Home / Browse projects / Thane, Maharashtra / NANDANVAN HOMES-BUILDING B

Registered No litigation declared Others project

NANDANVAN HOMES-BUILDING B

By SHREE KRUPA BUILDERS

RG-MH-28408 · RERA P51700028028 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 13 months
  • 1 extension taken
  • Rs 70.00 crore secured on the land, in favour of AU SMALL FINANCE BANK

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 13 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
74 of 208Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 426 documents Report an error

NANDANVAN HOMES-BUILDING B is a Others project by SHREE KRUPA BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700028028 on 26 Jan 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 13 months from the original filing. 134 of the 208 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameNANDANVAN HOMES-BUILDING B
  • TypeOthers
  • Location
    • OLD MUMBAI PUNE RD
    • PARSIK NAGAR NEAR RELIANCE MARKET
    • Thane (M Corp.)
    • Thane
    • 400605
  • Pincode400605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028028
  • ReraGenie IDRG-MH-28408

Builder

  • NameSHREE KRUPA BUILDERS
  • Entity typePartnership
  • PartnersNANDKUMAR BALKRISHNA SALVI, SANDEEP NANDKUMAR SALVI, NILESH BALKRISHNA SALVI
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2021First promiseFeb 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jan 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 27 Feb 2026)
  • Buildings1 building record
  • Documents filed426 files

Current status

64%134 of 208 units booked
80.4%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA272518820208

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

BUILDING B: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area20,480 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK
Secured amountRs 70.00 crore
CERSAI search filedYes
Declared on1 Aug 2026

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI18523.5
Proposed, not sanctioned3,237 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE WEST BRANCH 400 602
Estimated costRs 101.93 cr
Cost incurredRs 81.95 cr
Work done80.4%
BuildingWingEstimatedIncurred
BUILDING BNARs 101.93 crRs 81.95 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK WESAVKAR AND CO
ArchitectNamita Mhatre
Engineerasc Associated Consultants, Vikas Gokhale
Chartered AccountantAditi A. Joshi & Co.
Chartered AccountantA K O R D & CO
PartnerRole in project
SHREE KRUPA BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18052621005Feb 2026 → Mar 2027

Reason as filed by the promoterThe delay is on account of slow sale and recovery of sale proceeds. The other factors are explained in Self Explanatory Letter

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000198024SUNITA DAYANAND BUBERASHREE KRUPA BUILDERS26/08/2021
SM12500003Amolika BandiwadekarSHREE KRUPA BUILDERS13/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed426

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 426 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 NH B 130426.pdf18 May 2026
Withdrawal Update Form 2File: FORM 2 NH B 110526.pdf18 May 2026
Withdrawal Update Form 3File: Form 3 Nandanvan homes 310326.pdf18 May 2026
Withdrawal Update Form 1File: FORM 1 NHB 300925.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 NHB 311225.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 NHB 311225.pdf11 May 2026
Withdrawal Update Form 2File: Form 2 NHB 30092025.pdf11 May 2026
Withdrawal Update Form 2File: FORM 2 NHB 311225compressed.pdf11 May 2026
Withdrawal Update Form 2File: FORM 2 NHB 311225compressed.pdf11 May 2026
Withdrawal Update Form 3File: SKB Form 3 Sept 25.pdf11 May 2026
Withdrawal Update Form 3File: Form 3 SKBNHB 311225F.pdf11 May 2026
Withdrawal Update Form 3File: Form 3 SKBNHB 311225F.pdf11 May 2026
Withdrawal Update Form 1File: FORM 1 NHB 300625.pdf8 May 2026
Withdrawal Update Form 2File: Form 2 NHB 30062025.pdf8 May 2026
Withdrawal Update Form 3File: Form 3 SKB NH B 300625_compressed.pdf8 May 2026
Layout approvalFile: Without Splitting_Revised Layout_15012024_Blueprint_upto 25th Floor_Compress.pdf27 Nov 2024
Building plan approvalFile: Without Splitting_Revised Layout_15012024_Blueprint_upto 25th Floor_Compress.pdf27 Nov 2024
Copy of Layout Approval (in case of layout)File: Without Splitting_Revised Layout_15012024_Blueprint_upto 25th Floor_Compress.pdf27 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: NH-B CC 15012024.pdf27 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Without Splitting_Revised Layout_15012024_Blueprint_upto 25th Floor_Compress.pdf27 Nov 2024
Declaration about Commencement CertificateFile: Annexure G-Declaration about CC.pdf27 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final signed Form 3.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form -2A 31_3_23.pdf26 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form -2A 31_3_24.pdf26 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2073_Form 2_30_09_2024__18-11-2024.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024_04_15_Architect Certificate-1_April 2023 to March 2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_01_07_2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024_10_15_Architect Certificate-1_July 2024-September 2024.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 form 3 promoter signed_rotated_compressed.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_FY 23-24.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKB - FORM NO2 MARCH 2022.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKB - FORM NO2 DEC2021.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKB - FORM NO2 SEPT2021.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKB - FORM NO2 JUNE 2022.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 Disclosure_compressed.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: Q1 disclosure_compressed.pdf16 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE 23-24_compressed.pdf16 Nov 2024
Details of encumbrancesFile: ENCUMBRANCES.pdf7 Nov 2024
CERSAI detailsFile: ASSETS BASED_rotated.pdf7 Nov 2024
CERSAI detailsFile: DEBTOR BASED_rotated.pdf7 Nov 2024
CERSAI detailsFile: AU Bank 70CR cersai report.pdf7 Nov 2024
Copy of the legal title reportFile: Revised Title Report.pdf11 Oct 2024
Proforma of Agreement for saleFile: AU Sale Agreement Draft_10 oct 24.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKB 30-06-2022.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKB 30-09-2022.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A SKB 31-03-2022.pdf4 Jul 2023
Details of encumbrancesFile: Declaration.pdf28 Jun 2023
Disclosure of sold/ booked inventoryFile: DISCLOURE310323.pdf19 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM NO 5 01042020 to 31032021.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 01042021 to 31032022.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_JUL21-SEP21_compressed.pdf23 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_OCT21-DEC21_compressed.pdf23 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (1st Jan 22 to 15th May 22)_compressed.pdf23 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (16th may 22 to 30th june 22)_compressed.pdf23 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_1.pdf10 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_2.pdf10 Aug 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf27 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Jun 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf12 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf12 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Declaration about Society Formation.pdf8 Feb 2022
Status of ConveyanceFile: Declaration about Conveyance Deed.pdf8 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200228092839_For_Asset_Based_Search_14_01_2022_16_10_48_254.pdf14 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 1.pdf7 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 2.pdf7 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 3.pdf7 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 4.pdf7 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_BUILDING B compressed.pdf20 Jan 2021
Building plan approvalFile: PLINTH CERTIFICATE.pdf16 Jan 2021
Layout approvalFile: Layout Plan_Part_1.pdf16 Jan 2021
Layout approvalFile: Layout Plan_Part_2.pdf16 Jan 2021
Layout approvalFile: Layout Plan_Part_3.pdf16 Jan 2021
Layout approvalFile: Layout Plan_Part_4.pdf16 Jan 2021
Layout approvalFile: Layout Plan_Part_5.pdf16 Jan 2021
Copy of Layout Approval (in case of layout)File: Layout Plan_Part_1.pdf16 Jan 2021
Copy of Layout Approval (in case of layout)File: Layout Plan_Part_2.pdf16 Jan 2021
Copy of Layout Approval (in case of layout)File: Layout Plan_Part_3.pdf16 Jan 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NANDANVAN HOMES-D1D2,D4,C1-115CompletedDec 2017Dec 2017
NANDANVAN HOMES A-1 A2PARSIK NAGAR KALWA THANE136CompletedSep 2015Late, Dec 2015

How this compares with Thane

64%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 13 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANDANVAN HOMES-BUILDING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARSIK NAGAR NEAR RELIANCE MARKET7,600+ in Thane

2 kmNANDANVAN HOMES-BUILDINGCompleted 15Lapsed / revoked 8Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: SHREE KRUPA BUILDERS

SHREE KRUPA BUILDERS has 4 registrations on MahaRERA, including SHREE JAI RESIDENCY and NANDANVAN HOMES-C1. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NANDANVAN HOMES-BUILDING B is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANDANVAN HOMES-BUILDING B?

The registered promoter entity is SHREE KRUPA BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANDANVAN HOMES-BUILDING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NANDANVAN HOMES-BUILDING B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NANDANVAN HOMES-BUILDING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANDANVAN HOMES-BUILDING B?

The professionals named in the filing: Architect: ASHOK WESAVKAR AND CO; Architect: Namita Mhatre; Engineer: asc Associated Consultants, Vikas Gokhale; Chartered Accountant: Aditi A. Joshi & Co.; Chartered Accountant: A K O R D & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDANVAN HOMES-BUILDING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDANVAN HOMES-BUILDING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDANVAN HOMES-BUILDING B to a free account