ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SHREE RADHE SHYAM HEIGHTS

Registered No litigation declared Others project

SHREE RADHE SHYAM HEIGHTS

By SHREE SAI BUILDERS

RG-MH-17836 · RERA P51800055735 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 50%
38 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

SHREE RADHE SHYAM HEIGHTS is a Others project by SHREE SAI BUILDERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055735 on 16 Apr 2024. Possession is promised by 31 Dec 2027. 9 of the 47 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE RADHE SHYAM HEIGHTS
  • TypeOthers
  • Location
    • SITUATED AT L.T. ROAD
    • OPP. PANJABI LANE
    • BORIVALI (WEST)
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • RERA no.P51800055735
  • ReraGenie IDRG-MH-17836

Builder

  • NameSHREE SAI BUILDERS
  • Entity typePartnership
  • PartnersSANDEEP KANAIYALAL MEHTA, BHAVNABEN SANDIPKUMAR MEHTA, MEETA BHAVESH MEHTA
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Current status

19%9 of 47 units booked
59.3%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE RADHE SHYAM HEIGHTSNA141341647

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 50%.

SHREE RADHE SHYAM HEIGHTS: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises8%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes35%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered41
Open Space6

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area882 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
SHYAM KUTIR CO OP HSG SOC LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2381.67
Proposed, not sanctioned2,279 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchROSEBEN ENCLAVE, STATION ROAD, BHAYANDER WEST THANE 401101
Estimated costRs 13.21 cr
Cost incurredRs 7.84 cr
Work done59.3%
BuildingWingEstimatedIncurred
SHREE RADHE SHYAM HEIGHTSNARs 13.21 crRs 7.84 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRIYANK BHATT
EngineerCLINT DOS SANTOS
EngineerJACOB BASTYAW DSOUZA
Chartered AccountantPOKHARNA AND ASSOCIATES
Chartered AccountantKOTHARI JAIN & ASSOCIATES
PartnerRole in project
SHREE SAI BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SSB Form 1 March 2026 -Signed.pdf25 Apr 2026
Withdrawal Update Form 2File: SSB RERA Form 2 March 2026.pdf25 Apr 2026
Withdrawal Update Form 3File: SSB RERA Form 3 - March 2026.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 2025 -SSB.pdf6 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE (7).pdf6 Apr 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 - SSB (1).pdf6 Apr 2026
Withdrawal Update Form 1File: form 1.pdf1 Nov 2025
Withdrawal Update Form 2File: form 2 (2).pdf1 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf1 Nov 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Radhe Shyam Heights form 2 March 2025.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April to June 2024.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July to Sept 2024.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate June 2024- SSB (1).pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf26 Oct 2024
Proforma of Agreement for saleFile: 1 Other - Legal.pdf12 Apr 2024
Layout approvalFile: 1.pdf22 Mar 2024
Layout approvalFile: 2.pdf22 Mar 2024
Layout approvalFile: 3.pdf22 Mar 2024
Layout approvalFile: 4.pdf22 Mar 2024
Layout approvalFile: 5.pdf22 Mar 2024
Layout approvalFile: 6.pdf22 Mar 2024
Copy of the legal title reportFile: SSB Title Report (1) (1).pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: 1.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: 2.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: 3.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: 4.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: 5.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: 6.pdf22 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSB CA Certificate (1).pdf22 Mar 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf21 Mar 2024
Deviation Report with respect to Allotment letterFile: No deviation Allotment - SSB.pdf21 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report agreement for sale- SSB (3).pdf21 Mar 2024
Declaration about Commencement CertificateFile: CC Declaration New -SSB.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg_ certificate - Shree Radhe Shyam Heights.pdf13 Mar 2024
Building plan approvalFile: IOD.pdf11 Mar 2024
PAN CardFile: Shree Sai Builders PAn.pdf11 Mar 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf11 Mar 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf11 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf11 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 2403983_FirstCC_signed (1) (1).pdf11 Mar 2024
Declaration in FORM BFile: Form B -SSB.pdf11 Mar 2024
CERSAI detailsFile: 1 CERSAI details (9) (1).pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI - Shree Radhe Shyam Heights.pdf11 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Details- Shree Sai Builders.pdf11 Mar 2024

How this compares with Mumbai Suburban

19%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE RADHE SHYAM HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI (WEST)6,700+ in Mumbai Suburban

Builder: SHREE SAI BUILDERS

SHREE SAI BUILDERS has 5 registrations on MahaRERA, including SAI SHRADHA and Shree Sai Avenue. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHREE RADHE SHYAM HEIGHTS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE RADHE SHYAM HEIGHTS?

The registered promoter entity is SHREE SAI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE RADHE SHYAM HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE RADHE SHYAM HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE RADHE SHYAM HEIGHTS?

The professionals named in the filing: Architect: PRIYANK BHATT; Engineer: CLINT DOS SANTOS; Engineer: JACOB BASTYAW DSOUZA; Chartered Accountant: POKHARNA AND ASSOCIATES; Chartered Accountant: KOTHARI JAIN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE RADHE SHYAM HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE RADHE SHYAM HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE RADHE SHYAM HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.