Home / Browse projects / Palghar, Maharashtra / SHREE GAYATRI CHSL
SHREE GAYATRI CHSL
RG-MH-31350 · RERA P99000079684 · Last updated on MahaRERA portal: 3 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE GAYATRI CHSL is a Residential / Group Housing project by APNA GHAR DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000079684 on 20 Mar 2025. Possession is promised by 31 Mar 2028. 7 of the 56 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE GAYATRI CHSL
- TypeResidential / Group Housing
- Location
- VIRAT NAGAR
- VIRAR WEST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- RERA no.P99000079684
- ReraGenie IDRG-MH-31350
Builder
- NameAPNA GHAR DEVELOPERS
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Mar 2025
- Promised completion31 Mar 2028
- Revised completionNone
- Buildings1 building record
- Documents filed60 files
Current status
Figures as on 3 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE GAYATRI CHSL | NA | 7 | 7 | 56 | 0 | 56 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 15%.
SHREE GAYATRI CHSL: 38% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed80
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHREE GAYATRI CO OPERATIVE HOUSING SOCIETY LTD | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE GAYATRI CHSL | NA | Rs 7.42 cr | Rs 2.97 cr |
| - | NA | Rs 75.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY MALOOAND ASSOCIATESES |
| Engineer | GR CONSULTANT |
| Chartered Accountant | P P BARAPATRE & CO |
| Partner | Role in project |
|---|---|
| APNA GHAR DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Apna ghar 30092025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Apna ghar 30092025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 apna ghar 31122025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 apna ghar 31122025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 apna ghar 31122025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 apna ghar 31032026.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Apnaghar 30092025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Apnaghar 30092025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 apna ghar 31122025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 apna ghar 31122025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 apna ghar 31122025.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Apna ghar 31032026.pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Apna Ghar Form3 30-09-2025 (1).pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Apna Ghar Form3 30-09-2025 (1).pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Apna Ghar Form3 31-12-2025 (1).pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Apna Ghar Form3 31-12-2025 (1).pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Apna Ghar Form3 31-12-2025 (1).pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Apna Ghar Form3 31-03-2026.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 APNA GHAR.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form 1 Apnaghar 30062025.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2 Apnaghar 30062025.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2 Apnaghar 30062025.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 Apnaghar 30062025.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 Apnaghar 30062025.pdf | 18 May 2026 |
| Form 1File: FORM 1 31032025.pdf | 17 Jul 2025 |
| Form 2File: FORM 2 31032025 (2).pdf | 17 Jul 2025 |
| Form 3File: FORM 3 31032025.pdf | 17 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY LIST.pdf | 17 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: APAN GHAR FORM 3 REVISED.pdf | 13 Mar 2025 |
| Declaration in FORM BFile: APNA GHAR NEW FORM B PROMOTER.pdf | 12 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: APNA GHAR BANK FORMAT B REVISED.pdf | 3 Mar 2025 |
| Other - FinanceFile: CLARIFICATION OF RECTIFICATION DEED.pdf | 21 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: APNA GHAR FORMAT A REVISED.pdf | 3 Jan 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: APNA GHAR DISCLOURE BANK DOCUMENT.pdf | 3 Jan 2025 |
| Copy of the legal title reportFile: APNA GHAR LEGAL TITLE REPORT REVISED.pdf | 31 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: APNA GHAR NO ENCUMBRANCE TO FINANCE REVISED.pdf | 31 Dec 2024 |
| CERSAI detailsFile: APNA GHAR NO CERSAI.pdf | 31 Dec 2024 |
| Details of encumbrances concerned to LegalFile: APNA GHAR NO ENCUMBRANCE TO FINANCE REVISED.pdf | 31 Dec 2024 |
| Proforma of Agreement for saleFile: GAYATRI-APARTMENT-24 (1).pdf | 31 Dec 2024 |
| Other - LegalFile: CC MAIL.pdf | 16 Dec 2024 |
| Other - FinanceFile: CC CLARIFICATION.pdf | 16 Dec 2024 |
| Proforma of Allotment letterFile: APNA GHAR ALLOTMENT LETTER REVISED_compressed.pdf | 15 Dec 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS NO DEVIATION SHREE GAYATRI.pdf | 29 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 APNA GHAR.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 APNA GHAR.pdf | 27 Nov 2024 |
| Other - TechnicalFile: APNA GHAR DECLARATION CUM UNDERTAKING.pdf | 29 Oct 2024 |
| Layout approvalFile: layout plan_compressed.pdf | 28 Oct 2024 |
| Building plan approvalFile: blue print_compressed.pdf | 28 Oct 2024 |
| PAN CardFile: Apna Ghar - Pancard.pdf | 28 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: APNA GHAR NON ENCUMBRANCE TO LEGAL.pdf | 28 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: layout plan_compressed.pdf | 28 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMERCEMENT CERTIFICATE_compressed.pdf | 28 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: blue print_compressed.pdf | 28 Oct 2024 |
| Declaration about Commencement CertificateFile: APNA GHAR DECLARATION ABOUT CC.pdf | 28 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: APNA GHAR NO DEVIATION ALLOTEMNET.pdf | 28 Oct 2024 |
| Details of encumbrances concerned to LegalFile: APNA GHAR NON ENCUMBRANCE TO LEGAL.pdf | 28 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: APNA GHAR DISCLOSUR OF INTEREST HITEN.pdf | 28 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: APNA GHAR DISCLOUSER OF MITUL.pdf | 28 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: APNA GHAR DISCLOSUR OF INTEREST PRATHAMESH.pdf | 28 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: APNA GHAR DISCLOUSER OF INTEREST NISAR.pdf | 28 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE GAYATRI CHSL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIRAR WEST3,200+ in Palghar
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: APNA GHAR DEVELOPERS
APNA GHAR DEVELOPERS has 1 registration on MahaRERA, including SHREE GAYATRI CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SHREE GAYATRI CHSL is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE GAYATRI CHSL?
The registered promoter entity is APNA GHAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE GAYATRI CHSL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE GAYATRI CHSL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE GAYATRI CHSL?
The professionals named in the filing: Architect: SANJAY MALOOAND ASSOCIATESES; Engineer: GR CONSULTANT; Chartered Accountant: P P BARAPATRE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE GAYATRI CHSL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback