SHREE NANDAN PARK B WING
RG-MH-03204 · RERA P51700020958 · Last updated on MahaRERA portal: 25 Feb 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE NANDAN PARK B WING is a Residential / Group Housing project by LAXMI CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700020958 on 27 May 2019. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 24 months from the original filing.
At a glance
Project
- NameSHREE NANDAN PARK B WING
- TypeResidential / Group Housing
- Location
- SURVEY NO 119 HISSA NO 3 and 120 HISSA NO 7 & 4
- TITWALA EAST
- Titwala
- Kalyan
- Thane
- 421605
- Pincode421605
- RERA no.P51700020958
- ReraGenie IDRG-MH-03204
Builder
- NameLAXMI CONSTRUCTION
- Entity typePartnership
- PartnersAVINASH DATTATRAY PATKAR, PARAG KANTILAL PATEL, HIRABEN KANTILAL PATEL, HARSHA ISHWAR PATEL, BHAVESH ARVINDBHAI PATEL, RITESH ARVINDBHAI PATEL, GOVIND KHETABHAI PATEL, JIGNESH SHANTILAL POKAR
- Other registrations3 more →
- Completed2 of 4
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 May 2019
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed69 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE NANDAN PARK | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
SHREE NANDAN PARK: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 25 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| LAXMI CONSTRUCTION | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 82.35% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Apr 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Apr 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf | 25 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2024.pdf | 25 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Shree Nandan Park as on March 2024.pdf | 25 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 June 2024.pdf | 25 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Sept 2024.pdf | 25 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf | 25 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2024.pdf | 25 Feb 2025 |
| CERSAI detailsFile: Declaration of CERSAI Shree Nandan.pdf | 29 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 29 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 29 Jan 2024 |
| Declaration in FORM BFile: Form B Shree Nandan.pdf | 22 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept_11zon.pdf | 19 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec_11zon.pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20_11zon.pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21_11zon.pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22_11zon.pdf | 19 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Shree Nandan Park 11-01-2024.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 19 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf | 19 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (31-12-2023) - Shree nandan park b wing.pdf | 12 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (31-12-2023) - Shree nandan park b wing.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Shree Nandan Park as on 31-12-2023.pdf | 12 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shree Nandan Park - Form 1.pdf | 20 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Nandan Park - Form 2.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 - Shree Nandan Park as on 30-09-2023.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Shree Nandan Park B Wing as on 2022-23.pdf | 29 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-23.pdf | 3 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-23.pdf | 3 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3- Shree Nandan Park as on 31-03-2023.pdf | 10 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate 576.pdf | 25 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-03-2022.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-22.pdf | 17 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-20.pdf | 16 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-21.pdf | 16 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-22.pdf | 16 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-22.pdf | 16 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-20.pdf | 16 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-21.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-20.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-21.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-22.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 31-12-22.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LAXMI CONSTRUCTION 21 22.pdf | 9 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 5 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 5 Jan 2023 |
| Declaration about Commencement CertificateFile: Shree Nandan Park B Wing Format D.pdf | 2 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHREE Nandanvan Ext and Corre_compressed.pdf | 2 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Shree Nandan Park B Wing Circular 29.pdf | 2 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Laxmi- Form 5.pdf | 2 Jul 2021 |
| Layout approvalFile: LAY OUT PLAN.pdf | 24 Apr 2019 |
| Building plan approvalFile: Binder1_Page_2.pdf | 24 Apr 2019 |
| Copy of the legal title reportFile: TITLE REPORT120.pdf | 24 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: LAY OUT PLAN.pdf | 24 Apr 2019 |
| Building Plan Approval (IOD)File: Binder1_Page_2.pdf | 24 Apr 2019 |
| Declaration in FORM BFile: FORM B.pdf | 24 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 24 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 24 Apr 2019 |
| Certificates of CA (Form 3)File: Laxmi Construction - Form-3.pdf | 24 Apr 2019 |
| Proforma of Allotment letterFile: Draft Sale Agreement .pdf | 24 Apr 2019 |
| OtherFile: AFFIDAVIT CUM DECLARATION.pdf | 24 Apr 2019 |
| PAN CardFile: PAN CARD.pdf | 20 Apr 2019 |
| Details of encumbrancesFile: ENCUMBRANCES CERTIFICATE.pdf | 20 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: B WING CC.pdf | 20 Apr 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHREE NANDAN PARK A WING | SURVEY NO 119 120 TITWALA EAST TA KALYAN DIST -THANE | 1 | Completed | Dec 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
Keep SHREE NANDAN PARK B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TITWALA EAST7,600+ in Thane
KALAS DARSHAN
JAY GANESH DEVELOPERS
Charms Padamavati Royal Phase 2
Charms Developers
SILVER LINE PHASE - 1
HOME CONSULTANCY
Padamavati Royal Phase 2
Sujeet Kumar Singh
Charms Padamavati Royal Phase 1
Charms Developers
RUSTTAGI AARAMBHA PHASE-III
RUSTAGI ESTATES PRIVATE LIMITED
See every Thane project, with the district possession charts
Builder: LAXMI CONSTRUCTION
Laxmi Construction has 4 registrations on MahaRERA, including Swamiratan Heights and VASTU SHILP. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHREE NANDAN PARK B WING is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE NANDAN PARK B WING?
The registered promoter entity is LAXMI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE NANDAN PARK B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE NANDAN PARK B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in SHREE NANDAN PARK B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback