Registration approved No litigation declared Mixed Development project

REB GRAND VIEW

By RAI ESTATES AND BUILDERS PRIVATE LIMITED

RG-KA-80554 · RERA PRM/KA/RERA/1257/334/PR/140622/004979 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
5 of 19Construction stages donefurthest along: RCC or MS Framed structure, 63%
152 of 201Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 211 documents Report an error

REB GRAND VIEW is a Mixed Development project by RAI ESTATES AND BUILDERS PRIVATE LIMITED in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/140622/004979 on 14 Jun 2022. Possession is promised by 31 Dec 2029. 49 of the 201 units on this registration are recorded sold or booked, and 5 of 19 construction stages are filed complete.

At a glance

Project

  • NameREB GRAND VIEW
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575008
  • Pincode575008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/140622/004979
  • ReraGenie IDRG-KA-80554

Builder

  • NameRAI ESTATES AND BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN29AAFCR5310N1Z2
  • Authorized SignatoryAshok Kumar Rai
  • Managing DirectorAshok Kumar Rai
  • DirectorsAshokKumar Rai, Suma A Rai
  • Project HeadAshok Rai
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2022PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Jun 2022
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed211 files

Current status

24%49 of 201 units booked
3.5%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-----42
B---1590159

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 19 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 63%.

Building: 45% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure63%
Masonry Construction52%
Plastering inside , outside & Ceiling48%
Joinery: Doors, Windows, Ventilators etc43%
Basic work of Water supply, Sanitary and Electrification39%
Dadoing, Skirting, Flooring, Tiles work (All types)8%
Railing and Grill fixing15%
Electrification, Water supply and Sanitary Finishing35%
Painting18%
Fire prevention and fire fighting fitting and fixture with network35%
Weather Proof work(tile,concrete)8%
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes10%
Sewage and Drainage SystemYes10%
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes10%
Solid waste management and disposalYes10%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes50%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes10%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes35%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes35%
Club HouseYes15%
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes15%
ParksYes0%
Power BackupYes5%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes43%
LiftsYes35%
Corridor/LobbiesNoNot applicable
Fire escapesYes35%
Common entrance and exit for the building/common portico/foyer/verandahYes45%
BasementYes45%
TerraceYes40%
Outer WallYes40%
Open parking areasYes25%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,110 sq m
Named landowners2
LandownerVillageDistrict
Rai Estates and Builders Private Limited--
Rai Estates And Builders Private Limted--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 64.55 cr
Cost incurredRs 2.26 cr
Spent of the estimate3.5%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 39.65 crRs 1.48 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 19.00 crRs 59.61 lakh
On-site expenditure-Salaries of workersRs 1.50 crRs 12.04 lakh
On-site expenditure-Site OverheadRs 1.50 crRs 2.08 lakh
On-site expenditure-Consultants FeesRs 1.25 crRs 2.36 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 60.00 lakhRs 1.42 lakh
Payment of taxesRs 50.00 lakh-
Payment of feesRs 30.00 lakh-
Payment of chargesRs 15.00 lakhRs 26,303
Payment of PremiumsRs 10.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSuresh Kumar
EngineerSuresh Kumar
Chartered AccountantB.Sudesh Kumar Rai

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed211

As listed on the registration, under the names the promoter filed them with; the newest 80 of 211 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/140622/004979 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: REB Grand View (3) (1)_compressed.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q2 FY26-27).pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-2 FY-26-27).pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4_compressed.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q1 FY26-27).pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-1 FY-26-27) (1).pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: fORM-4_11zon.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q4 FY25-26).pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-4 FY-25-26).pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q4 2025-26 Fire and Safety14 Apr 2026
Q4 2025-26 Airport Authority of India14 Apr 2026
1) UPLOADED MODIFIED APPROVED PLAN : PLEASE CHECK OUT OLD PLAN WITH NEW PLAN TO KNOW THE MODIFICATIOFile: modified Ablock plan (1).pdf31 Mar 2026
UPLOADED MODIFIED PLAN ORDER -UNDER OLD ORDER ONLY 9 FLOORS.., IN MODIFIED 11 FLOORSFile: Modified approved plan order.PDF31 Mar 2026
UPLOADED RENEWED LICENSE OF MODIFIED PLANFile: bondel license (renewed).PDF31 Mar 2026
1)UPLOADED FORM6 : REFLECTING REVISED COST OF CONSTRUCTION AS CERTIFIED BY ENGINEERFile: form -6 (as per revised estimated cost).pdf31 Mar 2026
UPLOADED CERTIFICATE OF REVISED ESTIMATED COST OF CONSTRUCTION CERTIFED BY ENGINEERFile: _revised estimated certificate.pdf31 Mar 2026
UPLOADED SCREEN SHORT OF PORTAL REFLECTING COST OF CONSTRUCTION BY THE TIME OF REGISTRATIONFile: ESTIMATED CONSTRUCTION COST AS PER ENGINEER BY THE TIME OF REGISTRATION.PNG31 Mar 2026
2) UPLOADED CLARIFICATION OF STRUCTURAL ENGINEER FOR RERAFile: Rera Clarification (1).pdf31 Mar 2026
UPLOADED CERTIFICATE OF ENGINEERFile: Anil Hegde Cerificate -Mtech (1).pdf31 Mar 2026
UPLOADED LICENSE COPY OF STRUCTURAL ENGINEERFile: Certificate anil hegde (1) (1).pdf31 Mar 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA FORM -4.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q3 FY25-26).pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-3 FY-25-26).pdf15 Jan 2026
Q3 2025-26 Water supply and sewage board15 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)15 Jan 2026
Q3 2025-26 KPTCL- BESCOM15 Jan 2026
Q3 2025-26 Fire and Safety15 Jan 2026
Q3 2025-26 Airport Authority of India15 Jan 2026
1.Uploaded Modified A Block plan. As old plan of A Block 9th floor modified to 11th floorFile: modified Ablock plan (1).pdf1 Dec 2025
2.Uploaded Modified A Block plan order .File: Modified approved plan order.PDF1 Dec 2025
1) Uploaded Alotees details in list of alotees along with details project address with signatureFile: ALOTEE WITH ADD & SIGN.pdf1 Dec 2025
2) Uploaded structural stability certificate metioning details of modified A blockFile: Stability Certificate - Rai Estate & Builders - REB Grand View Block A Residential Buildin1 Dec 2025
Uploaded structural engineer licenseFile: license structural eng.pdf1 Dec 2025
3) Uploaded 2/3 alotee consent ,As total 15 flat booked in A block, 10 Alotees consent uploadedFile: consent -1.PDF1 Dec 2025
Uploaded consent letter -2File: consent -2.PDF1 Dec 2025
Uploaded consent letter -3File: consent -3.PDF1 Dec 2025
Uploaded Consent letter -4File: consent -4.PDF1 Dec 2025
Uploaded Consent - 5File: consent -5.PDF1 Dec 2025
Uploaded consent letter -6File: consent -6.PDF1 Dec 2025
Uploaded Consent letter - 7File: consent -7.PDF1 Dec 2025
Uploaded consent letter -8File: consent -8.pdf1 Dec 2025
Uploaded consent letter - 9File: consent 9.pdf1 Dec 2025
Uploaded consent letter -10File: consent 10.pdf1 Dec 2025
4) Uploaded Form -6 , As the total estimated cost of Rs.46.15 cr. mentione in this certificateFile: Form -6, Engineer .pdf1 Dec 2025
Uploaded revised estimated cost certificte clearly mention total revised cost of the project 46.15File: _revised estimated certificate.pdf1 Dec 2025
Uploaded letter regarding any new land is not addedFile: letter for no land added.PDF7 Oct 2025
1. Uploaded Modification approved planFile: modified Ablock plan (1).pdf7 Oct 2025
2. Uploaded Modification approved orderFile: modification approved order.pdf7 Oct 2025
1) Uploading Sold and unsold details duly signed by authorized personFile: sold & unsold.PDF7 Oct 2025
Uploaded List of allotees duly signed by authorized personFile: list of alotee0001.PDF7 Oct 2025
2) Uploaded Structural stability certificate as per modified planFile: structural Cerificate - REB Grand View -Padushedde Village Bondel,Mangalore.pdf7 Oct 2025
3) Uploaded 2/3 allotee consent formFile: consent letter .pdf7 Oct 2025
4) Uploaded rectified Form-6File: Form -6, Engineer .pdf7 Oct 2025
5) Uploaded fire NOCFile: FIRE NOC.pdf7 Oct 2025
Fire NOCFile: Fire NOC .pdf2 Jun 2022
Fire NOCFile: FIRE NOC 1 .PDF2 Jun 2022
Request letterFile: REQUEST LTR.PDF2 Jun 2022
1) Certified master plan Extract is uploadedFile: certified master plan extract.PDF14 May 2022
2} KSPCB CFE/CEO : Affidavit & application submittedFile: KSPCB Affidavit & ACK,Fee paid recpt.pdf14 May 2022
4) FAR Premium not applicable Letter uploadedFile: FAR.PDF14 May 2022
MESCOM NOC UploadedFile: MESCOM NOC.PDF14 May 2022
Airport NOC UploadedFile: AIRPORT NOC.pdf14 May 2022
2) Fire noc affidavit and Acknowledgement uploadedFile: Fire affidavit & ACK.pdf14 May 2022
2) Borewell yield certificate uploadedFile: BOREWELL YIELD TEST CERTIFICATE.PDF14 May 2022
3) KSPCB Affidavit with application and fee paid receipt uploadedFile: KSPCB Affidavit & ACK,Fee paid recpt.pdf14 May 2022
APPLICATION FOR MASTER PLANFile: certified master plan extract application.PDF9 Apr 2022
POLLUTION BOARD- DECLARATIONFile: Polution NOC.PDF9 Apr 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
REB PUTTUR HEIGHTSBy pass Road.Puttur,D.kOngoingMar 2024Not delivered

How this compares with Dakshina Kannada

24%of this project is bookeddistrict median 38%
30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep REB GRAND VIEW on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmREB GRAND VIEWOther 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: RAI ESTATES AND BUILDERS PRIVATE LIMITED

RAI ESTATES AND BUILDERS PRIVATE LIMITED has 1 registration on RERA Karnataka, including REB GRAND VIEW. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if REB GRAND VIEW is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of REB GRAND VIEW?

The registered promoter entity is RAI ESTATES AND BUILDERS PRIVATE LIMITED, a company as per the filing. Its GSTIN 29AAFCR5310N1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in REB GRAND VIEW?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at REB GRAND VIEW?

The professionals named in the filing: Architect: Suresh Kumar; Engineer: Suresh Kumar; Chartered Accountant: B.Sudesh Kumar Rai. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in REB GRAND VIEW?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About REB GRAND VIEW. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save REB GRAND VIEW to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.