Registered No litigation declared Others project

SHREE KRUSHNA ARCADE

By AVAAS BUILDERS AND DEVELOPERS

RG-MH-52490 · RERA P99000008526 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 52 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 52 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 70%
101 of 174Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

SHREE KRUSHNA ARCADE is a Others project by AVAAS BUILDERS AND DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000008526 on 19 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 52 months from the original filing. 73 of the 174 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameSHREE KRUSHNA ARCADE
  • TypeOthers
  • Location
    • Near Shani Mandir
    • Nilemore - Nalasopara West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000008526
  • ReraGenie IDRG-MH-52490

Builder

  • NameAVAAS BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnerASHOK GOKUL CHAVAN

Key dates

this monthRegisteredAug 2017First promiseAug 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 28 Aug 2022)
  • Buildings1 building record
  • Documents filed109 files

Current status

42%73 of 174 units booked
69.2%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shree Krushna ArcadeNA111114826174

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

Shree Krushna Arcade: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered58
Open Space54

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,804 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Mar 2026
LandownerVillageDistrict
Shree Krishna Complex Housing SocietyVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI6929.4
Proposed, not sanctioned6,929 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThakur Arcade, NEar Railway Station, Virar West, PIN - 401303
Estimated costRs 19.13 cr
Cost incurredRs 13.23 cr
Work done69.17%
BuildingWingEstimatedIncurred
Shree Krushna ArcadeNARs 15.94 crRs 13.23 cr
-NARs 3.19 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUmesh Kekre
EngineerSHILPLEKHA ASSOCIATES
Chartered AccountantDOLLY MILAN ASHAR
PartnerRole in project
AVAAS BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000011523Aug 2022 → Aug 2023

Reason as filed by the promoterWORK IN PROGRESS

EXT99000017404Aug 2022 → Dec 2026

Reason as filed by the promoterDELAY DUE TO CHANGE IN CONTRACTORS AND FINANCIAL CRISES.

