ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SHREE GAJANAN VIHAR IV

Registration lapsed No litigation declared Residential / Group Housing project

SHREE GAJANAN VIHAR IV

By SHRI GAJANAN BUILDER & DEVELOPERS

RG-MH-43742 · RERA P50500054697 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
6 of 11Construction stages donefurthest along: Podiums (if any), 0%
8 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

SHREE GAJANAN VIHAR IV is a Residential / Group Housing project by SHRI GAJANAN BUILDER & DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500054697 on 6 Feb 2024. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 46 of the 54 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE GAJANAN VIHAR IV
  • TypeResidential / Group Housing
  • Location
    • MOUZA PIPLA
    • PIPLA
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • RERA no.P50500054697
  • ReraGenie IDRG-MH-43742

Builder

  • NameSHRI GAJANAN BUILDER & DEVELOPERS
  • Entity typePartnership
  • PartnersRAJENDRA VISHWESHWAR NAKADE, ANIL MAHADEO NASARE, KAMLESH SHRIKRISHNA KHANORKAR, DILIP JADHAORAOJI MATHANKAR
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

7 months past promisethis monthRegisteredFeb 2024PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Feb 2024
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

85%46 of 54 units booked
84.8%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE GAJANAN VIHAR IVNA8854054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHREE GAJANAN VIHAR IV: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,829 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagar Panchayat Besa Pipla
Permissible FSI4097.59
Proposed, not sanctioned4,098 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch301 JAWAHAR NAGAR, MANEWADA ROAD, NAGPUR
Estimated costRs 8.00 cr
Cost incurredRs 6.78 cr
Work done84.75%
BuildingWingEstimatedIncurred
SHREE GAJANAN VIHAR IVNARs 8.00 crRs 6.78 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahesh Padole
EngineerMahesh Padole
Chartered AccountantADITYA GAUTAM Spice Foods
Chartered AccountantAditya Gautam
PartnerRole in project
SHRI GAJANAN BUILDER & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: v4 form 1 q1.pdf13 Jun 2026
Form 2File: v4 form 2 q1.pdf13 Jun 2026
Form 3File: FORM 3 Q1.pdf13 Jun 2026
Disclosure of Sold and Booked InventoryFile: booking.pdf13 Jun 2026
Form 1File: v4 form 1 q2.pdf13 Jun 2026
Form 2File: v4 form 2 q2.pdf13 Jun 2026
Form 3File: FORM 3 Q2.pdf13 Jun 2026
Disclosure of Sold and Booked InventoryFile: booking sept 24.pdf13 Jun 2026
Form 1File: v4 form 1 q3.pdf13 Jun 2026
Form 2File: v4 form 2 q3.pdf13 Jun 2026
Form 3File: FORM 3 Q3.pdf13 Jun 2026
Disclosure of Sold and Booked InventoryFile: booking dec 24.pdf13 Jun 2026
Withdrawal Update Form 1File: Form 1 dec 25.pdf28 Mar 2026
Withdrawal Update Form 2File: Form 2 dec 25.pdf28 Mar 2026
Withdrawal Update Form 3File: Form 3 dec 25.pdf28 Mar 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FORM 1 (1).pdf20 Oct 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 Gautam Associates.pdf20 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: v4 form 1 q1.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: v4 form 1 q2.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: v4 form 1 q3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: v4 form 2 q1.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: v4 form 2 q2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: v4 form 2 q3.pdf22 Feb 2025
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf29 Jan 2024
Other - TechnicalFile: Gmail - REGARDING COMMENCEMENT CERTIFICATE, Building Permission, on KH NO 216, PLOT-LAND M27 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: OLD COMMENCEMENT CERT BUILDING PERMIT_compressed.pdf24 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf4 Jan 2024
Other - TechnicalFile: SALE DEED VIHAR 4_compressed_compressed.pdf4 Jan 2024
Other - TechnicalFile: पिपळा_216_217_1_1_Satbara (1).pdf4 Jan 2024
Other - TechnicalFile: PROPERTY OWNERSHIP DECLARATION041223.pdf4 Jan 2024
Other - TechnicalFile: EMAIL OF NAGAR PACHAYACH SCREENSHOT.pdf4 Jan 2024
Other - TechnicalFile: complaince letter.pdf4 Jan 2024
Building plan approvalFile: Sanction Map 1_compressed.pdf28 Dec 2023
Building plan approvalFile: Sanction Map 2_compressed.pdf28 Dec 2023
Building plan approvalFile: Sanction Map 3_compressed.pdf28 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map 1_compressed.pdf28 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map 2_compressed.pdf28 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanction Map 3_compressed.pdf28 Dec 2023
Other - LegalFile: Declaration about commencement certificate.pdf28 Dec 2023
Proforma of Agreement for saleFile: AGMT DRAFT_compressed-compressed.pdf21 Dec 2023
Layout approvalFile: LAYOUT APPROVAL PLAN_compressed.pdf28 Nov 2023
Layout approvalFile: VIHAR 4 SANCTION BUILDING PLAN_compressed.pdf28 Nov 2023
Building plan approvalFile: VIHAR 4 SANCTION BUILDING PLAN_compressed.pdf28 Nov 2023
PAN CardFile: panCardFirm.pdf28 Nov 2023
Copy of the legal title reportFile: Legal Title Report (Gautam) (1).pdf28 Nov 2023
Copy of the legal title reportFile: SALE DEED VIHAR 4_compressed_compressed.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: NO FINANCIAL ENCUMBRANCE DECLARATION.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERT.pdf28 Nov 2023
Details of encumbrances concerned to LegalFile: NO FINANCIAL ENCUMBRANCE DECLARATION.pdf28 Nov 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERT.pdf28 Nov 2023
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL PLAN_compressed.pdf28 Nov 2023
Copy of Layout Approval (in case of layout)File: VIHAR 4 SANCTION BUILDING PLAN_compressed.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: VIHAR 4 SANCTION BUILDING PLAN_compressed.pdf28 Nov 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERT.pdf28 Nov 2023
Declaration in FORM BFile: From -B.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 (1).pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER.pdf28 Nov 2023
CERSAI detailsFile: CERSAI UNDERTAKING.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gautam Associates.pdf28 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER REAL ESTATE.pdf28 Nov 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf28 Nov 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION ALLOTMENT LETTER.pdf28 Nov 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION AGREEMENT DECLARATION.pdf28 Nov 2023

How this compares with Nagpur

85%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE GAJANAN VIHAR IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIPLA2,800+ in Nagpur

Builder: SHRI GAJANAN BUILDER & DEVELOPERS

SHRI GAJANAN BUILDER & DEVELOPERS has 3 registrations on MahaRERA, including Shree Gajanan Vihar II and SHREE GAJANAN VIHAR III. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that SHREE GAJANAN VIHAR IV shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHREE GAJANAN VIHAR IV is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE GAJANAN VIHAR IV?

The registered promoter entity is SHRI GAJANAN BUILDER & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE GAJANAN VIHAR IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE GAJANAN VIHAR IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE GAJANAN VIHAR IV?

The professionals named in the filing: Architect: Mahesh Padole; Engineer: Mahesh Padole; Chartered Accountant: ADITYA GAUTAM Spice Foods; Chartered Accountant: Aditya Gautam. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE GAJANAN VIHAR IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE GAJANAN VIHAR IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE GAJANAN VIHAR IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.