Home / Browse projects / Raigarh, Maharashtra / SHREE EMPIRE
SHREE EMPIRE
By SHREE BUILDERS & DEVELOPERS
RG-MH-54617 · RERA P52000049125 · Last updated on MahaRERA portal: 26 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE EMPIRE is a Others project by SHREE BUILDERS & DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000049125 on 30 Jan 2023. Possession is promised by 31 Dec 2027. 32 of the 123 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE EMPIRE
- TypeOthers
- Location
- PLOT NO 36 SECTOR 3 PUSHPAK DAPOLI
- PUSHPAK DAPOLI TAL. PANVEL DIST RAIGAD
- Dapoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000049125
- ReraGenie IDRG-MH-54617
Builder
- NameSHREE BUILDERS & DEVELOPERS
- Entity typePartnership
- GSTIN27AELFS3099G1ZI
- PartnersAMOL SUKHADEV JARE, AKSHAY JALINDAR PANSARE
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on30 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed80 files
Current status
Figures as on 26 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE EMPIRE | NA | 12 | 12 | 108 | 15 | 123 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 84%.
SHREE EMPIRE: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 84% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 26 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| UTTAM POSHA PATIL | Pargaon Dungi | Raigarh |
| PRABHAKAR POSHA PATIL | Pargaon Dungi | Raigarh |
| ASHOK POSHA PATIL | Pargaon Dungi | Raigarh |
| JEEVAN POSHA PATIL | Pargaon Dungi | Raigarh |
| SHAILESH EKNATH PATIL | Pargaon Dungi | Raigarh |
| SHASHIKANT EKNATH PATIL | Pargaon Dungi | Raigarh |
| VANITA POSHA PATIL | Pargaon Dungi | Raigarh |
| KRUSHNABAI EKNATH PATIL | Pargaon Dungi | Raigarh |
| SAMRUDDHI SANJEEV BHOIR | Uran | Raigarh |
| SUNITA ARUN BHOIR | Uran | Raigarh |
| KRISHNABAI LAXMAN BHOIR | Uran | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE EMPIRE | NA | Rs 19.50 cr | Rs 7.80 cr |
| - | NA | Rs 50.00 lakh | Rs 20.00 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DISHA ARCHITECT |
| Architect | DHISHA ARCHITECTS |
| Engineer | B S SUKTHANKAR AND ASSOCIATES |
| Engineer | MAHESH JADHAV |
| Chartered Accountant | BHAVESH BHANUSHALI AND ASSOCIATES |
| Chartered Accountant | BHAVESH GOPAL BHANUSHALI |
| Chartered Accountant | VAISHNAVI R MORAJKAR |
| Chartered Accountant | TEJAS METANGALE AND CO |
| Partner | Role in project |
|---|---|
| SHREE BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Shree Empire March 26.pdf | 26 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25 - Pl 36 Sec 7.pdf | 26 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Shree EMPIRE Q3.pdf | 26 Apr 2026 |
| Withdrawal Update Form 1File: Pl 36 Form 1.pdf | 18 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25 - Pl 36 Sec 7.pdf | 18 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Shree EMPIRE Q3.pdf | 18 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Plot 36.pdf | 15 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Jan 2026 |
| Withdrawal Update Form 3File: Form3.pdf | 15 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form I Plot No 36.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 36.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Q2 Shree Empire.pdf | 19 Oct 2024 |
| Form 5 (FY 2023-2024)File: Shree Empire Form 5.pdf | 20 Sep 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 2024 Engi Shree Empire.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sf.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form I Plot No 36.pdf | 21 Jul 2024 |
| Building plan approvalFile: CC 1-1.pdf | 13 Jun 2024 |
| Building plan approvalFile: CC 1-2.pdf | 13 Jun 2024 |
| Building plan approvalFile: CC 1-3.pdf | 13 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC 1-1.pdf | 13 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC 1-2.pdf | 13 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC 1-3.pdf | 13 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 13 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree builders and developers_Shree empire_form 3_Q4_FY 2023-24.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1_36-03_13-04-2024.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023 Form 2 Engi Certi Plot No 36 Shree Empire.pdf | 20 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Shree Empire Form 5 FY 22-23.pdf | 12 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Empire Form 3 Q3 FY 2023-24 signed scan.pdf | 21 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 2023 Form 2 Engi Certi Plot No 36 Shree Empire.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot 36 Q3.pdf | 15 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Plot 36.pdf | 15 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Empire Form 3 Q2 FY 2023-24 Signed scan.pdf | 15 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Plot 36.pdf | 9 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1_36-03_20-05-2023.pdf | 28 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engi Certi Plot No 36 Shree Empire.pdf | 28 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 28 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Certi Plot no 36.pdf | 29 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Certi Plot No 36.pdf | 29 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certi Plot No 36.pdf | 29 Jul 2023 |
| Layout approvalFile: 36 p.pdf | 19 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: 36 p.pdf | 19 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 18 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: AJP Disclosure of Interest in other real estate organisation.pdf | 18 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SAK Disclosure of Interest in other real estate organisation.pdf | 18 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ASJ Disclosure of Interest in other real estate organisation.pdf | 18 Jan 2023 |
| Other - LegalFile: Declaration Ownership.pdf | 18 Jan 2023 |
| Building plan approvalFile: CC Plan Plot 36 1.pdf | 14 Jan 2023 |
| Building plan approvalFile: CC Plan Plot 36 2.pdf | 14 Jan 2023 |
| Building plan approvalFile: CC Plan Plot 36 3.pdf | 14 Jan 2023 |
| PAN CardFile: Kyc Land Owner.pdf | 14 Jan 2023 |
| PAN CardFile: KYC Partners Shree Builders.pdf | 14 Jan 2023 |
| Copy of the legal title reportFile: Final Legal Title Report Plot 36.pdf | 14 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Developer - Encumbrance Legal Finance.pdf | 14 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Land Owner Declaration Legal N Finance.pdf | 14 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Developer - Encumbrance Legal Finance.pdf | 14 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Land Owner Declaration Legal N Finance.pdf | 14 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: CC Plan Plot 36 1.pdf | 14 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: CC Plan Plot 36 2.pdf | 14 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: CC Plan Plot 36 3.pdf | 14 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy Plot 36.pdf | 14 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration CC.pdf | 14 Jan 2023 |
| Declaration in FORM BFile: Form B - Developer.pdf | 14 Jan 2023 |
| Declaration in FORM BFile: Form B - Land Owner.pdf | 14 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 14 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 14 Jan 2023 |
| CERSAI detailsFile: Declaration Cresai.pdf | 14 Jan 2023 |
| CERSAI detailsFile: CERSAI Plot no 36.pdf | 14 Jan 2023 |
| Proforma of Agreement for saleFile: AFS- DRAFT - model pLOT 36.pdf | 14 Jan 2023 |
| Proforma of Allotment letterFile: Model Letter of Allotment - RERA Plot 36.pdf | 14 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Seperate Bank Acc.pdf | 14 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf | 14 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement.pdf | 14 Jan 2023 |
| Other - LegalFile: lease part 1 Plot 36.pdf | 14 Jan 2023 |
| Other - LegalFile: 2 Lease - plot 36.pdf | 14 Jan 2023 |
| Other - LegalFile: Taba Pavati plot no 36.pdf | 14 Jan 2023 |
| Other - LegalFile: Vaat Patra plot no 36.pdf | 14 Jan 2023 |
| Other - LegalFile: Final Order plot no 36.pdf | 14 Jan 2023 |
| Other - LegalFile: Hearship Certificate plot no 36.pdf | 14 Jan 2023 |
| Other - LegalFile: 111 MOU PLOT 36.pdf | 14 Jan 2023 |
| Other - LegalFile: 11 MOU PLOT 36.pdf | 14 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE EMPIRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUSHPAK DAPOLI TAL. PANVEL DIST RAIGAD5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SHREE BUILDERS & DEVELOPERS
SHREE BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including SHREE HEIGHTS and SHREE EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SHREE EMPIRE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE EMPIRE?
The registered promoter entity is SHREE BUILDERS & DEVELOPERS, a partnership as per the filing. Its GSTIN 27AELFS3099G1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE EMPIRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE EMPIRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE EMPIRE?
The professionals named in the filing: Architect: DISHA ARCHITECT; Architect: DHISHA ARCHITECTS; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: MAHESH JADHAV; Chartered Accountant: BHAVESH BHANUSHALI AND ASSOCIATES; Chartered Accountant: BHAVESH GOPAL BHANUSHALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE EMPIRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback