SHREE HILL SIDE
RG-KA-46847 · RERA PRM/KA/RERA/1257/334/PR/230522/004910 · Last updated on RERA Karnataka portal: 23 Apr 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SHREE HILL SIDE is a Residential/Group Housing project by GIREESH M SHETTY in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/230522/004910 on 23 May 2022. Possession is promised by 30 Dec 2025.
At a glance
Project
- NameSHREE HILL SIDE
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- 575008
- Pincode575008
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/230522/004910
- ReraGenie IDRG-KA-46847
Builder
- NameGIREESH M SHETTY
- Entity typeProprietorship Firm
- GSTIN29ASEPS8038A2ZL
- Authorized SignatoryGIREESH M SHETTY
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 May 2022
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE HILL SIDE | - | - | - | 53 | 0 | 53 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 23 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 23 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| GIREESH M SHETTY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 11.25 cr | - |
| On-site expenditure-Salaries of workers,Consultants Fees,Site Overhead,Cost Of Services(Water, Electricity, Sewage) | Rs 35.00 lakh | - |
| Payment of taxes | Rs 15.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GOKULRAJ |
| Engineer | GOKULRAJ |
| Chartered Accountant | SHRAVANA DOTA |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed74
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/230522/004910 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| WATER NOCFile: water noc.jpg | 23 Apr 2022 |
| POWER NOCFile: mescom noc.pdf | 23 Apr 2022 |
| BROUCHERFile: broucher FINAL.pdf | 23 Apr 2022 |
| FIRE NOCFile: fire noc.pdf | 23 Apr 2022 |
| CLARIFICATIONFile: clarification.jpg | 23 Apr 2022 |
| RTC, survey 81/4 P | - |
| Mutation, survey 81/4 P | - |
| Encumbrance Certificate, survey 81/4 P | - |
| Conversion/Alienation Order, survey 81/4 P | - |
| Sale/Title/Gift Deed, survey 81/4 P | - |
| Khatha, survey 81/4 P | - |
| Certificate issued by CA Form 1File: Form 1 CA CERTFICATE_compressed.pdf | - |
| Certificate issued by Architect Form 2File: architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: litigation affidavit.pdf | - |
| Certificate from Chartered AccountFile: Approval Cost.pdf | - |
| Balance Sheet 2020 - 2021File: BS 2020-21.pdf | - |
| Balance Sheet 2019 - 2020File: BA 2019-20.pdf | - |
| Balance Sheet 2018 - 2019File: BS 2018-19.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: P&L 2020-21.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: P&L 2019-20.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: P&L 2018-19.pdf | - |
| Cash Flow Statement 2020 - 2021File: IS 2020-21.pdf | - |
| Cash Flow Statement 2019 - 2020File: IS 2019-20.pdf | - |
| Auditor's Report 2020 - 2021File: AR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: Income Tax UDIN certificate-ca.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: ITR 19-20.pdf | - |
| building licence | - |
| sanction plan merge_compressed | - |
| single layout | - |
| sanction plan merge_compressed | - |
| sanction plan merge_compressed | - |
| single layout | - |
| shi hill side specifications | - |
| single layout | - |
| single layout | - |
| STABILY CERTIFICATE | - |
| SEARCH REPORT | - |
| title deed | - |
| conversion order | - |
| conversion order | - |
| proforma AOS | - |
| allottment letter | - |
| form b | - |
| affidavit 3(1) | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| pollution noc | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| stp drawing | - |
| master plan | - |
| Prospectus/BrochureFile: broucher FINAL.pdf | - |
| Occupancy CertificateFile: OC.jpeg | - |
| Architect certificate for having completed the work(in format no 5)File: Architect certificate.pdf | - |
| Chartered Accountant certificate for having completed the work(in format no 4)File: From 4CC_compressed.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: completion affidavit.pdf | - |
| engineer certificateFile: Engineer's certificate.pdf | - |
| completion certificateFile: completion certificate.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep SHREE HILL SIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
REB GRAND VIEW
RAI ESTATES AND BUILDERS PRIVATE LIMITED
INLAND ASCOTT
INLAND INFRASTRUCTURE DEVELOPERS PRIVATE L
AGRAJA ATLANTIC
AGRAJA MANJUSHREE
POONAM AVENUE
POONAM BUILDERS & YENMARK BUILDERS
LOTUS ROVIN
LOTUS PROPERTIES
Sai Prakash
Titan Developers
See every Dakshina Kannada project, with the district possession charts
Builder: GIREESH M SHETTY
GIREESH M SHETTY has 1 registration on RERA Karnataka, including SHREE HILL SIDE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if SHREE HILL SIDE is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHREE HILL SIDE?
The registered promoter entity is GIREESH M SHETTY, a proprietorship firm as per the filing. Its GSTIN 29ASEPS8038A2ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHREE HILL SIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHREE HILL SIDE?
The professionals named in the filing: Architect: GOKULRAJ; Engineer: GOKULRAJ; Chartered Accountant: SHRAVANA DOTA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE HILL SIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.