Home / Browse projects / Thane, Maharashtra / SHREE NANDAN PARK B WING

Completed No litigation declared Residential / Group Housing project

SHREE NANDAN PARK B WING

By LAXMI CONSTRUCTION

RG-MH-03204 · RERA P51700020958 · Last updated on MahaRERA portal: 25 Feb 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SHREE NANDAN PARK B WING is a Residential / Group Housing project by LAXMI CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700020958 on 27 May 2019. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameSHREE NANDAN PARK B WING
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 119 HISSA NO 3 and 120 HISSA NO 7 & 4
    • TITWALA EAST
    • Titwala
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700020958
  • ReraGenie IDRG-MH-03204

Builder

  • NameLAXMI CONSTRUCTION
  • Entity typePartnership
  • PartnersAVINASH DATTATRAY PATKAR, PARAG KANTILAL PATEL, HIRABEN KANTILAL PATEL, HARSHA ISHWAR PATEL, BHAVESH ARVINDBHAI PATEL, RITESH ARVINDBHAI PATEL, GOVIND KHETABHAI PATEL, JIGNESH SHANTILAL POKAR
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2019First promiseDec 2022Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 May 2019
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE NANDAN PARKNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

SHREE NANDAN PARK: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 25 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,140 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1255.36
Proposed, not sanctioned1,255 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 13, CITY GEM BUILDING PLOT NO E147 SECTOR-12, KHARGHAR NAVI MUMBAI 410210

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
LAXMI CONSTRUCTION-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018885Dec 2022 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 82.35% allottees for purpose of extension of RERA registration period of the said project.

EXT51700013487Dec 2022 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf25 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 - Shree Nandan Park as on March 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 June 2024.pdf25 Feb 2025
Certificates of CA (Form 3)File: Form 3 Sept 2024.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf25 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept 2024.pdf25 Feb 2025
CERSAI detailsFile: Declaration of CERSAI Shree Nandan.pdf29 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf29 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf29 Jan 2024
Declaration in FORM BFile: Form B Shree Nandan.pdf22 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sept_11zon.pdf19 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec_11zon.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20_11zon.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21_11zon.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22_11zon.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf19 Jan 2024
Certificates of CA (Form 3)File: Form 3 Shree Nandan Park 11-01-2024.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (31-12-2023) - Shree nandan park b wing.pdf12 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (31-12-2023) - Shree nandan park b wing.pdf12 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Shree Nandan Park as on 31-12-2023.pdf12 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shree Nandan Park - Form 1.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shree Nandan Park - Form 2.pdf20 Oct 2023
Certificates of CA (Form 3)File: Form 3 - Shree Nandan Park as on 30-09-2023.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Shree Nandan Park B Wing as on 2022-23.pdf29 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-23.pdf3 Jun 2023
Certificates of CA (Form 3)File: Form 3 31-03-23.pdf3 Jun 2023
Certificates of CA (Form 3)File: Form 3- Shree Nandan Park as on 31-03-2023.pdf10 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate 576.pdf25 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31-03-2022.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-12-22.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-20.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-21.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-22.pdf16 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-22.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-20.pdf16 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-21.pdf16 Feb 2023
Certificates of CA (Form 3)File: Form 3 31-03-20.pdf16 Feb 2023
Certificates of CA (Form 3)File: Form 3 31-03-21.pdf16 Feb 2023
Certificates of CA (Form 3)File: Form 3 31-03-22.pdf16 Feb 2023
Certificates of CA (Form 3)File: Form 3 31-12-22.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: LAXMI CONSTRUCTION 21 22.pdf9 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf5 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf5 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf5 Jan 2023
Declaration about Commencement CertificateFile: Shree Nandan Park B Wing Format D.pdf2 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHREE Nandanvan Ext and Corre_compressed.pdf2 Jan 2023
Disclosure of sold/ booked inventoryFile: Shree Nandan Park B Wing Circular 29.pdf2 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Laxmi- Form 5.pdf2 Jul 2021
Layout approvalFile: LAY OUT PLAN.pdf24 Apr 2019
Building plan approvalFile: Binder1_Page_2.pdf24 Apr 2019
Copy of the legal title reportFile: TITLE REPORT120.pdf24 Apr 2019
Copy of Layout Approval (in case of layout)File: LAY OUT PLAN.pdf24 Apr 2019
Building Plan Approval (IOD)File: Binder1_Page_2.pdf24 Apr 2019
Declaration in FORM BFile: FORM B.pdf24 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf24 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf24 Apr 2019
Certificates of CA (Form 3)File: Laxmi Construction - Form-3.pdf24 Apr 2019
Proforma of Allotment letterFile: Draft Sale Agreement .pdf24 Apr 2019
OtherFile: AFFIDAVIT CUM DECLARATION.pdf24 Apr 2019
PAN CardFile: PAN CARD.pdf20 Apr 2019
Details of encumbrancesFile: ENCUMBRANCES CERTIFICATE.pdf20 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: B WING CC.pdf20 Apr 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE NANDAN PARK A WINGSURVEY NO 119 120 TITWALA EAST TA KALYAN DIST -THANE1CompletedDec 2016Oct 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE NANDAN PARK B WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TITWALA EAST7,600+ in Thane

Builder: LAXMI CONSTRUCTION

Laxmi Construction has 4 registrations on MahaRERA, including Swamiratan Heights and VASTU SHILP. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE NANDAN PARK B WING is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE NANDAN PARK B WING?

The registered promoter entity is LAXMI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE NANDAN PARK B WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE NANDAN PARK B WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in SHREE NANDAN PARK B WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE NANDAN PARK B WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE NANDAN PARK B WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.