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000195023Ravindra Balasaheb SawantM/s Aavas builders and developers29/11/2020
CC006000000302976Nandkumar Ashok KinareAvaas Builders & Developers08/10/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1 new (1) latest.pdf19 Mar 2026
Withdrawal Update Form 1File: Form 1 new (1) latest.pdf19 Mar 2026
Withdrawal Update Form 1File: Form 1 new (1) latest.pdf19 Mar 2026
Withdrawal Update Form 2File: Eng certificate signed.pdf19 Mar 2026
Withdrawal Update Form 2File: Eng certificate signed.pdf19 Mar 2026
Withdrawal Update Form 2File: Eng certificate signed.pdf19 Mar 2026
Withdrawal Update Form 3File: Form_3 new_merged.pdf19 Mar 2026
Withdrawal Update Form 3File: Form_3 new_merged.pdf19 Mar 2026
Withdrawal Update Form 3File: Form_3 new_merged.pdf19 Mar 2026
Form 1File: FORM 1.pdf16 Mar 2026
Form 2File: FORM 2.pdf16 Mar 2026
Form 3File: Form-3 Avaas Builders and developers_11zon.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosures of sold booked inventory new.pdf16 Mar 2026
Form 1File: Architects Certificate Form-1 Avaas Builders.pdf16 Mar 2026
Form 2File: Form -2 Engineering Certificate Avaas Developers.pdf16 Mar 2026
Form 3File: Form-3 Ekvira leela.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosures of sold booked inventory new.pdf16 Mar 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Form-1 Avaas Builders.pdf29 Apr 2025
Certificates of CA (Form 3)File: Form-3 Ekvira leela.pdf29 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineering Certificate Avaas Developers.pdf29 Apr 2025
Certificates of CA (Form 3)File: Form-3 Avaas Builders and developers_11zon.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf3 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf3 Feb 2025
Layout approvalFile: plan copy new 1 layout_11zon.pdf11 Aug 2024
Building plan approvalFile: plan copy new_11zon.pdf11 Aug 2024
Copy of Layout Approval (in case of layout)File: plan copy new 1 layout_11zon.pdf11 Aug 2024
Building Plan Approval (IOD)File: plan copy new_11zon.pdf11 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: new cc copy.pdf11 Aug 2024
Declaration about Commencement CertificateFile: declration about cc.pdf11 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24_compressed.pdf11 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account new_compressed.pdf11 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosures of sold booked inventory new.pdf7 Aug 2024
Certificates of CA (Form 3)File: form 3 new merged.pdf7 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan 12 Jul 2024.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 new (1) latest.pdf16 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 new (1) latest.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A 23-24.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory.pdf16 Jul 2024
Certificates of CA (Form 3)File: Forms 3_11zon.pdf16 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5latest.pdf1 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC ARCHITECT LETTER.pdf30 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Cert 2019 20.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22.pdf7 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf7 Dec 2023
CERSAI detailsFile: Cersia.pdf7 Dec 2023
Certificates of CA (Form 3)File: Form3 latest.pdf7 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discclosure.pdf7 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5latest.pdf7 Dec 2023
Proforma of Agreement for saleFile: Agreement for sale.pdf7 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC AVAAS.pdf23 Nov 2023
Declaration in FORM BFile: form b.pdf23 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FOrm1.pdf23 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5Avaasbuildersdeveloper2223.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5Avaasbuildersdeveloper2223.pdf23 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2.pdf30 Oct 2023
Certificates of CA (Form 3)File: FORM3.pdf30 Oct 2023
Details of encumbrances concerned to FinanceFile: LEGAL SEARCH - 05-09-2023_.pdf8 Sep 2023
Details of encumbrances concerned to LegalFile: LEGAL SEARCH - 05-09-2023_.pdf8 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: LETTER.pdf8 Sep 2023
Foreclosure of the ProjectFile: FORECLOSURE OF PROJECT.pdf20 Apr 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT LETTER.pdf20 Apr 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - AGREEMENT TO SALE.pdf20 Apr 2023
Other - FinanceFile: FINANCIAL LETTER.pdf20 Apr 2023
Other - TechnicalFile: TECHNICAL LETTER.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT.pdf22 Feb 2022
Declaration about Commencement CertificateFile: COMM DECLARATION.pdf17 Jan 2022
OtherFile: TRF DEV RIGHT.pdf29 Sep 2021
OtherFile: RERA-COMPLAINT.pdf10 Jun 2021
Details of Restarting of Construction work post lockdownFile: LOCK DOWN LETTER.pdf2 Jan 2021
OtherFile: RETIREMENT DEED.pdf2 Jan 2021
OtherFile: Architec 14 Oct 2020.pdf2 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architec 14 Oct 2020.pdf21 Oct 2020
OtherFile: Retirement Deed.pdf21 Oct 2020
OtherFile: DECLARATON.pdf23 Oct 2019
OtherFile: Partnership -Deed -2019.pdf23 Oct 2019

How this compares with Palghar

42%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 52 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE KRUSHNA ARCADE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nilemore - Nalasopara West3,200+ in Palghar

2 kmSHREE KRUSHNA ARCADECompleted 37Lapsed / revoked 29Other 112Dot size: filed unitsN

Filed coordinates, straight-line distance. 178 registered projects within 2 km.

Builder: AVAAS BUILDERS AND DEVELOPERS

AVAAS BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SHREE KRUSHNA ARCADE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREE KRUSHNA ARCADE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE KRUSHNA ARCADE?

The registered promoter entity is AVAAS BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE KRUSHNA ARCADE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHREE KRUSHNA ARCADE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHREE KRUSHNA ARCADE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE KRUSHNA ARCADE?

The professionals named in the filing: Architect: Umesh Kekre; Engineer: SHILPLEKHA ASSOCIATES; Chartered Accountant: DOLLY MILAN ASHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE KRUSHNA ARCADE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE KRUSHNA ARCADE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE KRUSHNA ARCADE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.