Home / Browse projects / Nagpur, Maharashtra / SHREE NAGARI-1
SHREE NAGARI-1
RG-MH-07620 · RERA P50500034685 · Last updated on MahaRERA portal: 10 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE NAGARI-1 is a Residential / Group Housing project by SHREE INFRASTRUCTURES AOP in Nagpur, Maharashtra, registered with MahaRERA as P50500034685 on 20 Apr 2022. Possession is promised by 31 Dec 2027. 127 of the 176 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete.
At a glance
Project
- NameSHREE NAGARI-1
- TypeResidential / Group Housing
- Location
- PIPLA
- Nagpur (Rural)
- Nagpur
- 440034
- Pincode440034
- RERA no.P50500034685
- ReraGenie IDRG-MH-07620
Builder
- NameSHREE INFRASTRUCTURES AOP
- Entity typeOthers
- Named personsMANOJ BABURAO SURAMWAR, pramod wasudevrao rakshamwar, sadhana Rakshamwar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Apr 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed71 files
Current status
Figures as on 10 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE 2- WING A | NA | 11 | 0 | 88 | 0 | 88 |
| TYPE1- WING B | NA | 11 | 11 | 0 | 0 | 0 |
| TYPE 1 - WING A | NA | 11 | 11 | 88 | 0 | 88 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.
TYPE 2- WING A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
TYPE1- WING B58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 55% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
TYPE 1 - WING A89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 25% |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 30% |
| Storm Water Drains | Yes | 30% |
| Landscaping & Tree Planting | Yes | 5% |
| Street Lighting | Yes | 5% |
| Community Buildings | Yes | 55% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 35% |
| Solid Waste Management And Disposal | Yes | 30% |
| Water conservation /Rain water harvesting | Yes | 15% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed554
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TYPE 2- WING A | 277 | 277 |
| TYPE 1 - WING A | 277 | 277 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 20.00 cr | Rs 15.00 cr |
| TYPE 2- WING A | NA | Rs 10.00 cr | Rs 9.50 cr |
| TYPE 1 - WING A | NA | Rs 10.00 cr | Rs 9.90 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PAWAN RAVIPRASAD GUPTA |
| Engineer | TANVI RAKSHAMWAR |
| Chartered Accountant | S P DARA AND ASSOCIATES |
| Chartered Accountant | Saroj Vidhani |
| Chartered Accountant | SP DARA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHREE INFRASTRUCTURES AOP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: FORM 5 Signed.pdf | 10 Jul 2026 |
| Withdrawal Update Form 1File: Sign Architect cer mar 26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: March 26 engineer certificate_compressed.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: Shree Infrastructure AOP form 3 quarter 4_compressed.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: Architect cer 30th JuLY 25 TO SEP 25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Sigh Architect cer Dec 25_compressed (1).pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: ENGINEER CER SEP25_compressed (1).pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: Dec Form 3 (1).pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 SEP 25_compressed (1).pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Dec Form 3 (1).pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Architect cer 1st APR 25 to 30th June 25.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: june 25 Engineer certificate compressed.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 14 Feb 2026 |
| Form 3File: DocScanner 22-May-2025 12-43 pm.pdf | 27 May 2025 |
| Form 1File: march 25 Architect certificate_compressed.pdf | 27 May 2025 |
| Form 2File: march 25 Engineer certificate_compressed.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Shree infra Disclosure.pdf | 27 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Architect cer dec 24.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed Engineer cer dec 24.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Signed.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Infra AOP Form 3_compressed.pdf | 11 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 2 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: engineer's certificate (2).pdf | 6 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Gupta cer dec 23.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cer dec 23.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree infra (AOP)_compressed.pdf | 20 Jan 2024 |
| Declaration in FORM BFile: NEW ENCUMBRANCE CERTIFICATE_compressed.pdf | 21 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Shree Infrastructure(AOP) 22-23.pdf | 4 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Agreement of shree infra AOP as on 30th sep 23.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate .pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate_compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate_compressed.pdf | 5 Aug 2023 |
| Layout approvalFile: SANCTION PERMIT 01.pdf | 5 Apr 2022 |
| Layout approvalFile: SANCTION PERMIT 02.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 01.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 02.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 03.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 04.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 05.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 06.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 07.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 08.pdf | 5 Apr 2022 |
| Building plan approvalFile: Sanction MAP 09.pdf | 5 Apr 2022 |
| PAN CardFile: AOP PAN CARD.pdf | 5 Apr 2022 |
| Copy of the legal title reportFile: Format-A Rera Title Report_compressed.pdf | 5 Apr 2022 |
| Copy of the legal title reportFile: Title Verefication Report (1).pdf | 5 Apr 2022 |
| Details of encumbrancesFile: Encumbrances Certificate.pdf | 5 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: SANCTION PERMIT 01.pdf | 5 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: SANCTION PERMIT 02.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 01.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 02.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 03.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 04.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 05.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 06.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 07.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 08.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction MAP 09.pdf | 5 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: SANCTION PERMIT 01.pdf | 5 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: SANCTION PERMIT 02.pdf | 5 Apr 2022 |
| Declaration about Commencement CertificateFile: Format D.pdf | 5 Apr 2022 |
| Declaration in FORM BFile: form B.pdf | 5 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf | 5 Apr 2022 |
| CERSAI detailsFile: Cersai Search (1).pdf | 5 Apr 2022 |
| CERSAI detailsFile: Cersai Decleration.pdf | 5 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Form 3 new Format REDUCED.pdf | 5 Apr 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 5 Apr 2022 |
| Proforma of Allotment letterFile: Draft Agreement format.pdf | 5 Apr 2022 |
| OtherFile: AOP DEED_1.pdf | 5 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE NAGARI-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIPLA2,800+ in Nagpur
BHEDE NAGARI -CHARITON
DILIP GANPATRAO BHEDE
Godrej Orchard Estate
Godrej Properties Limited
MELBOURNE CITY
M/S 4 PILLARS REALTY
GARDEN HOMES ATHARVA NAGARI VII
ATHARVA INFRASTRUCTURES
ROYAL EMPIRE
M B INFRA
Ved Vidhi Ventures
Ved Vidhi Ventures
See every Nagpur project, with the district possession charts
Builder: SHREE INFRASTRUCTURES AOP
SHREE INFRASTRUCTURES AOP has 1 registration on MahaRERA, including SHREE NAGARI-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if SHREE NAGARI-1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE NAGARI-1?
The registered promoter entity is SHREE INFRASTRUCTURES AOP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE NAGARI-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE NAGARI-1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE NAGARI-1?
The professionals named in the filing: Architect: PAWAN RAVIPRASAD GUPTA; Engineer: TANVI RAKSHAMWAR; Chartered Accountant: S P DARA AND ASSOCIATES; Chartered Accountant: Saroj Vidhani; Chartered Accountant: SP DARA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE NAGARI-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback