Home / Browse projects / Nashik, Maharashtra / Shree Mateshwari Aangan
Shree Mateshwari Aangan
By Shree Mateshwari Developers
RG-MH-86425 · RERA P51600052378 · Last updated on MahaRERA portal: 19 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shree Mateshwari Aangan is a Others project by Shree Mateshwari Developers in Nashik, Maharashtra, registered with MahaRERA as P51600052378 on 21 Aug 2023. Possession is promised by 31 Mar 2028. 17 of the 79 units on this registration are recorded sold or booked, and 16 of 33 construction stages are filed complete.
At a glance
Project
- NameShree Mateshwari Aangan
- TypeOthers
- Location
- Chehadi Pumping Road
- Near Nashik Pune Highway Road
- Nashik
- CHEHEDI BK
- 422101
- Pincode422101
- RERA no.P51600052378
- ReraGenie IDRG-MH-86425
Builder
- NameShree Mateshwari Developers
- Entity typePartnership
- PartnersHarish Ambu Sanap, Ramdev Hariharprasad Pandey, Sandeep Santu Chakane
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Aug 2023
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings3 building records
- Documents filed83 files
Current status
Figures as on 19 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Shree Mateshwari Aangan Wing A | NA | 14 | 14 | 52 | 15 | 67 |
| Shree Mateshwari Aangan Wing B | NA | 3 | 3 | 8 | 0 | 8 |
| Shree Mateshwari Aangan Wing C | NA | 2 | 2 | 4 | 0 | 4 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.
Shree Mateshwari Aangan Wing A81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Shree Mateshwari Aangan Wing B43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 38% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 15% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Shree Mateshwari Aangan Wing C43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 38% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 15% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 20% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 20% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed101
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Shree Mateshwari Aangan Wing A | 35 | 35 |
| Shree Mateshwari Aangan Wing B | 26 | 26 |
| Shree Mateshwari Aangan Wing C | 40 | 40 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Shree Mateshwari Aangan Wing A | NA | Rs 5.91 cr | Rs 3.36 cr |
| Shree Mateshwari Aangan Wing B | NA | Rs 1.28 cr | Rs 1.28 cr |
| Shree Mateshwari Aangan Wing C | NA | Rs 82.39 lakh | Rs 82.39 lakh |
| - | NA | Rs 50.00 lakh | Rs 26.82 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ER Raju Ghodeshwar |
| Engineer | ER ASHISH DNYANESHWAR KALE |
| Engineer | Er Rhushikesh D Musale |
| Chartered Accountant | CA Nitin Mahajan |
| Chartered Accountant | CA ABHIJEET V PANGARKAR |
| Partner | Role in project |
|---|---|
| Shree Mateshwari Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 31 March 2026-1.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form-2-31 March 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: From-03-31 March 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: Form-1 -31-12-2025.pdf | 29 Mar 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 29 Mar 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 29 Mar 2026 |
| Withdrawal Update Form 1File: Form-1.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form-2.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: From-3 Sep-25 -SIGN.pdf | 19 Mar 2026 |
| Form 2A (FY 2024-2025)File: Angan Form-2A.pdf | 7 Jan 2026 |
| Form 5 (FY 2024-2025)File: shree mateshwari angan - Form-5.pdf | 19 Sep 2025 |
| Withdrawal Update Form 1File: Form-1 30 06 2025.pdf | 21 Aug 2025 |
| Withdrawal Update Form 2File: Form-2 30 06 2025.pdf | 21 Aug 2025 |
| Withdrawal Update Form 3File: Form-3 30 06 2025.pdf | 21 Aug 2025 |
| Form 1File: FORM-1.pdf | 9 Jun 2025 |
| Form 2File: Form 2.pdf | 9 Jun 2025 |
| Form 3File: FORM-3 -ANGAN-31 03 2025.pdf | 9 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 9 Jun 2025 |
| OthersFile: FORM -2A 24-25.pdf | 9 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHREE MATESHWARI ANGAN.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2-SHREE MATESHWARI ANGAN.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mateshwari Angan -30-06-2024_compressed.pdf | 22 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mateshwari Angan-30-9-2024_compressed.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold JUNE 2024.pdf | 22 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold -Sep 2024.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 2024.pdf | 2 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SEPT 2024.pdf | 2 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 2024.pdf | 2 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUNE 2024.pdf | 2 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form -5 mateshwari.pdf | 11 Oct 2024 |
| Form 5 (FY 2023-2024)File: form -5 mateshwari.pdf | 5 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-31 03 2024.pdf | 22 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-31 03 2024.pdf | 22 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A-23-24.pdf | 22 May 2024 |
| Disclosure of sold/ booked inventoryFile: sold.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-31 03 2024.pdf | 22 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: sold.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1- MATESHWARI.pdf | 9 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2- MATESHWARI.pdf | 9 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: sold.pdf | 9 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3- MATESHWARI.pdf | 9 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 SANDEEP.pdf | 22 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 SANDEEP-FINAL.pdf | 22 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 SANDEEP.pdf | 22 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORIES.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 SANDEEP.pdf | 22 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 SANDEEP.pdf | 22 Nov 2023 |
| Declaration about Commencement CertificateFile: FORMAT -D.pdf | 26 Jul 2023 |
| Copy of the legal title reportFile: Legal Title Search -.pdf | 25 Jul 2023 |
| Other - LegalFile: SALE DEED_.pdf | 25 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 MATESHWARI.pdf | 21 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK.pdf | 17 Jul 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 29 Jun 2023 |
| Building plan approvalFile: Approved Project Plan-1.pdf | 28 Jun 2023 |
| Building plan approvalFile: Approve Project Plan-2.pdf | 28 Jun 2023 |
| Building plan approvalFile: Approve Project Plan-3.pdf | 28 Jun 2023 |
| Building plan approvalFile: Approved Project Plan-4.pdf | 28 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Project Plan-1.pdf | 28 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Approve Project Plan-2.pdf | 28 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Approve Project Plan-3.pdf | 28 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Project Plan-4.pdf | 28 Jun 2023 |
| Proforma of Agreement for saleFile: AFS_11zon.pdf | 28 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 27 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERT.pdf | 27 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF IN OTHER ESATE ORGANIZATION-RAMDEO.pdf | 27 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF IN OTHER ESATE ORGANIZATION-HARISH.pdf | 27 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Finance Encum.pdf | 16 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encum.pdf | 16 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Finance Encum.pdf | 16 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encum.pdf | 16 Jun 2023 |
| CERSAI detailsFile: Declaration cresai.pdf | 16 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dis interest sandeep.pdf | 16 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: no deviation allotment letter.pdf | 16 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: no devitation agreement.pdf | 16 Jun 2023 |
| Layout approvalFile: LAYOUT.pdf | 11 Jun 2023 |
| PAN CardFile: PAN FIRM.pdf | 11 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 11 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Shree Mateshwari Aangan on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: Shree Mateshwari Developers
Shree Mateshwari Developers has 1 registration on MahaRERA, including Shree Mateshwari Aangan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Shree Mateshwari Aangan is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shree Mateshwari Aangan?
The registered promoter entity is Shree Mateshwari Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shree Mateshwari Aangan?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shree Mateshwari Aangan?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shree Mateshwari Aangan?
The professionals named in the filing: Architect: ER Raju Ghodeshwar; Engineer: ER ASHISH DNYANESHWAR KALE; Engineer: Er Rhushikesh D Musale; Chartered Accountant: CA Nitin Mahajan; Chartered Accountant: CA ABHIJEET V PANGARKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shree Mateshwari Aangan?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback