8 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2A_FY 19-20.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2A_FY 20-21.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: From 2A_FY 21-22.pdf | 6 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: From 2A_FY 22-23.pdf | 6 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 - Shree Sanket Empire_310318.pdf | 27 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - Shree Sanket Empire_310319.pdf | 27 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - Shree Sanket Empire_310320.pdf | 27 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - Shree Sanket Empire_310321.pdf | 27 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 - Shree Sanket Empire_310322.pdf | 27 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Non Encumbrance Legal.pdf | 6 May 2023 |
| Details of encumbrances concerned to LegalFile: Non Encumbrance Legal.pdf | 6 May 2023 |
| Declaration about Commencement CertificateFile: Form D_Declaration about Commencement.pdf | 6 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Ac.pdf | 1 May 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation AL.pdf | 1 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf | 1 May 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Certificate Corporation .PDF | 20 Jan 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Completion Certificate.pdf | 10 Sep 2019 |
| Certificates of CA (Form 5)File: Shree Sanket Empire Form 5.pdf | 6 Oct 2018 |
| Building plan approvalFile: Revised Plan Sanket.pdf | 31 Jul 2017 |
| Building plan approvalFile: Revised Plan 2 Sanket.pdf | 31 Jul 2017 |
| Building plan approvalFile: Building Plan New.pdf | 31 Jul 2017 |
| Layout approvalFile: Lay Out Sanket.pdf | 31 Jul 2017 |
| PAN CardFile: PAN CARD.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Titile Certificate Sanket.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: No Encumbrance.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Lay Out Sanket.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Building Plan New.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Revised Plan Sanket.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Revised Plan 2 Sanket.pdf | 31 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Malegaon Municipal Corporation.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -compressed.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng certificate Sanket Empire.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate Sanket.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: model-form-of-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdf | 31 Jul 2017 |
| OtherFile: Authority Letter.pdf | 31 Jul 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| SHREE SANKET GARDENP51600003519 | Near Hotel Yash Garden, Nilgavhan Shivar, Nashik | - | Aug 2017 | Completed | Aug 2023Registered original: Jan 2022 | May 2023 |
| SANKET EMPIRE | SHREE SANKET EMPIRE BEHIND DISTRICT COURT STATE BANK ROAD MALEGAON | 92 | - | Completed | Dec 2018 | Dec 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
Keep SHREE SANKET EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near -4,100+ in Nashik
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
SANKET HEIGHTS
SHREE SANKET DEVELOPERS
Bachhav Empire
Abhijit Ashok Soygaonkar
Swaroop Residency
SHREE CONSTRUCTION COMPANY
UNITY HEIGHTS
NIRMAAN ENGINEERS AND CONTRACTORS
Chintamani Elite
Anup Ramanlal Pahade
ARCHIT RESIDENCY
KIRAN PURUSHOTTAM BACHHAV
See every Nashik project, with the district possession charts
Builder: SHREE SANKET DEVELOPERS
SHREE SANKET DEVELOPERS has 7 registrations on MahaRERA, including SHREE SANKET GARDEN and SHREE SANKET EMPIRE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHREE SANKET EMPIRE is delayed beyond 31 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE SANKET EMPIRE?
The registered promoter entity is SHREE SANKET DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE SANKET EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE SANKET EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE SANKET EMPIRE?
The professionals named in the filing: Architect: KABRA AND SHAH ASSOCIATES; Engineer: PRASANNA MANOHAR BHORE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE SANKET EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback