Home / Browse projects / Thane, Maharashtra / SHREE MAHALAXMI RESIDENCY

Registered No litigation declared Others project

SHREE MAHALAXMI RESIDENCY

By SHREE GAJANAN BUILDERS AND DEVELOPERS

RG-MH-06286 · RERA P51700052999 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
10 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 60%
116 of 162Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SHREE MAHALAXMI RESIDENCY is a Others project by SHREE GAJANAN BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700052999 on 10 Oct 2023. Possession is promised by 31 Jul 2028. 46 of the 162 units on this registration are recorded sold or booked, and 10 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSHREE MAHALAXMI RESIDENCY
  • TypeOthers
  • Location
    • KHATIVALI
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • RERA no.P51700052999
  • ReraGenie IDRG-MH-06286

Builder

  • NameSHREE GAJANAN BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersARUN BALU PATIL, RUNVI ARUN PATIL
  • Other registrations6 more →
  • Completed4 of 7
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2023PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2023
  • Promised completion31 Jul 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed65 files

Current status

28%46 of 162 units booked
51.9%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA8735843
D WINGNA7629837
C WINGNA7630838
A WINGNA8735944

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 60%.

B WING64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A WING64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34
BuildingClosed/CoveredTotal
B WING99
D WING88
C WING88
A WING99

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,340 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Aug 2025
LandownerVillageDistrict
ANANT HALOJIKATHOLEVaholiThane
SANDIP DATTATRAY KATHOLEVaholiThane

Approvals and building plan

Sanctioning authorityAssistant Director Town Planning Thane
Permissible FSI9227.58
Proposed, not sanctioned9,228 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 8 AUM SUPREME RAMWADI OLD BAIL BAZAR KALYAN 421301
Estimated costRs 29.40 cr
Cost incurredRs 15.25 cr
Work done51.89%
BuildingWingEstimatedIncurred
B WINGNARs 7.26 crRs 6.67 cr
A WINGNARs 7.26 crRs 6.58 cr
D WINGNARs 6.19 cr-
C WINGNARs 6.19 cr-
-NARs 2.50 crRs 2.01 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDE CON CONSULTANTS
EngineerMANOHAR PATIL
Chartered AccountantVINESH AHUJA
Chartered AccountantGIRISH TARWANI
PartnerRole in project
SHREE GAJANAN BUILDERS AND DEVELOPERS-

Litigation declared1

CaseCourtStatus
144/2024/2024CIVIL COURT SD KALYANON GOING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000480042Yogesh Sadanand KatholeArun Balu Kathore11/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2028

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 - Shree Mahalaxmi Residency.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 final.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 signed.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 signed.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 signed_compressed.pdf28 Jan 2026
Form 5 (FY 2024-2025)File: Mahalaxmi Residency Form 5.pdf2 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf31 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf31 Oct 2025
Form 1File: Form 1 Signed.pdf28 Jul 2025
Form 2File: Shree Mahalaxmi Residency Engineer Certificate..pdf28 Jul 2025
Form 3File: Form 3.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold signed.pdf28 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 merged_compressed.pdf1 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 revised.pdf28 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank.pdf28 May 2025
Other - FinanceFile: undertaking.pdf28 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Mahalaxmi Residency Engineer Certificate.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Mahalaxmi Residency Architect Letter.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca certificate.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory Word f.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate shree Mahalaxmi Residency.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mahalaxmi.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Mahalaxmi.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: mahalaxmi residency.pdf31 Oct 2024
Disclosure of sold/ booked inventoryFile: Shree Mahalaxmi Residency sold unsold.pdf14 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 compressed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Mahalaxmi Residency Architect Letter.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2).pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate_11zon.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Letter.pdf28 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New CA Certificate.pdf13 Sep 2023
Other - LegalFile: Plan Declaration.pdf26 Aug 2023
Other - LegalFile: Sale Declaration.pdf26 Aug 2023
Layout approvalFile: FINAL PLAN.pdf3 Aug 2023
Building plan approvalFile: FINAL PLAN.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: FINAL PLAN.pdf3 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: FINAL PLAN.pdf3 Aug 2023
Copy of the legal title reportFile: New Title and search.pdf29 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200275923046_For_Asset_Based_Search_29_07_2023_16_06_25_004.pdf29 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order NEW.pdf27 Jul 2023
Declaration in FORM BFile: PARTNER FORM B.pdf27 Jul 2023
PAN CardFile: 1 PAN Card.pdf7 Jul 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf7 Jul 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf7 Jul 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf7 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf7 Jul 2023
CERSAI detailsFile: 1 CERSAI details.pdf7 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf7 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations.pdf7 Jul 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (2).pdf7 Jul 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf7 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow7 Jul 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf7 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation.pdf7 Jul 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
PRIDE TOWER211 212 213 2nd FLOOR PATEL PLAZA NEAR AJIT SCANNING CENTRE KALYAN 421301107CompletedJun 2021Late, Dec 2023

How this compares with Thane

28%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE MAHALAXMI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHATIVALI7,600+ in Thane

Builder: SHREE GAJANAN BUILDERS AND DEVELOPERS

SHREE GAJANAN BUILDERS AND DEVELOPERS has 7 registrations on MahaRERA, including GAJANAN PALACE and GAJANAN RESIDENCY. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE MAHALAXMI RESIDENCY is delayed beyond 31 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE MAHALAXMI RESIDENCY?

The registered promoter entity is SHREE GAJANAN BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE MAHALAXMI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREE MAHALAXMI RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREE MAHALAXMI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE MAHALAXMI RESIDENCY?

The professionals named in the filing: Architect: DE CON CONSULTANTS; Engineer: MANOHAR PATIL; Chartered Accountant: VINESH AHUJA; Chartered Accountant: GIRISH TARWANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE MAHALAXMI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE MAHALAXMI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE MAHALAXMI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.