Home / Browse projects / Palghar, Maharashtra / SHREE NIWAS 8

Registered No litigation declared Residential / Group Housing project

SHREE NIWAS 8

By PRAVIN MADHUKAR RAUT

RG-MH-27844 · RERA P99000024416 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 60 months from the original
4 of 11Construction stages donefurthest along: Staircases, 50%
43 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

SHREE NIWAS 8 is a Residential / Group Housing project by PRAVIN MADHUKAR RAUT in Palghar, Maharashtra, registered with MahaRERA as P99000024416 on 12 Feb 2020. Possession is promised by 30 Dec 2028. The completion date has moved by 60 months from the original filing. 4 of the 47 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE NIWAS 8
  • TypeResidential / Group Housing
  • Location
    • 101
    • INDRAPRASTHA
    • BUILDING NO. 5
    • B WING
    • SAPHALE EAST
    • Umberpada
    • Palghar
    • 401102
  • Pincode401102
  • RERA no.P99000024416
  • ReraGenie IDRG-MH-27844

Builder

  • NamePRAVIN MADHUKAR RAUT
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2020First promiseDec 2023Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2020
  • Promised completion30 Dec 2028
  • Revised completionRevised to 30 Dec 2028 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed140 files

Current status

9%4 of 47 units booked
47.3%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE NIWAS 8NA8847047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 50%.

SHREE NIWAS 8: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed419

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots419
Closed/Covered25
Open Space394

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,900 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPalghar District council
Permissible FSI2091.97
Proposed, not sanctioned2,092 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Shop No 3,4,5,6, Swastik Park, Saphale East
Estimated costRs 5.48 cr
Cost incurredRs 2.59 cr
Work done47.26%
BuildingWingEstimatedIncurred
SHREE NIWAS 8NARs 5.34 crRs 2.56 cr
-NARs 13.75 lakhRs 2.65 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastu Shilp
ArchitectVastushilp Associates
EngineerParesh Unnarkar
Chartered AccountantTalakchand N Gala
Chartered AccountantBharat Dhonde & Co
PartnerRole in project
PRAVIN MADHUKAR RAUT-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018587Dec 2023 → Dec 2028

Reason as filed by the promoterPlease refer to the submission attached

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Mar 2026.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 Mar 2026.pdf25 Apr 2026
Withdrawal Update Form 3File: Form 3 March-2026.pdf25 Apr 2026
Withdrawal Update Form 1File: Form 1 December 2025.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 December 2025.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec-25.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf17 Dec 2025
Withdrawal Update Form 1File: Form 1 as on 30-09-2025.pdf17 Nov 2025
Withdrawal Update Form 2File: Form 2 as on 30-09-2025.pdf17 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf17 Nov 2025
Form 1File: Form 1 as on 31-03-2024.pdf21 Aug 2025
Form 2File: ENGINEERS CERTIFICATE 31 03 2024.pdf21 Aug 2025
Form 3File: Form 3 as on 31-03-2024.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 31-03-2024.pdf21 Aug 2025
Form 1File: Form 1 as on Dec 2023.pdf21 Aug 2025
Form 2File: Form 2 as on Dec 2023.pdf21 Aug 2025
Form 3File: Form-3 (Signed) Dec 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Dec 2023.pdf21 Aug 2025
Form 1File: Form 1 Sept-23.pdf21 Aug 2025
Form 2File: Form 2Sep 2023.pdf21 Aug 2025
Form 3File: Form 3 sep 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf21 Aug 2025
Form 1File: Form 1 June 2023.pdf21 Aug 2025
Form 2File: Form 2 June 2023.pdf21 Aug 2025
Form 3File: Form 3 June 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf21 Aug 2025
Form 1File: Form 1 March 2023.pdf21 Aug 2025
Form 2File: Form 2 March 2023.pdf21 Aug 2025
Form 3File: Form 3 March 2023.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf21 Aug 2025
Form 1File: Form 1 as on 31-03-2025.pdf20 Aug 2025
Form 2File: Form 2 as on 31-03-2025.pdf20 Aug 2025
Form 3File: Form 3.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf20 Aug 2025
Form 1File: Form 1 as on 31-12-2024.pdf20 Aug 2025
Form 2File: Form 2 as on 31-12-2024.pdf20 Aug 2025
Form 3File: Form 3 as on 31-12-2024.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 31-12-2024.pdf20 Aug 2025
Form 1File: FORM 1 as on 30-09-2024.pdf20 Aug 2025
Form 2File: FORM 2 as on 30-09-2024.pdf20 Aug 2025
Form 3File: Form 3 Sep 2024.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Discloure of sold unsold.pdf20 Aug 2025
Form 1File: Form 1 as on 30-06-2024-Signed.pdf20 Aug 2025
Form 2File: Form 2 as on 30-06-2024 - Signed.pdf20 Aug 2025
Form 3File: Form 3 dated 30-06-2024-Signed.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory 30-06-2024.pdf20 Aug 2025
Withdrawal Update Form 1File: Form 1 as on 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 1File: Form 1 as on 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 2File: Form 2 as on 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 2File: Form 2 as on 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 3File: Form 3 as on 30-06-2025.pdf20 Aug 2025
Withdrawal Update Form 3File: Form 3 as on 30-06-2025.pdf20 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-2025.pdf11 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 31-03-2025.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 31-03-2025.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 31-12-2024.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31-12-2024.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 31-12-2024.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory 31-12-2024.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 as on 30-09-2024.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shree Niwas.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 as on 30-09-2024.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Discloure of sold unsold.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shree Niwas.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30-06-2024-Signed.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30-06-2024 - Signed.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-2024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory 30-06-2024.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dated 30-06-2024-Signed.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 31-03-2024.pdf15 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31-03-2024.pdf15 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory 31-03-2024.pdf15 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31-03-2024.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (Signed).pdf13 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-F.pdf5 Jan 2024

How this compares with Palghar

9%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 60 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE NIWAS 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAPHALE EAST3,200+ in Palghar

Builder: PRAVIN MADHUKAR RAUT

PRAVIN MADHUKAR RAUT has 1 registration on MahaRERA, including SHREE NIWAS 8. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREE NIWAS 8 is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE NIWAS 8?

The registered promoter entity is PRAVIN MADHUKAR RAUT, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE NIWAS 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE NIWAS 8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE NIWAS 8?

The professionals named in the filing: Architect: Vastu Shilp; Architect: Vastushilp Associates; Engineer: Paresh Unnarkar; Chartered Accountant: Talakchand N Gala; Chartered Accountant: Bharat Dhonde & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE NIWAS 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE NIWAS 8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE NIWAS 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.