Home / Browse projects / Raigarh, Maharashtra / SHREE MAHALAXMI SANKUL

Registered No litigation declared Others project

SHREE MAHALAXMI SANKUL

By SHREE MAHALAXMI DEVELOPERS

RG-MH-05894 · RERA P52000052173 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 16 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2032Possession promisedno revision filed
5 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 75%
319 of 382Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

SHREE MAHALAXMI SANKUL is a Others project by SHREE MAHALAXMI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000052173 on 27 Jul 2023. Possession is promised by 31 Mar 2032. 63 of the 382 units on this registration are recorded sold or booked, and 5 of 44 construction stages are filed complete.

At a glance

Project

  • NameSHREE MAHALAXMI SANKUL
  • TypeOthers
  • Location
    • SURVEY NO 56 HISSA NO 1
    • 2
    • 4/C
    • CTS NO 1661/4
    • AT VILLAGE CHINCHAVLI
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052173
  • ReraGenie IDRG-MH-05894

Builder

  • NameSHREE MAHALAXMI DEVELOPERS
  • Entity typePartnership
  • PartnersBABU GEORGE, SACHIN PRAKASH WADATE, JAGDISH SANTUMAL MOHNANI
  • Other registrations16 more →
  • Completed2 of 17
  • No longer live12 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2023PromisedMar 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2023
  • Promised completion31 Mar 2032
  • Revised completionNone
  • Buildings4 building records
  • Documents filed75 files

Current status

16%63 of 382 units booked
21.0%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA12111300130
Building 2NA121176076
Building 3NA121187087
Building 4NA1110791089

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.

Building 166%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed331

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots331
Closed/Covered16
Open Space315
BuildingClosed/CoveredOpen SpaceTotal
Building 14104108
Building 246165
Building 346973
Building 448185

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,032 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKhopoli Nagarparishad
Permissible FSI19998.3
Proposed, not sanctioned19,998 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-11, CBD BELAPUR, NAVI MUMBAI 400614
Estimated costRs 52.00 cr
Cost incurredRs 10.90 cr
Work done20.96%
BuildingWingEstimatedIncurred
Building 1NARs 48.10 crRs 10.49 cr
-NARs 3.90 crRs 41.30 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectINSPIRE ARCHITECT
EngineerDESTECHSTRUCTURAL CONSULTANTS
Chartered AccountantJAIN JAGTAP AND ASSOCIATES
PartnerRole in project
SHREE MAHALAXMI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2032

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf4 May 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf4 May 2026
Withdrawal Update Form 3File: CA Certificate_compressed.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf25 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 signed_compressed.pdf25 Feb 2026
Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf24 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf24 Feb 2026
Withdrawal Update Form 3File: CA Certificate Dec 25_compressed.pdf24 Feb 2026
Withdrawal Update Form 1File: Architect Certificate up to June 2025 (Site) Sign.pdf30 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Q2.pdf30 Dec 2025
Withdrawal Update Form 3File: CA Certificate upto Sept.pdf30 Dec 2025
Withdrawal Update Form 1File: Architect Certificate up to June 2025 (Site) Sign.pdf16 Dec 2025
Withdrawal Update Form 2File: Engineersu0027s Certificate Form 2A 30-06-25 (1).pdf16 Dec 2025
Withdrawal Update Form 3File: CA Certificate upto June Sign.pdf16 Dec 2025
Form 1File: Form 1.pdf1 Jul 2025
Form 2File: Form 2.pdf1 Jul 2025
Form 3File: Form 3.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold as on 31-03-2025.pdf1 Jul 2025
OthersFile: Form 2A.pdf1 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold 31-12-2024.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold 30-06-2024.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold-Unsold 30-09-2024.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold inventory.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold inventory.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Self Declaration.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance Self Declaration.pdf18 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Jagdish Mohani.pdf18 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Sachin Wadate.pdf18 Jul 2023
Other - LegalFile: Property Card 1661-4.pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Declaration.pdf3 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance Declaration.pdf3 Jul 2023
Proforma of Agreement for saleFile: Draft RERA Agreement - Khopoli.pdf3 Jul 2023
Proforma of Allotment letterFile: Allotment Letter Corrected FINAL.pdf3 Jul 2023
CERSAI detailsFile: Cersai certificate.pdf14 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf9 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Babu George.pdf9 Jun 2023
Deviation Report with respect to Allotment letterFile: No Deviation from Allotment.pdf9 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT FINAL.pdf9 Jun 2023
Other - TechnicalFile: Adobe Scan Jun 09, 2023 1-32-1.pdf9 Jun 2023
Other - TechnicalFile: Clarification for UBA.pdf9 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Declaration.pdf7 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Declaration.pdf7 Jun 2023
Declaration about Commencement CertificateFile: Declaration for CC.pdf7 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for RERA Ac 70 PERCENT.pdf7 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Jun 2023
Layout approvalFile: CC Plan-1.pdf24 May 2023
Building plan approvalFile: CC Plan-2.pdf24 May 2023
Building plan approvalFile: CC Plan-3.pdf24 May 2023
PAN CardFile: Shree Mahalaxmi Developers PAN Card.pdf24 May 2023
Copy of the legal title reportFile: Legal title report.pdf24 May 2023
Copy of Layout Approval (in case of layout)File: CC Plan-1.pdf24 May 2023
Building Plan Approval / NA Order for plotted developmentFile: CC Plan-2.pdf24 May 2023
Building Plan Approval / NA Order for plotted developmentFile: CC Plan-3.pdf24 May 2023
Declaration in FORM BFile: Form B Babu George.pdf24 May 2023
Declaration in FORM BFile: Form B Jagdish Mohanani.pdf24 May 2023
Declaration in FORM BFile: Form B Sachin Wadate.pdf24 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers's Certificate Form 2.pdf24 May 2023

How this compares with Raigarh

16%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE MAHALAXMI SANKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AT VILLAGE CHINCHAVLI5,900+ in Raigarh

Builder: SHREE MAHALAXMI DEVELOPERS

SHREE MAHALAXMI DEVELOPERS has 17 registrations on MahaRERA, including PANACHE and ADITI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SHREE MAHALAXMI SANKUL is delayed beyond 31 Mar 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE MAHALAXMI SANKUL?

The registered promoter entity is SHREE MAHALAXMI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE MAHALAXMI SANKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE MAHALAXMI SANKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE MAHALAXMI SANKUL?

The professionals named in the filing: Architect: INSPIRE ARCHITECT; Engineer: DESTECHSTRUCTURAL CONSULTANTS; Chartered Accountant: JAIN JAGTAP AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE MAHALAXMI SANKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE MAHALAXMI SANKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE MAHALAXMI SANKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.