SHREE HARI PALACE

By HASMUKHBHAI JERAMBHAI SUHAGIYA

RG-MH-76169 · RERA P51600051414 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 65%
32 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SHREE HARI PALACE is a Others project by HASMUKHBHAI JERAMBHAI SUHAGIYA in Nashik, Maharashtra, registered with MahaRERA as P51600051414 on 14 Jun 2023. Possession is promised by 31 Dec 2027. 4 of the 36 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE HARI PALACE
  • TypeOthers
  • Location
    • MERI RASHBIHARI LINK ROAD
    • ADGAON
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600051414
  • ReraGenie IDRG-MH-76169

Builder

  • NameHASMUKHBHAI JERAMBHAI SUHAGIYA
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Current status

11%4 of 36 units booked
40.6%Work done, per cost certificate

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE HARI PALACENA7728836

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 65%.

SHREE HARI PALACE: 32% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor65%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Open Space30

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Jul 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI2345.39
Proposed, not sanctioned2,345 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNASIK
Estimated costRs 5.15 cr
Cost incurredRs 2.09 cr
Work done40.57%
BuildingWingEstimatedIncurred
SHREE HARI PALACENARs 5.15 crRs 2.09 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAYA CONSULTANTS
EngineerASHOK JAMDAR
EngineerAMUL GHINIYA
Chartered AccountantCA SONALI GUJARATHI
Chartered AccountantRANDHIR DWARKADAS GUJARATHI
PartnerRole in project
HASMUKHBHAI JERAMBHAI SUHAGIYA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf15 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf15 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf15 Jul 2026
Withdrawal Update Form 1File: Form-1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form-2.pdf18 Apr 2026
Withdrawal Update Form 3File: Form-3.pdf18 Apr 2026
Form 2A (FY 2025-2026)File: Form-2A.pdf18 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf11 Apr 2026
Form 5 (FY 2025-2026)File: From-5.pdf11 Apr 2026
Withdrawal Update Form 1File: Form-1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form-2.pdf20 Jan 2026
Withdrawal Update Form 3File: Form-3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf10 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf10 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: Form 5.pdf6 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf29 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf29 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf29 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30-09-2023.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-12-2023.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30-09-2023.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31-12-2023.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-09-2023.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-12-2023_.pdf14 Mar 2024
Proforma of Agreement for saleFile: RevisedDraftAgrForSale.pdf2 Jun 2023
PAN CardFile: PAN.pdf27 May 2023
Details of encumbrances concerned to FinanceFile: Encunbrances.pdf27 May 2023
Details of encumbrances concerned to LegalFile: Encunbrances.pdf27 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf27 May 2023
Declaration about Commencement CertificateFile: Format D.pdf25 May 2023
Declaration in FORM BFile: Form-B.pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf25 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf25 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200269664742_For_Asset_Based_Search_25_05_2023_12_49_00_971.pdf25 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf25 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest.pdf25 May 2023
Deviation Report with respect to Allotment letterFile: Deviation AL.pdf25 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf25 May 2023
Other - TechnicalFile: CREDAI.pdf25 May 2023
Layout approvalFile: Layout.pdf13 May 2023
Building plan approvalFile: Building Plan1_compressed.pdf13 May 2023
Building plan approvalFile: BuildingPlan2.pdf13 May 2023
Copy of the legal title reportFile: Legal Title Report.pdf13 May 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf13 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan1_compressed.pdf13 May 2023
Building Plan Approval / NA Order for plotted developmentFile: BuildingPlan2.pdf13 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf13 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER pdf.pdf13 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUNDARAM PALACE APARTMENTP NO 38 AND 3920CompletedDec 2021Oct 2021

How this compares with Nashik

11%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE HARI PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ADGAON4,100+ in Nashik

2 kmSHREE HARI PALACECompleted 47Lapsed / revoked 10Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: HASMUKHBHAI JERAMBHAI SUHAGIYA

HASMUKHBHAI JERAMBHAI SUHAGIYA has 2 registrations on MahaRERA, including SUNDARAM PALACE APARTMENT and SHREE HARI PALACE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREE HARI PALACE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE HARI PALACE?

The registered promoter entity is HASMUKHBHAI JERAMBHAI SUHAGIYA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE HARI PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE HARI PALACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE HARI PALACE?

The professionals named in the filing: Architect: VIJAYA CONSULTANTS; Engineer: ASHOK JAMDAR; Engineer: AMUL GHINIYA; Chartered Accountant: CA SONALI GUJARATHI; Chartered Accountant: RANDHIR DWARKADAS GUJARATHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE HARI PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE HARI PALACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE HARI PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.