ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / SHREE GANESH HEIGHTS

Registered No litigation declared Others project

SHREE GANESH HEIGHTS

By GOLDSTAR BUILDERS

RG-MH-30885 · RERA P51600079223 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Basement (if any), 0%
34 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SHREE GANESH HEIGHTS is a Others project by GOLDSTAR BUILDERS in Nashik, Maharashtra, registered with MahaRERA as P51600079223 on 17 Feb 2025. Possession is promised by 31 Mar 2029. 6 of the 40 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE GANESH HEIGHTS
  • TypeOthers
  • Location
    • MUMBAI AGRA HIGHWAY
    • OPP PESHWA HOTEL BALI MANDIR BARDE NAGAR
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • RERA no.P51600079223
  • ReraGenie IDRG-MH-30885

Builder

  • NameGOLDSTAR BUILDERS
  • Entity typePartnership

Key dates

this monthRegisteredFeb 2025PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Feb 2025
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Current status

15%6 of 40 units booked
0.0%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE GANESH HEIGHTSNA7636440

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

SHREE GANESH HEIGHTS: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered1
Open Space40

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area917 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI2770.24
Proposed, not sanctioned2,767 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No 2,Hotel Shivsagar Near KK Wagh College,Adgaon Naka Amrutdham,Panchwati.422003
Estimated costRs 5.89 cr
Work done0.0%
BuildingWingEstimatedIncurred
SHREE GANESH HEIGHTSNARs 5.89 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAPIL THAKKAR
EngineerAKASH SHIVAJI PABALKAR
Chartered AccountantAMIN A SAYYAD
Chartered AccountantSACHIN PATEL
Chartered AccountantNANDKISHOR PATIL
PartnerRole in project
GOLDSTAR BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Shree Ganesh Heights Form 1 23122024.pdf21 Apr 2026
Withdrawal Update Form 2File: Shree Ganesh Heights Form 2 19122024.pdf21 Apr 2026
Withdrawal Update Form 3File: GOLDSTAR BUILDERS RERA form 3.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf21 Apr 2026
Withdrawal Update Form 1File: Shree Ganesh Heights Form 1 23122024.pdf17 Jan 2026
Withdrawal Update Form 2File: Shree Ganesh Heights Form 2 19122024.pdf17 Jan 2026
Withdrawal Update Form 3File: GOLDSTAR BUILDERS RERA form 3.pdf17 Jan 2026
Withdrawal Update Form 1File: Shree Ganesh Heights Form 1 23122024.pdf17 Oct 2025
Withdrawal Update Form 2File: Shree Ganesh Heights Form 2 19122024.pdf17 Oct 2025
Withdrawal Update Form 3File: GOLDSTAR BUILDERS RERA form 3.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-2025.pdf10 Oct 2025
Withdrawal Update Form 1File: Shree Ganesh Heights Form 1 23122024.pdf8 Oct 2025
Withdrawal Update Form 2File: Shree Ganesh Heights Form 2 19122024.pdf8 Oct 2025
Withdrawal Update Form 3File: GOLDSTAR BUILDERS RERA form 3.pdf8 Oct 2025
Withdrawal Update Form 1File: Shree Ganesh Heights Form 1 23122024.pdf26 Sep 2025
Withdrawal Update Form 2File: Shree Ganesh Heights Form 2 19122024.pdf26 Sep 2025
Withdrawal Update Form 3File: 1 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf26 Sep 2025
Other - LegalFile: Shree Ganesh Heights Sale Deed 3924 13 to 25 end.pdf7 Feb 2025
Other - LegalFile: Shree Ganesh Heights 7_12 extract 28_01_2025.pdf7 Feb 2025
Other - LegalFile: Shree Ganesh Heights Sale Deed 5224 14 to 25 end.pdf7 Feb 2025
Other - LegalFile: Shree Ganesh Heights Sale Deed 3924 R to 12.pdf7 Feb 2025
Other - LegalFile: Shree Ganesh Heights Sale Deed 5224 R to 13.pdf7 Feb 2025
Other - TechnicalFile: Shree Ganesh Heights Declairation cum Undertaking 15_01_2025.pdf7 Feb 2025
Layout approvalFile: Shree Ganesh Heights Layout.pdf15 Jan 2025
Layout approvalFile: Shree Ganesh Heights Layout copy.pdf15 Jan 2025
Building plan approvalFile: Shree Ganesh Heights IOD 2mb.pdf15 Jan 2025
PAN CardFile: Saddam Shaikh Pan Card.pdf15 Jan 2025
PAN CardFile: Shaheen Shaikh Pan Card.pdf15 Jan 2025
PAN CardFile: Sameer Qureshi Pan Card.pdf15 Jan 2025
