SHREE ANANT TOWER BUILDING NO 1
RG-MH-79166 · RERA P99000046995 · Last updated on MahaRERA portal: 22 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE ANANT TOWER BUILDING NO 1 is a Residential / Group Housing project by SHANTINATH ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000046995 on 26 Sep 2022. Possession is promised by 31 Dec 2027. 71 of the 107 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE ANANT TOWER BUILDING NO 1
- TypeResidential / Group Housing
- Location
- FUN FIESTA ROAD
- NILEMORE
- Vasai
- Palghar
- 401203
- Pincode401203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000046995
- ReraGenie IDRG-MH-79166
Builder
- NameSHANTINATH ENTERPRISES
- Entity typePartnership
- PartnersNARESHKUMAR SUNDERLAL JAIN, RAJU UMESH MISHRA
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Sep 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 22 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING D | NA | 16 | 16 | 97 | 10 | 107 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 60%.
WING D: 74% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 22 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MANIK ANANT PATIL | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING D | NA | Rs 20.10 cr | Rs 17.48 cr |
| - | NA | Rs 1.97 cr | Rs 57.07 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJAY WADE AND ASSOCIATES |
| Engineer | NEEL DHOLIA |
| Engineer | Mukesh Kumar |
| Engineer | Pramod Pandey |
| Chartered Accountant | M G SHARMA AND ASSOCIATES |
| Chartered Accountant | CHANDAN CHAUDHARY & ASSOCIATES |
| Chartered Accountant | JKD and Associates |
| Partner | Role in project |
|---|---|
| SHANTINATH ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM-1 Shantinath Enterprises Apr to Jun-26.pdf | 22 Aug 2026 |
| Withdrawal Update Form 2File: FORM-2 Shantinath Enterprises Apr to Jun-26 (1).pdf | 22 Aug 2026 |
| Withdrawal Update Form 3File: FORM-3 Shantinath Enterprises Apr to Jun-26.pdf | 22 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1 Shantinath Jan to Mar-26.pdf | 29 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 Shantinath Jan to Mar-26.pdf | 29 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Shantinath Jan to Mar-26.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Shantinath Jan to Mar-26.pdf | 27 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 Shantinath Jan to Mar-26.pdf | 27 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Shantinath Jan to Mar-26.pdf | 27 Jun 2026 |
| Form 2A (FY 2022-2023)File: Shantinath Enterprises Form-2A FY 22-23.pdf | 23 Apr 2026 |
| Form 2A (FY 2023-2024)File: Shantinath Enterprises Form-2A FY 23-24.pdf | 23 Apr 2026 |
| Form 2A (FY 2024-2025)File: Shantinath Enterprises Form-2A FY 24-25.pdf | 23 Apr 2026 |
| Form 2A (FY 2025-2026)File: Shantinath Enterprises Form-2A FY 25-26.pdf | 23 Apr 2026 |
| Form 1File: Form-1 Shantinath Jul to Sep-24_11zon.pdf | 11 Mar 2026 |
| Form 2File: Form-2 Shantinath Jul to Sep-24_11zon.pdf | 11 Mar 2026 |
| Form 3File: Form-3 Shantinath Jul to Sep-24_11zon.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Sep-24.pdf | 11 Mar 2026 |
| Form 1File: Form-1 Shantinath Ent Apr to Jun-24_11zon.pdf | 11 Mar 2026 |
| Form 2File: Form-2 Shantinath Ent Apr to Jun-24_11zon.pdf | 11 Mar 2026 |
| Form 3File: Form-3 Shantinath Ent Apr to Jun-24_11zon.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Jun-24.pdf | 11 Mar 2026 |
| Form 1File: Form-1 Shantinath Enterprises Jan to Mar-24.pdf | 11 Mar 2026 |
| Form 2File: Form-2 Shantinath Enterprises Jan to Mar-24.pdf | 11 Mar 2026 |
| Form 3File: Form-3 Shantinath Ent Jan to Mar-24 - compressed.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Mar-24.pdf | 11 Mar 2026 |
| Form 1File: Form-1 Shantinath Enterprises Oct to Dec-23.pdf | 11 Mar 2026 |
| Form 2File: Form-2 Shantinath Enterprises Oct to Dec-23.pdf | 11 Mar 2026 |
| Form 3File: Form- 3 Shantinath Ent Oct to Dec-23.pdf | 11 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Dec-23.pdf | 11 Mar 2026 |
| Form 1File: Form-1 Aditya Realtors Oct to dec-25.pdf | 7 Mar 2026 |
| Form 2File: Form-2 Aditya Realtors Oct to Dec-25.pdf | 7 Mar 2026 |
| Form 3File: Form-3 Aditya Realtors Oct to Dec-25_compressed.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold list Dec-25-Aditya_11zon.pdf | 7 Mar 2026 |
| Form 1File: Form-1 shantinath Jul to Sep-25.pdf | 18 Feb 2026 |
| Form 2File: Form-2 shantinath Jul to Sep-25.pdf | 18 Feb 2026 |
| Form 3File: Form-3 Shantinath Jul to Sep-25.pdf | 18 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold list - Sep-25 Shantinath.pdf | 18 Feb 2026 |
| Form 1File: Shantinath Form-1 Oct to Dec-24.pdf | 24 Sep 2025 |
| Form 2File: Shantinath Form-2 Oct to Dec-24.pdf | 24 Sep 2025 |
| Form 3File: Shantinath Form-3 Oct to Dec-24.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: AV INFINITY Sold Unsold List.pdf | 24 Sep 2025 |
| Form 1File: Shantinath Form-1 Jan to Mar-25.pdf | 24 Sep 2025 |
| Form 2File: Shantinath Form-2 Jan to Mar-25.pdf | 24 Sep 2025 |
| Form 3File: Shantinath Form-3 Jan to Mar-25.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: AV INFINITY-31-03-2025 sold unsold list.pdf | 24 Sep 2025 |
| Form 1File: Shantinath Form-1 Apr to Jun-25.pdf | 24 Sep 2025 |
| Form 2File: Shantinath Form-2 Apr to Jun-25.pdf | 24 Sep 2025 |
| Form 3File: Shantinath Form-3 Apr to Jun-25.pdf | 24 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: AV INFINITY-30-06-2025 sold unsold list.pdf | 24 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shantinath Jul to Sep-24_11zon.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shantinath Jul to Sep-24_11zon.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shantinath Jul to Sep-24_11zon.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shantinath Ent Apr to Jun-24_11zon.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shantinath Ent Apr to Jun-24_11zon.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shantinath Ent Apr to Jun-24_11zon.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shantinath Enterprises Jan to Mar-24.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shantinath Enterprises Jan to Mar-24.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shantinath Ent Jan to Mar-24 - compressed.pdf | 21 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D Form-3 Shantinath Enterprises with UDIN_11zon.pdf | 27 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shantinath Enterprises Form-3.pdf | 6 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: AGMT FOR SALE - ANANT TOWER.pdf | 19 Sep 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrances Certificate Legal- Promoter.pdf | 1 Sep 2022 |
| Layout approvalFile: CC and Plan Confirmation.pdf | 24 Aug 2022 |
| Copy of the legal title reportFile: Survey No Clarification.pdf | 24 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: CC and Plan Confirmation.pdf | 24 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC and Plan Confirmation.pdf | 24 Aug 2022 |
| Declaration in FORM BFile: FORM B - SHANTINATH.pdf | 24 Aug 2022 |
| Layout approvalFile: Plot Area Confirmation.pdf | 17 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrances Certificate Legal- Shree Anant Tower Building No 1.pdf | 17 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: Plot Area Confirmation.pdf | 17 Aug 2022 |
| Layout approvalFile: Layout with Heihlight.pdf | 12 Aug 2022 |
| Copy of the legal title reportFile: TITLE WITH FLOW_compressed.pdf | 12 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: Layout with Heihlight.pdf | 12 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate in Format-D.pdf | 12 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 9 Aug 2022 |
| Layout approvalFile: LAYOUT.pdf | 1 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 1 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf | 1 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC CERTIFICATE.pdf | 1 Aug 2022 |
| Building plan approvalFile: BLDG NO 1 - WING D - GROUND AND TYPICAL FLOOR.pdf | 23 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE ANANT TOWER BUILDING NO 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NILEMORE3,200+ in Palghar
Filed coordinates, straight-line distance. 128 registered projects within 2 km.
Sheetal Yash
DGS BUILDERS AND DEVELOPERS
DEEP SKYRISE
DEEP REALCON LLP
VIMAL CLASSIC
OM VIMAL DEVELOPERS
DHANANJAY HILL VIEW
DHANLAXMI DEVELOPERS
NAKSHATRA AURIS
RAJLAXMI JSB REALTY LLP
COMFORT HERITAGE
SAI RYDAM REAL ESTATE DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: SHANTINATH ENTERPRISES
SHANTINATH ENTERPRISES has 3 registrations on MahaRERA, including BHAGWATI VILA WING B and ANANT TOWER E AND F. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if SHREE ANANT TOWER BUILDING NO 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE ANANT TOWER BUILDING NO 1?
The registered promoter entity is SHANTINATH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE ANANT TOWER BUILDING NO 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE ANANT TOWER BUILDING NO 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE ANANT TOWER BUILDING NO 1?
The professionals named in the filing: Architect: AJAY WADE AND ASSOCIATES; Engineer: NEEL DHOLIA; Engineer: Mukesh Kumar; Engineer: Pramod Pandey; Chartered Accountant: M G SHARMA AND ASSOCIATES; Chartered Accountant: CHANDAN CHAUDHARY & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE ANANT TOWER BUILDING NO 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback