Home / Browse projects / Dakshina Kannada, Karnataka / REB GRAND VIEW
REB GRAND VIEW
By RAI ESTATES AND BUILDERS PRIVATE LIMITED
RG-KA-80554 · RERA PRM/KA/RERA/1257/334/PR/140622/004979 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
REB GRAND VIEW is a Mixed Development project by RAI ESTATES AND BUILDERS PRIVATE LIMITED in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/140622/004979 on 14 Jun 2022. Possession is promised by 31 Dec 2029. 49 of the 201 units on this registration are recorded sold or booked, and 5 of 19 construction stages are filed complete.
At a glance
Project
- NameREB GRAND VIEW
- TypeMixed Development
- Location
- Mangalore
- Dakshina Kannada
- 575008
- Pincode575008
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/140622/004979
- ReraGenie IDRG-KA-80554
Builder
- NameRAI ESTATES AND BUILDERS PRIVATE LIMITED
- Entity typeCompany
- GSTIN29AAFCR5310N1Z2
- Authorized SignatoryAshok Kumar Rai
- Managing DirectorAshok Kumar Rai
- DirectorsAshokKumar Rai, Suma A Rai
- Project HeadAshok Rai
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on14 Jun 2022
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings2 building records
- Documents filed211 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | - | - | 42 |
| B | - | - | - | 159 | 0 | 159 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 19 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 63%.
Building: 45% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 63% |
| Masonry Construction | 52% |
| Plastering inside , outside & Ceiling | 48% |
| Joinery: Doors, Windows, Ventilators etc | 43% |
| Basic work of Water supply, Sanitary and Electrification | 39% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 8% |
| Railing and Grill fixing | 15% |
| Electrification, Water supply and Sanitary Finishing | 35% |
| Painting | 18% |
| Fire prevention and fire fighting fitting and fixture with network | 35% |
| Weather Proof work(tile,concrete) | 8% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 10% |
| Sewage and Drainage System | Yes | 10% |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 10% |
| Solid waste management and disposal | Yes | 10% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 50% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 10% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 35% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 35% |
| Club House | Yes | 15% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | Yes | 15% |
| Parks | Yes | 0% |
| Power Backup | Yes | 5% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 43% |
| Lifts | Yes | 35% |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | Yes | 35% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 45% |
| Basement | Yes | 45% |
| Terrace | Yes | 40% |
| Outer Wall | Yes | 40% |
| Open parking areas | Yes | 25% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Rai Estates and Builders Private Limited | - | - |
| Rai Estates And Builders Private Limted | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 39.65 cr | Rs 1.48 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 19.00 cr | Rs 59.61 lakh |
| On-site expenditure-Salaries of workers | Rs 1.50 cr | Rs 12.04 lakh |
| On-site expenditure-Site Overhead | Rs 1.50 cr | Rs 2.08 lakh |
| On-site expenditure-Consultants Fees | Rs 1.25 cr | Rs 2.36 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 60.00 lakh | Rs 1.42 lakh |
| Payment of taxes | Rs 50.00 lakh | - |
| Payment of fees | Rs 30.00 lakh | - |
| Payment of charges | Rs 15.00 lakh | Rs 26,303 |
| Payment of Premiums | Rs 10.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Suresh Kumar |
| Engineer | Suresh Kumar |
| Chartered Accountant | B.Sudesh Kumar Rai |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed211
As listed on the registration, under the names the promoter filed them with; the newest 80 of 211 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/140622/004979 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: REB Grand View (3) (1)_compressed.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q2 FY26-27).pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-2 FY-26-27).pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4_compressed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q1 FY26-27).pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-1 FY-26-27) (1).pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: fORM-4_11zon.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q4 FY25-26).pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-4 FY-25-26).pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| 1) UPLOADED MODIFIED APPROVED PLAN : PLEASE CHECK OUT OLD PLAN WITH NEW PLAN TO KNOW THE MODIFICATIOFile: modified Ablock plan (1).pdf | 31 Mar 2026 |
| UPLOADED MODIFIED PLAN ORDER -UNDER OLD ORDER ONLY 9 FLOORS.., IN MODIFIED 11 FLOORSFile: Modified approved plan order.PDF | 31 Mar 2026 |
| UPLOADED RENEWED LICENSE OF MODIFIED PLANFile: bondel license (renewed).PDF | 31 Mar 2026 |
| 1)UPLOADED FORM6 : REFLECTING REVISED COST OF CONSTRUCTION AS CERTIFIED BY ENGINEERFile: form -6 (as per revised estimated cost).pdf | 31 Mar 2026 |
| UPLOADED CERTIFICATE OF REVISED ESTIMATED COST OF CONSTRUCTION CERTIFED BY ENGINEERFile: _revised estimated certificate.pdf | 31 Mar 2026 |
| UPLOADED SCREEN SHORT OF PORTAL REFLECTING COST OF CONSTRUCTION BY THE TIME OF REGISTRATIONFile: ESTIMATED CONSTRUCTION COST AS PER ENGINEER BY THE TIME OF REGISTRATION.PNG | 31 Mar 2026 |
| 2) UPLOADED CLARIFICATION OF STRUCTURAL ENGINEER FOR RERAFile: Rera Clarification (1).pdf | 31 Mar 2026 |
| UPLOADED CERTIFICATE OF ENGINEERFile: Anil Hegde Cerificate -Mtech (1).pdf | 31 Mar 2026 |
| UPLOADED LICENSE COPY OF STRUCTURAL ENGINEERFile: Certificate anil hegde (1) (1).pdf | 31 Mar 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA FORM -4.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect (Q3 FY25-26).pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (Q-3 FY-25-26).pdf | 15 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 15 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 15 Jan 2026 |
| Q3 2025-26 Fire and Safety | 15 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 15 Jan 2026 |
| 1.Uploaded Modified A Block plan. As old plan of A Block 9th floor modified to 11th floorFile: modified Ablock plan (1).pdf | 1 Dec 2025 |
| 2.Uploaded Modified A Block plan order .File: Modified approved plan order.PDF | 1 Dec 2025 |
| 1) Uploaded Alotees details in list of alotees along with details project address with signatureFile: ALOTEE WITH ADD & SIGN.pdf | 1 Dec 2025 |
| 2) Uploaded structural stability certificate metioning details of modified A blockFile: Stability Certificate - Rai Estate & Builders - REB Grand View Block A Residential Buildin | 1 Dec 2025 |
| Uploaded structural engineer licenseFile: license structural eng.pdf | 1 Dec 2025 |
| 3) Uploaded 2/3 alotee consent ,As total 15 flat booked in A block, 10 Alotees consent uploadedFile: consent -1.PDF | 1 Dec 2025 |
| Uploaded consent letter -2File: consent -2.PDF | 1 Dec 2025 |
| Uploaded consent letter -3File: consent -3.PDF | 1 Dec 2025 |
| Uploaded Consent letter -4File: consent -4.PDF | 1 Dec 2025 |
| Uploaded Consent - 5File: consent -5.PDF | 1 Dec 2025 |
| Uploaded consent letter -6File: consent -6.PDF | 1 Dec 2025 |
| Uploaded Consent letter - 7File: consent -7.PDF | 1 Dec 2025 |
| Uploaded consent letter -8File: consent -8.pdf | 1 Dec 2025 |
