De-registered No litigation declared Residential / Group Housing project

SHREE MAHALAXMI RESIDENCY

By MANOJ VASANT MAHADIK

RG-MH-29232 · RERA P52900027974 · Last updated on MahaRERA portal: 1 Dec 2023

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

SHREE MAHALAXMI RESIDENCY is a Residential / Group Housing project by MANOJ VASANT MAHADIK in Sindhudurg, Maharashtra, registered with MahaRERA as P52900027974 on 21 Jan 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameSHREE MAHALAXMI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • KANKAVLI
    • KASARDE
    • Anandnagar
    • Sindhudurg
    • 416801
  • Pincode416801
  • RERA no.P52900027974
  • ReraGenie IDRG-MH-29232

Builder

  • NameMANOJ VASANT MAHADIK
  • Entity typeIndividual
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

4 months past promisethis monthRegisteredJan 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on21 Jan 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE MAHALAXMI RESIDENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

SHREE MAHALAXMI RESIDENCY: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,500 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1500.0
Proposed, not sanctioned1,500 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAT AND POST TALERE, BAZARPETH, 416801

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABHILASHA DALVI
EngineerABHILASHA DALVI
Chartered AccountantKPT AND ASSOCIATES LLP
PartnerRole in project
MANOJ VASANT MAHADIK-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ANANDNAGAR 30112023 ARCHITECTS CER.pdf1 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANANDNAGAR 30112023 ENGINEER CER.pdf1 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf1 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 shree mahalaxmi residency31122022compressed.pdf19 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form3 shree mahalaxmi residency310322compressed.pdf19 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form5 shree mahalaxmi 20-21_compressed.pdf19 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form5 shree mahalaxmi 21-22_compressed.pdf19 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS 19-20.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS 20-21.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS 300621.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS 311221.pdf18 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER MAR 20.pdf18 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS JUNE 21.pdf18 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS MAR 21.pdf18 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Architect Certificate 31032020.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Architect Certificate 31032021.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Architect Certificate 30062021.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Architect Certificate 31122021.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Architect Certificate 31032022.pdf14 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Engineer Certificate 31032020.pdf14 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Engineer Certificate 31032021.pdf14 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 Engineer Certificate 30062021.pdf14 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 Engineer Certificate 31032022.pdf14 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance 31032020.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Mahalaxmi Residency - Architect Certificate.pdf29 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Mahalaxmi Residency - Engineer Certificate.pdf29 Jan 2022
Layout approvalFile: PLAN LAYOUT.pdf14 Jan 2021
Building plan approvalFile: PLAN LAYOUT.pdf14 Jan 2021
PAN CardFile: PAN.pdf14 Jan 2021
Copy of the legal title reportFile: TITLE SEARCH.pdf14 Jan 2021
Details of encumbrancesFile: DECLARATION.pdf14 Jan 2021
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT.pdf14 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: PLAN LAYOUT.pdf14 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: NA ORDER NEW.pdf14 Jan 2021
Declaration in FORM BFile: AFFIDAVITE.pdf14 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf14 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf14 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf14 Jan 2021
Proforma of Allotment letterFile: SATHEKARAR.pdf14 Jan 2021
OtherFile: NOC GRAMPANCHAYAT.pdf14 Jan 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MAHADIK PLAZAP52900055325TALERE, Sindhudurg46Mar 2024OngoingDec 2026Not due yet
MORYA RESIDENCYP52800026050Lanja, Ratnagiri32Aug 2020OngoingJun 2025Not delivered
SHREE RESIDENCYP52900025958PLOT NO 4, Sindhudurg-Aug 2020CompletedNov 2023Apr 2022
VAKRATUNDA PLAZAAT AND POST TALERE KANKAWLI1-CompletedMar 2017Mar 2017
MANGALMURTI RESIDENCYAANAND NAGAR KASARDE KANKAWLI SINDHUDURG1-CompletedMar 2017Mar 2017

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is among them

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep SHREE MAHALAXMI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASARDE530+ in Sindhudurg

Builder: MANOJ VASANT MAHADIK

MANOJ VASANT MAHADIK has 5 registrations on MahaRERA, including SIDDHI GANESH PARK and SHREE RESIDENCY. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What does it mean that SHREE MAHALAXMI RESIDENCY shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE MAHALAXMI RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE MAHALAXMI RESIDENCY?

The registered promoter entity is MANOJ VASANT MAHADIK, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE MAHALAXMI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE MAHALAXMI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE MAHALAXMI RESIDENCY?

The professionals named in the filing: Architect: ABHILASHA DALVI; Engineer: ABHILASHA DALVI; Chartered Accountant: KPT AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE MAHALAXMI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE MAHALAXMI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE MAHALAXMI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.