Shree Ram Nagar Complex

By Sudham Lifespaces LLP

RG-MH-83182 · RERA P99000048744 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of SMFG India Home Finance Company Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
19 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 90%
117 of 294Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

Shree Ram Nagar Complex is a Others project by Sudham Lifespaces LLP in Palghar, Maharashtra, registered with MahaRERA as P99000048744 on 17 Jan 2023. Possession is promised by 31 Dec 2026. 177 of the 294 units on this registration are recorded sold or booked, and 19 of 33 construction stages are filed complete.

At a glance

Project

  • NameShree Ram Nagar Complex
  • TypeOthers
  • Location
    • Vartak Road
    • Virar
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000048744
  • ReraGenie IDRG-MH-83182

Builder

  • NameSudham Lifespaces LLP
  • Entity typePartnership
  • GSTIN27AEPFS5042D1ZX
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersPushkaraj Vikas Vartak, Vikas Narsinha Vartak, Sunil Jagannath Charghe, Mrugen Sunil Chorghe
  • Other registrations2 more →

Key dates

this monthRegisteredJan 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed113 files

Current status

60%177 of 294 units booked
73.2%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1ANA530126126
1BNA4110010
1C - Wing A and Wing BNA24221580158

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 90%.

1A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
1B88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
1C - Wing A and Wing B72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed204

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots204
Closed/Covered3
Open Space201
BuildingClosed/CoveredOpen SpaceTotal
1A101
1B101
1C - Wing A and Wing B1201202

