Home / Browse projects / Mumbai Suburban, Maharashtra / SHREE KRISHNA RESIDENCY
SHREE KRISHNA RESIDENCY
RG-MH-46615 · RERA P51800018508 · Last updated on MahaRERA portal: 19 Jan 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE KRISHNA RESIDENCY is a Others project by SHREE KRISHNA DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018508 on 12 Nov 2018. The registration is recorded completed; possession was promised by 1 Jun 2022.
At a glance
Project
- NameSHREE KRISHNA RESIDENCY
- TypeOthers
- Location
- JAMNADAS ADUKIA ROAD
- KANDIVALI WEST MUMBAI
- Borivali
- Mumbai Suburban
- 400067
- Pincode400067
- RERA no.P51800018508
- ReraGenie IDRG-MH-46615
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Nov 2018
- Promised completion1 Jun 2022
- Revised completionNone
- Buildings1 building record
- Documents filed109 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE KRISHNA RESIDENCY | NA | 79 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
SHREE KRISHNA RESIDENCY: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 65% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 19 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHWIN R MEHTA |
| Engineer | RAJESH N SHAH |
| Partner | Role in project |
|---|---|
| SHREE KRISHNA DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Jun 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 May 2022
Documents filed109
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: DETAILS OF ENCUMBRANCES.pdf | 19 Jan 2023 |
| Details of encumbrances concerned to LegalFile: DETAILS OF ENCUMBRANCES.pdf | 19 Jan 2023 |
| CERSAI detailsFile: CERSAI details.pdf | 19 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 19 Jan 2023 |
| Proforma of Agreement for saleFile: RERA DRAFT ALLOTTMENT AND MODEL AGREEMENT FOR SALE.pdf | 19 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: There is no separate bank account hence no details needed to provide including there is no | 19 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 19 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf | 19 Jan 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: FINAL ALKA FORM 4.pdf | 31 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 30 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 30 May 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FINAL OCCUPANTION CERTIFICATE AND BUILDING COMPLETION CERTIFCIATE 2313282_OC_signed.pdf | 30 May 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: REGISTRATION OF SOCIETY.pdf | 30 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 28 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 28 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 28 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 28 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 1_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 2_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 3_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 4_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 5_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 6_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 7_compressed.pdf | 26 May 2022 |
| Building plan approvalFile: Drawing amenment PAGE 8_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 1_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 2_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 3_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 4_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 5_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 6_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 7_compressed.pdf | 26 May 2022 |
| Building Plan Approval (IOD)File: Drawing amenment PAGE 8_compressed.pdf | 26 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: final Commencement Certificate.pdf | 26 May 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 26 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM NO 1.pdf | 18 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Binder1.pdf | 18 Jan 2022 |
| Certificates of CA (Form 3)File: Binder1.pdf | 18 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 9 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 9 Aug 2021 |
| Certificates of CA (Form 3)File: FINAL.pdf | 9 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL Binder1.pdf | 5 Apr 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 5 Apr 2021 |
| Certificates of CA (Form 3)File: FINAL.pdf | 5 Apr 2021 |
| Building plan approvalFile: 1.pdf | 16 Jun 2020 |
| Building plan approvalFile: 2.pdf | 16 Jun 2020 |
| Building plan approvalFile: 3.pdf | 16 Jun 2020 |
| Building plan approvalFile: 4.pdf | 16 Jun 2020 |
| Building plan approvalFile: 5-6.pdf | 16 Jun 2020 |
| Building plan approvalFile: 7.pdf | 16 Jun 2020 |
| Building Plan Approval (IOD)File: 1.pdf | 16 Jun 2020 |
| Building Plan Approval (IOD)File: 2.pdf | 16 Jun 2020 |
| Building Plan Approval (IOD)File: 3.pdf | 16 Jun 2020 |
| Building Plan Approval (IOD)File: 4.pdf | 16 Jun 2020 |
| Building Plan Approval (IOD)File: 5-6.pdf | 16 Jun 2020 |
| Building Plan Approval (IOD)File: 7.pdf | 16 Jun 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: 2241484Amendletter_signed 24-03-2020 by EE.pdf | 16 Jun 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FINAL.pdf | 6 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 5 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 5 Mar 2020 |
| Certificates of CA (Form 3)File: FINAL.pdf | 5 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 19 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 19 Dec 2019 |
| Certificates of CA (Form 3)File: FINAL 1.pdf | 19 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: FINAL.pdf | 1 Nov 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL.pdf | 23 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL.pdf | 23 Aug 2019 |
| Certificates of CA (Form 3)File: FINAL.pdf | 23 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FINAL Binder1.pdf | 23 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FINAL Binder1.pdf | 23 Jul 2019 |
| Certificates of CA (Form 3)File: FINAL.pdf | 23 Jul 2019 |
| Building plan approvalFile: PAGE 1 ALKA LAST APPROVED PLAN DWG (3).pdf | 1 Mar 2019 |
| Building plan approvalFile: PAGE 2 ALKA FURTHER 16FLR APPROVED PLAN DWG (2).pdf | 1 Mar 2019 |
| Building plan approvalFile: PAGE 3 ALKA FURTHER 16FLR APPROVED PLAN DWG (2).pdf | 1 Mar 2019 |
| Building plan approvalFile: PAGE 4 ALKA FURTHER 16FLR APPROVED PLAN DWG (3).pdf | 1 Mar 2019 |
| Building plan approvalFile: PAGE 5 ALKA FURTHER 16FLR APPROVED PLAN DWG (2).pdf | 1 Mar 2019 |
| Building Plan Approval (IOD)File: PAGE 1 ALKA LAST APPROVED PLAN DWG (3).pdf | 1 Mar 2019 |
| Building Plan Approval (IOD)File: PAGE 2 ALKA FURTHER 16FLR APPROVED PLAN DWG (2).pdf | 1 Mar 2019 |
| Building Plan Approval (IOD)File: PAGE 3 ALKA FURTHER 16FLR APPROVED PLAN DWG (2).pdf | 1 Mar 2019 |
| Building Plan Approval (IOD)File: PAGE 4 ALKA FURTHER 16FLR APPROVED PLAN DWG (3).pdf | 1 Mar 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 11 other registrations, which the RERA portal never shows together
- All 109 filed documents as one ZIP, foldered, with a manifest
Keep SHREE KRISHNA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KANDIVALI WEST MUMBAI6,700+ in Mumbai Suburban
Ruparel Optima Ph I
Ruparel Infra & Realty Pvt Ltd
"SALE BLDG NO. 6 (A & B) WING KNOWN AS NORTHER
N.ROSE DEVELOPERS PVT LTD
JP Commerz
Metallica Industries Limited
Ruparel Skygreens I
Shree Siddhivinayak Infrastructure & Realt
ShreejiAikyam
Rushabh Developers
Shiv Vardaan
NAVKARMIK HOMES LLP, URVI CONSTRUCTION
See every Mumbai Suburban project, with the district possession charts
Builder: SHREE KRISHNA DEVELOPERS
SHREE KRISHNA DEVELOPERS has 12 registrations on MahaRERA, including SHREE KRISHNA HEIGHTS and SUNFLOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SHREE KRISHNA RESIDENCY is delayed beyond 1 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE KRISHNA RESIDENCY?
The registered promoter entity is SHREE KRISHNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE KRISHNA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE KRISHNA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE KRISHNA RESIDENCY?
The professionals named in the filing: Architect: ASHWIN R MEHTA; Engineer: RAJESH N SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE KRISHNA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback