Home / Browse projects / Nashik, Maharashtra / SHREE ATHARVAPARK 2 PHASE 2

Completed No litigation declared Residential / Group Housing project

SHREE ATHARVAPARK 2 PHASE 2

By ATHARVASHREE BUILDMAT PVT LTD

RG-MH-14169 · RERA P51600031143 · Last updated on MahaRERA portal: 9 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
24 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
53 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SHREE ATHARVAPARK 2 PHASE 2 is a Residential / Group Housing project by ATHARVASHREE BUILDMAT PVT LTD in Nashik, Maharashtra, registered with MahaRERA as P51600031143 on 11 Oct 2021. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 6 months from the original filing. 31 of the 84 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHREE ATHARVAPARK 2 PHASE 2
  • TypeResidential / Group Housing
  • Location
    • MAKHMALABAD RING ROAD
    • NEAR SHARAD PAWAR APMC MARKET
    • Nashik
    • 422003
  • Pincode422003
  • RERA no.P51600031143
  • ReraGenie IDRG-MH-14169

Builder

  • NameATHARVASHREE BUILDMAT PVT LTD
  • Entity typeCompany
  • DirectorsYOGESH BEDMUTHA, SUNNY PARAKH, CHINTAN MUTHA, AJIT JAIN, PRASHANT BAGMAR, KIRTI JAIN
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2021First promiseDec 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Oct 2021
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2024)
  • Buildings3 building records
  • Documents filed80 files

Current status

37%31 of 84 units booked
97.0%Work done, per cost certificate

Figures as on 9 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA8728028
WING BNA8728028
WING CNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 9 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

WING A73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered31
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
WING A8715
WING B13720
WING C10717

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,331 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ANKUR SUNIL KASLIWALNandgaonNashik

Approvals and building plan

Sanctioning authorityNashik municipal corporation
Permissible FSI4918.29
Proposed, not sanctioned4,918 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch51 NEEL KAMAL HOUSE, THATTE NAGAR, COLLEGE ROAD , NASHIK 422005
Estimated costRs 11.10 cr
Cost incurredRs 10.77 cr
Work done97.04%
BuildingWingEstimatedIncurred
WING ANARs 4.03 crRs 3.91 cr
WING CNARs 4.03 crRs 3.91 cr
WING BNARs 2.74 crRs 2.66 cr
-NARs 30.00 lakhRs 29.10 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PANKAJ JADHAV
EngineerMILIND RATHI
Chartered AccountantCA CHETAN BUMB
Chartered AccountantBHAVANA LOYA
PartnerRole in project
ATHARVASHREE BUILDMAT PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600027616Dec 2024 → Jun 2025

Reason as filed by the promoterThe project “ SHREE ATHARVAPARK 2 PHASE 2 ” has faced unexpected delays in construction due to factors like labour shortage, inclement weather or logistical challenges etc., therefore I hereby am correcting following data fields by filling an extention for the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full completion.pdf9 Jan 2026
Occupational CertificateFile: Final completion clarification.pdf9 Jan 2026
Withdrawal Update Form 1File: Merged Form 1.pdf14 Oct 2025
Withdrawal Update Form 2File: Form 2 Q1_organized.pdf14 Oct 2025
Withdrawal Update Form 3File: Form 3 PH II Atharvashree Buildmat PVT LTD_0001.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: Building.pdf30 Sep 2025
Form 1File: Form 1.pdf16 Jul 2025
Form 2File: The Atharvashree Buildmat Pvt ltd Engineers Certificate P2.pdf16 Jul 2025
Form 3File: Shree Atharva Park 2 PH 2 Upload.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: Atharvashree Buildmat sold unsold P2.pdf16 Jul 2025
Occupational CertificateFile: Completion.pdf30 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf4 Apr 2025
Declaration in FORM BFile: FORM B KIRTI JAIN-2 phase 2_0001.pdf29 Mar 2025
Declaration in FORM BFile: FORM B ANKUR KASLIWAL-2 phase 2_0001_0001.pdf29 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate Atharvashree Buildmat P2.pdf29 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Atharvashree Buildmat Pvt Ltd P2_0001.pdf29 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf22 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf22 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Merged Q2 24-25_compressed.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT Q3 Merged ph 2_compressed.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shree Atharva park 2 phase 2 Q2_0001_compressed.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Shree Atharva Park2 P2 Q2_compressed.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Shree Atharva Park2 P2 Q3_0001_compressed.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE PARK 2 PH 2_compressed.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 2.pdf21 Mar 2025
Disclosure of sold/ booked inventoryFile: Atharvashree Booking Inventory Park 2 Phase 2_0001.pdf21 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Ph 2.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Annexure A Form 2A PH2 21-22.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Annexure Form 2 A PH2 22-23_0001.pdf21 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Annexure Form 2 A PH2 23-24.pdf21 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Shree Atharva Park 2 Phase2 Format B _0001.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 P2.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate P2P2 Compressed.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1-Phase 2_11zon.pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 2 Engineer-.PDF5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 2 Engineer-.PDF5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2.pdf6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 2.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 2 Q3 FY 23-24.pdf6 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Park 2 Phase 2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Park 2 Ph 2.PDF22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Park 2 Phase 2.pdf22 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ATHARVASHREE PART 2.PDF30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Building.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers_certificate_Building.pdf11 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 phase 2 Building.PDF11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect phase II.PDF15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers_certificate_Q3_Building.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PHASE II 1MB.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Building Q4 21 22.PDF22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Building Q1 22 23.PDF22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Building Q1 22 23.PDF22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers_certificate NEW.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers_certificate_Q1_Building.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers_certificate_Q2_Building.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park 2 phase II Q4 21-22.PDF22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park 2 phase II Q1 22-23.PDF22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park 2 phase II Q2 22-23.PDF22 Feb 2023
OtherFile: Letter of Authorisation.PDF21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Atharvashree Phase-2 RERA Audit FY 21 22.PDF30 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 1.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate PHASE 2.PDF2 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_-Building _Engineers_Certificate__1__1 (1)_compressed.pdf28 Sep 2021
Proforma of Allotment letterFile: SAMPLE SALE FORMAT Phase 2-converted.pdf28 Sep 2021
Layout approvalFile: Building plan layout.pdf21 Sep 2021
Building plan approvalFile: Building plan layout.pdf21 Sep 2021
PAN CardFile: COMPANY PAN-converted.pdf21 Sep 2021
Copy of the legal title reportFile: Legal Title report.PDF21 Sep 2021
Details of encumbrancesFile: Non Encumbrance Certificate.PDF21 Sep 2021
Copy of Layout Approval (in case of layout)File: Building plan layout.pdf21 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Building plan layout.pdf21 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-compressed.pdf21 Sep 2021
Declaration about Commencement CertificateFile: Declaration in form D.PDF21 Sep 2021
Declaration in FORM BFile: Form B- Promoter (Phase 2).PDF21 Sep 2021
Declaration in FORM BFile: Form B- co Promoter (Phase 2).PDF21 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.PDF21 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold (B).PDF21 Sep 2021
Proforma of Allotment letterFile: Proforma of Allotment Letter.PDF21 Sep 2021
OtherFile: Letter of Authorization.PDF21 Sep 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHREE ATHARVA PARK PHASE 1MAKHMALABAD SHIVAR NASHIK29CompletedJun 2021Aug 2020

How this compares with Nashik

37%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 6 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE ATHARVAPARK 2 PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHARAD PAWAR APMC MARKET4,100+ in Nashik

Builder: ATHARVASHREE BUILDMAT PVT LTD

ATHARVASHREE BUILDMAT PVT LTD has 2 registrations on MahaRERA, including SHREE ATHARVAPARK 2 PHASE 2 and SHREE ATHARVAPARK 2 PHASE 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHREE ATHARVAPARK 2 PHASE 2 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE ATHARVAPARK 2 PHASE 2?

The registered promoter entity is ATHARVASHREE BUILDMAT PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE ATHARVAPARK 2 PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE ATHARVAPARK 2 PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE ATHARVAPARK 2 PHASE 2?

The professionals named in the filing: Architect: AR PANKAJ JADHAV; Engineer: MILIND RATHI; Chartered Accountant: CA CHETAN BUMB; Chartered Accountant: BHAVANA LOYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE ATHARVAPARK 2 PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE ATHARVAPARK 2 PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE ATHARVAPARK 2 PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.