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,038 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofSMFG India Home Finance Company Ltd
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on16 Aug 2025
LandownerVillageDistrict
Shreeram Nagar Co-operative Housing Society LtdVasai-Virar City (M Corp)Palghar
Kaunteya Co-operative Housing Society LtdVasai-Virar City (M Corp)Palghar
Radhey Co-operative Housing Society LtdVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI16726.0
Proposed, not sanctioned16,726 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVirar West
Estimated costRs 64.16 cr
Cost incurredRs 47.00 cr
Work done73.25%
BuildingWingEstimatedIncurred
1C - Wing A and Wing BNARs 28.47 crRs 20.60 cr
1ANARs 19.00 crRs 19.00 cr
1BNARs 11.39 crRs 7.41 cr
-NARs 5.30 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMegha Urbanscapes
EngineerDeepak Kumar Singh
Chartered AccountantSulay N Shah
Chartered AccountantParthkumar Dhirajlal Patel
Chartered AccountantPranav Patel & Associates
Chartered AccountantR O Pandey & Associates
PartnerRole in project
Sudham Lifespaces LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 SRN.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 SRN.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 Shree Ram Nagar Complex March 26.pdf28 Apr 2026
Withdrawal Update Form 1File: SRN Form 1 Dec 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf13 Mar 2026
Withdrawal Update Form 3File: SRN Form 3.pdf13 Mar 2026
Withdrawal Update Form 1File: SRN Form 1 Sep 25.pdf12 Mar 2026
Withdrawal Update Form 2File: FORM 2-Shree Ram Nagar Complex_Sept 25.pdf12 Mar 2026
Withdrawal Update Form 3File: SRN Form 3 Dec 25.pdf12 Mar 2026
Withdrawal Update Form 1File: SRN Jun 2025.pdf12 Feb 2026
Withdrawal Update Form 2File: Form 2 Jun 2025.pdf12 Feb 2026
Withdrawal Update Form 3File: Form 3 Shree Ram Nagar Complex JUNE25.pdf12 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Shree Ram Nagar Complex.pdf11 Oct 2025
Form 1File: SRN Jun 2025.pdf14 Aug 2025
Form 2File: Shree Ram Nagar Complex Form 2 Jun 25.pdf14 Aug 2025
Form 3File: Form 3 Shree Ram Nagar Complex JUNE25.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Shree Ram Nagar Complex 30-06-2025.pdf14 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Ram Nagar Complex Mar 25.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Ram Nagar Complex Form 2 March 25.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Shree Ram Nagar Complex 31-03-2025.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shree Ram Nagar MAR 2025.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Shree Ram Nagar Complex-March-25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SRN Dec 24.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ram Nagar Sept 24.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Ram Nagar Complex Dec 2024_c.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_compressed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Ram Nagar Complex Form 2 Sept 24.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Ram Nagar Complex Form 2 Dec 24.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Shree Ram Nagar Complex 31-12-2024.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SRN FORM 1.pdf10 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SUDAM_FORM5_2023_2024.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ram Nagar Complex Jun 24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SRN JUNE 2024 FORM 1.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Jun 2024.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 March 24.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ram Nagar complex March 2024.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shree Ram Nagar Complex.pdf25 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold March 2024.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (19-4-2024) SHRI RAM NAGAR.pdf17 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sudham Lifespaces LLP.pdf8 May 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Fullerton New.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance Fullerton New.pdf19 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sudham Lifespaces LLP form 5.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHRI RAM NAGAR Dec 23.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Dec 2023.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ram Nagar Complex Form 3 Dec 23.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Sept 2023.pdf18 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Ram Nagar Complex Sep 23.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree Ram Nagar Sept 2023.pdf6 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEP 2023.pdf27 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 23.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold June 23.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ram Nagar Jun 23.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JUNE 2023 Shree Ram Nagar Complex.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree Ram Nagar June 23.pdf11 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shree Ram Nagar Mar 2023.pdf31 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Back Account HDFC.pdf31 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsol march 23_compressed.pdf30 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 MAR 2023.pdf29 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 MAR 2023 Shree Ram Nagar Complex.pdf29 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-Shree Ram Nagar Complex_March 23.pdf29 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Fullerton.pdf14 Mar 2023
Details of encumbrances concerned to LegalFile: Encumbrance Fullerton.pdf14 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM32 NEW.pdf9 Jan 2023
Other - FinanceFile: CA certificate for RERA.pdf9 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sudham Lafespaces LLP-Pushkaraj Vikas Vartak--- (1).pdf5 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sudham Lafespaces LLP-Mrugen Sunil Chorghe.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sudham Lafespaces LLP-Sunil Chorghe.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sudham Lafespaces LLP-Vikas Vartak.pdf4 Jan 2023
Proforma of Agreement for saleFile: RERA (Sudham) 04 01 23.pdf4 Jan 2023
Copy of the legal title reportFile: Legal Title Report.pdf28 Dec 2022
CERSAI detailsFile: Cersai Report.pdf28 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Shree Ram.pdf7 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 NEW.pdf7 Dec 2022
Building plan approvalFile: Building Plan Sheet 9.pdf6 Dec 2022
Building plan approvalFile: Building Plan Sheet 2.pdf6 Dec 2022
Building plan approvalFile: Building Plan Sheet 3.pdf6 Dec 2022
Building plan approvalFile: Building Plan Sheet 4.pdf6 Dec 2022

How this compares with Palghar

60%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shree Ram Nagar Complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar3,200+ in Palghar

2 kmShree Ram Nagar ComplexCompleted 80Lapsed / revoked 50Other 91Dot size: filed unitsN

Filed coordinates, straight-line distance. 221 registered projects within 2 km.

Builder: Sudham Lifespaces LLP

Sudham Lifespaces LLP has 3 registrations on MahaRERA, including Shree Ram Nagar Complex and SHREE KRISHNA HEIGHTS I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Shree Ram Nagar Complex is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shree Ram Nagar Complex?

The registered promoter entity is Sudham Lifespaces LLP, a partnership as per the filing. Its GSTIN 27AEPFS5042D1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shree Ram Nagar Complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shree Ram Nagar Complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shree Ram Nagar Complex?

The professionals named in the filing: Architect: Megha Urbanscapes; Engineer: Deepak Kumar Singh; Chartered Accountant: Sulay N Shah; Chartered Accountant: Parthkumar Dhirajlal Patel; Chartered Accountant: Pranav Patel & Associates; Chartered Accountant: R O Pandey & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shree Ram Nagar Complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shree Ram Nagar Complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shree Ram Nagar Complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.