PAN CardFile: Sana Quereshi Pan Card.pdf15 Jan 2025
PAN CardFile: Manoj Shah Pan Card.pdf15 Jan 2025
PAN CardFile: Goldstar Builders PAN Card Firm.pdf15 Jan 2025
Copy of the legal title reportFile: Shree Ganesh Heights Legal Title 02_12_2024 c.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: Shree Ganesh Heights No Encumbrance Finance 24122024.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: Shree Ganesh Heights No Encumbrance Legal 24122024.pdf15 Jan 2025
Copy of Layout Approval (in case of layout)File: Shree Ganesh Heights Layout copy.pdf15 Jan 2025
Copy of Layout Approval (in case of layout)File: Shree Ganesh Heights Layout.pdf15 Jan 2025
Proforma of Allotment letterFile: Shree Ganesh Heights Allotment Letter 26122024.pdf15 Jan 2025
Declaration in FORM BFile: Shree Ganesh Heights Form B 20122024.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Ganesh Heights Form 1 23122024.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Ganesh Heights Form 3c 24122024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Ganesh Heights Form 2 19122024.pdf15 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Shree Ganesh Heights Commencement Certificate 23082024.pdf15 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Shree Ganesh Heights IOD 2mb.pdf15 Jan 2025
Declaration about Commencement CertificateFile: Shree Ganesh Heights Format D 27122024.pdf15 Jan 2025
CERSAI detailsFile: Shree Ganesh Heights CERSAI_Search_Report_200335117302_For_Asset_Based_Search_11_01_2025_115 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Shree Ganesh Heights Format A RERA Bank PLH 24122024.pdf15 Jan 2025
Deviation Report with respect to Allotment letterFile: Shree Ganesh Heights Deviation Allotment 26122024.pdf15 Jan 2025
Details of encumbrances concerned to LegalFile: Shree Ganesh Heights No Encumbrance Finance 24122024.pdf15 Jan 2025
Details of encumbrances concerned to LegalFile: Shree Ganesh Heights No Encumbrance Legal 24122024.pdf15 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Shree Ganesh Heights Deviation Agreement 26122024.pdf15 Jan 2025
Proforma of Agreement for saleFile: Shree Ganesh Heights Agreement Draft.pdf15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Shree Ganesh Heights Disclosure Other Saddam Saikh 05122024.pdf15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Shree Ganesh Heights Disclosure Other Saheen Saikh 05122024.pdf15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Shree Ganesh Heights Disclosure Other Sameer Qureshi 05122024.pdf15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Shree Ganesh Heights Disclosure Other Sana Qureshi 05122024.pdf15 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Shree Ganesh Heights Disclosure Other Manoj Shah 05122024.pdf15 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Shree Ganesh Heights Format A RERA Bank BLH 20122024 bk.pdf15 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: Shree Ganesh Heights No Encumbrance Secured_Unsecured 26122024.pdf15 Jan 2025

How this compares with Nashik

15%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GANESH HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP PESHWA HOTEL BALI MANDIR BARDE NAGAR4,100+ in Nashik

Builder: GOLDSTAR BUILDERS

GOLDSTAR BUILDERS has 1 registration on MahaRERA, including SHREE GANESH HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREE GANESH HEIGHTS is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GANESH HEIGHTS?

The registered promoter entity is GOLDSTAR BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GANESH HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GANESH HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GANESH HEIGHTS?

The professionals named in the filing: Architect: KAPIL THAKKAR; Engineer: AKASH SHIVAJI PABALKAR; Chartered Accountant: AMIN A SAYYAD; Chartered Accountant: SACHIN PATEL; Chartered Accountant: NANDKISHOR PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GANESH HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GANESH HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GANESH HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.