| Uploaded consent letter - 9File: consent 9.pdf | 1 Dec 2025 |
| Uploaded consent letter -10File: consent 10.pdf | 1 Dec 2025 |
| 4) Uploaded Form -6 , As the total estimated cost of Rs.46.15 cr. mentione in this certificateFile: Form -6, Engineer .pdf | 1 Dec 2025 |
| Uploaded revised estimated cost certificte clearly mention total revised cost of the project 46.15File: _revised estimated certificate.pdf | 1 Dec 2025 |
| Uploaded letter regarding any new land is not addedFile: letter for no land added.PDF | 7 Oct 2025 |
| 1. Uploaded Modification approved planFile: modified Ablock plan (1).pdf | 7 Oct 2025 |
| 2. Uploaded Modification approved orderFile: modification approved order.pdf | 7 Oct 2025 |
| 1) Uploading Sold and unsold details duly signed by authorized personFile: sold & unsold.PDF | 7 Oct 2025 |
| Uploaded List of allotees duly signed by authorized personFile: list of alotee0001.PDF | 7 Oct 2025 |
| 2) Uploaded Structural stability certificate as per modified planFile: structural Cerificate - REB Grand View -Padushedde Village Bondel,Mangalore.pdf | 7 Oct 2025 |
| 3) Uploaded 2/3 allotee consent formFile: consent letter .pdf | 7 Oct 2025 |
| 4) Uploaded rectified Form-6File: Form -6, Engineer .pdf | 7 Oct 2025 |
| 5) Uploaded fire NOCFile: FIRE NOC.pdf | 7 Oct 2025 |
| Fire NOCFile: Fire NOC .pdf | 2 Jun 2022 |
| Fire NOCFile: FIRE NOC 1 .PDF | 2 Jun 2022 |
| Request letterFile: REQUEST LTR.PDF | 2 Jun 2022 |
| 1) Certified master plan Extract is uploadedFile: certified master plan extract.PDF | 14 May 2022 |
| 2} KSPCB CFE/CEO : Affidavit & application submittedFile: KSPCB Affidavit & ACK,Fee paid recpt.pdf | 14 May 2022 |
| 4) FAR Premium not applicable Letter uploadedFile: FAR.PDF | 14 May 2022 |
| MESCOM NOC UploadedFile: MESCOM NOC.PDF | 14 May 2022 |
| Airport NOC UploadedFile: AIRPORT NOC.pdf | 14 May 2022 |
| 2) Fire noc affidavit and Acknowledgement uploadedFile: Fire affidavit & ACK.pdf | 14 May 2022 |
| 2) Borewell yield certificate uploadedFile: BOREWELL YIELD TEST CERTIFICATE.PDF | 14 May 2022 |
| 3) KSPCB Affidavit with application and fee paid receipt uploadedFile: KSPCB Affidavit & ACK,Fee paid recpt.pdf | 14 May 2022 |
| APPLICATION FOR MASTER PLANFile: certified master plan extract application.PDF | 9 Apr 2022 |
| POLLUTION BOARD- DECLARATIONFile: Polution NOC.PDF | 9 Apr 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| REB PUTTUR HEIGHTS | By pass Road.Puttur,D.k | Ongoing | Mar 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep REB GRAND VIEW on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 8 registered projects within 2 km.
INLAND ASCOTT
INLAND INFRASTRUCTURE DEVELOPERS PRIVATE L
AGRAJA ATLANTIC
AGRAJA MANJUSHREE
POONAM AVENUE
POONAM BUILDERS & YENMARK BUILDERS
SHREE HILL SIDE
GIREESH M SHETTY
LOTUS ROVIN
LOTUS PROPERTIES
Sai Prakash
Titan Developers
See every Dakshina Kannada project, with the district possession charts
Builder: RAI ESTATES AND BUILDERS PRIVATE LIMITED
RAI ESTATES AND BUILDERS PRIVATE LIMITED has 1 registration on RERA Karnataka, including REB GRAND VIEW. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if REB GRAND VIEW is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of REB GRAND VIEW?
The registered promoter entity is RAI ESTATES AND BUILDERS PRIVATE LIMITED, a company as per the filing. Its GSTIN 29AAFCR5310N1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in REB GRAND VIEW?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at REB GRAND VIEW?
The professionals named in the filing: Architect: Suresh Kumar; Engineer: Suresh Kumar; Chartered Accountant: B.Sudesh Kumar Rai. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in REB GRAND VIEW?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback