Home / Browse projects / Thane, Maharashtra / SHREE GOPINATH HILLS BUILDING 2
SHREE GOPINATH HILLS BUILDING 2
RG-MH-33297 · RERA P51700080650 · Last updated on MahaRERA portal: 9 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GOPINATH HILLS BUILDING 2 is a Residential / Group Housing project by Arun Gopinath Patil in Thane, Maharashtra, registered with MahaRERA as P51700080650 on 23 Jun 2025. Possession is promised by 31 Dec 2027.
At a glance
Project
- NameSHREE GOPINATH HILLS BUILDING 2
- TypeResidential / Group Housing
- Location
- Parsik Nagar
- Kalwa
- Thane (M Corp.)
- Thane
- 400605
- Pincode400605
- RERA no.P51700080650
- ReraGenie IDRG-MH-33297
Builder
- NameArun Gopinath Patil
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jun 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed29 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.
Tower A: 5% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 50% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed214
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Arun Gopinath Patil | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | 10 folds Architects & Consultants |
| Engineer | Associated Structural Engineer LLP |
| Chartered Accountant | Rahul N Gharat & Co |
| Partner | Role in project |
|---|---|
| Arun Gopinath Patil | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Jun 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed29
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Copy of the legal title reportFile: Legal Title Report.pdf | 9 Jun 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B from Bank.pdf | 9 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf | 8 May 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 7 May 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate (Finance).pdf | 5 May 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 5 May 2025 |
| CERSAI detailsFile: Undertaking for not Creartion of Charged on project.pdf | 5 May 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate (Finance).pdf | 5 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Sercured or Unsecured finance.pdf | 5 May 2025 |
| Other - LegalFile: पारसिक_171_Satbara 13-2-23.pdf | 3 May 2025 |
| Building plan approvalFile: Sanctioned Plan new.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SGH B2 Architect Certificate Form 1.pdf | 16 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan new.pdf | 16 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 9 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 9 Apr 2025 |
| Other - TechnicalFile: Annexure- A Declaration Cum Undertaking.pdf | 9 Apr 2025 |
| Proforma of Agreement for saleFile: Agreement For Sale Final.pdf | 9 Apr 2025 |
| Layout approvalFile: Sanctioned Plan new.pdf | 3 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Sanctioned Plan new.pdf | 3 Apr 2025 |
| Other - LegalFile: Self Declaration.pdf | 3 Apr 2025 |
| Declaration in FORM BFile: Form B.pdf | 2 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Patil Reality Signed.pdf | 26 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Details of SoldUnsold Inventory.pdf | 8 Feb 2025 |
| Deviation Report with respect to Allotment letterFile: Allotment Declaration for No deviation.pdf | 8 Feb 2025 |
| Deviation Report with respect to model copy of AgreementFile: Agreement For Sale Declaration for No deviation.pdf | 8 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organization.pdf | 8 Feb 2025 |
| PAN CardFile: Arun Patil PAN.pdf | 7 Feb 2025 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 7 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 7 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 29 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SHREE GOPINATH HILLS BUILDING 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalwa7,600+ in Thane
Birla Taranya - Phase 1
Ekamaya Properties Private Limited
NANDANVAN HOMES-BUILDING B
SHREE KRUPA BUILDERS
MARUTI HOMES
Jay Shree Krishna Enterprises
SHREE SAI CHARAN CHSL
MANDAR CONSTRUCTIONS AND DEVELOPERS LLP
MAPLE ENCLAVE
MANDAR CONSTRUCTION AND DEVELOPERS
AMOL SAUBHAGYA
SUMAN REALTIES
See every Thane project, with the district possession charts
Builder: Arun Gopinath Patil
Arun Gopinath Patil has 1 registration on MahaRERA, including SHREE GOPINATH HILLS BUILDING 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHREE GOPINATH HILLS BUILDING 2 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GOPINATH HILLS BUILDING 2?
The registered promoter entity is Arun Gopinath Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GOPINATH HILLS BUILDING 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GOPINATH HILLS BUILDING 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GOPINATH HILLS BUILDING 2?
The professionals named in the filing: Architect: 10 folds Architects & Consultants; Engineer: Associated Structural Engineer LLP; Chartered Accountant: Rahul N Gharat & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GOPINATH HILLS BUILDING 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback