Home / Browse projects / Palghar, Maharashtra / SHREE ANANT TOWER BUILDING NO 1

Registered No litigation declared Residential / Group Housing project

SHREE ANANT TOWER BUILDING NO 1

By SHANTINATH ENTERPRISES

RG-MH-79166 · RERA P99000046995 · Last updated on MahaRERA portal: 22 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 60%
36 of 107Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

SHREE ANANT TOWER BUILDING NO 1 is a Residential / Group Housing project by SHANTINATH ENTERPRISES in Palghar, Maharashtra, registered with MahaRERA as P99000046995 on 26 Sep 2022. Possession is promised by 31 Dec 2027. 71 of the 107 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE ANANT TOWER BUILDING NO 1
  • TypeResidential / Group Housing
  • Location
    • FUN FIESTA ROAD
    • NILEMORE
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000046995
  • ReraGenie IDRG-MH-79166

Builder

  • NameSHANTINATH ENTERPRISES
  • Entity typePartnership
  • PartnersNARESHKUMAR SUNDERLAL JAIN, RAJU UMESH MISHRA
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

66%71 of 107 units booked
81.8%Work done, per cost certificate

Figures as on 22 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING DNA16169710107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 60%.

WING D: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 22 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,486 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MANIK ANANT PATILVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI6161.27
Proposed, not sanctioned6,161 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAGRAWAL RESIDENCY, VASAI EAST
Estimated costRs 22.06 cr
Cost incurredRs 18.06 cr
Work done81.83%
BuildingWingEstimatedIncurred
WING DNARs 20.10 crRs 17.48 cr
-NARs 1.97 crRs 57.07 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE AND ASSOCIATES
EngineerNEEL DHOLIA
EngineerMukesh Kumar
EngineerPramod Pandey
Chartered AccountantM G SHARMA AND ASSOCIATES
Chartered AccountantCHANDAN CHAUDHARY & ASSOCIATES
Chartered AccountantJKD and Associates
PartnerRole in project
SHANTINATH ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 Shantinath Enterprises Apr to Jun-26.pdf22 Aug 2026
Withdrawal Update Form 2File: FORM-2 Shantinath Enterprises Apr to Jun-26 (1).pdf22 Aug 2026
Withdrawal Update Form 3File: FORM-3 Shantinath Enterprises Apr to Jun-26.pdf22 Aug 2026
Withdrawal Update Form 1File: FORM 1 Shantinath Jan to Mar-26.pdf29 Jun 2026
Withdrawal Update Form 2File: FORM 2 Shantinath Jan to Mar-26.pdf29 Jun 2026
Withdrawal Update Form 3File: FORM 3 Shantinath Jan to Mar-26.pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1 Shantinath Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 2File: FORM 2 Shantinath Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 3File: FORM 3 Shantinath Jan to Mar-26.pdf27 Jun 2026
Form 2A (FY 2022-2023)File: Shantinath Enterprises Form-2A FY 22-23.pdf23 Apr 2026
Form 2A (FY 2023-2024)File: Shantinath Enterprises Form-2A FY 23-24.pdf23 Apr 2026
Form 2A (FY 2024-2025)File: Shantinath Enterprises Form-2A FY 24-25.pdf23 Apr 2026
Form 2A (FY 2025-2026)File: Shantinath Enterprises Form-2A FY 25-26.pdf23 Apr 2026
Form 1File: Form-1 Shantinath Jul to Sep-24_11zon.pdf11 Mar 2026
Form 2File: Form-2 Shantinath Jul to Sep-24_11zon.pdf11 Mar 2026
Form 3File: Form-3 Shantinath Jul to Sep-24_11zon.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Sep-24.pdf11 Mar 2026
Form 1File: Form-1 Shantinath Ent Apr to Jun-24_11zon.pdf11 Mar 2026
Form 2File: Form-2 Shantinath Ent Apr to Jun-24_11zon.pdf11 Mar 2026
Form 3File: Form-3 Shantinath Ent Apr to Jun-24_11zon.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Jun-24.pdf11 Mar 2026
Form 1File: Form-1 Shantinath Enterprises Jan to Mar-24.pdf11 Mar 2026
Form 2File: Form-2 Shantinath Enterprises Jan to Mar-24.pdf11 Mar 2026
Form 3File: Form-3 Shantinath Ent Jan to Mar-24 - compressed.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Mar-24.pdf11 Mar 2026
Form 1File: Form-1 Shantinath Enterprises Oct to Dec-23.pdf11 Mar 2026
Form 2File: Form-2 Shantinath Enterprises Oct to Dec-23.pdf11 Mar 2026
Form 3File: Form- 3 Shantinath Ent Oct to Dec-23.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Dec-23.pdf11 Mar 2026
Form 1File: Form-1 Aditya Realtors Oct to dec-25.pdf7 Mar 2026
Form 2File: Form-2 Aditya Realtors Oct to Dec-25.pdf7 Mar 2026
Form 3File: Form-3 Aditya Realtors Oct to Dec-25_compressed.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: sold unsold list Dec-25-Aditya_11zon.pdf7 Mar 2026
Form 1File: Form-1 shantinath Jul to Sep-25.pdf18 Feb 2026
Form 2File: Form-2 shantinath Jul to Sep-25.pdf18 Feb 2026
Form 3File: Form-3 Shantinath Jul to Sep-25.pdf18 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold list - Sep-25 Shantinath.pdf18 Feb 2026
Form 1File: Shantinath Form-1 Oct to Dec-24.pdf24 Sep 2025
Form 2File: Shantinath Form-2 Oct to Dec-24.pdf24 Sep 2025
Form 3File: Shantinath Form-3 Oct to Dec-24.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: AV INFINITY Sold Unsold List.pdf24 Sep 2025
Form 1File: Shantinath Form-1 Jan to Mar-25.pdf24 Sep 2025
Form 2File: Shantinath Form-2 Jan to Mar-25.pdf24 Sep 2025
Form 3File: Shantinath Form-3 Jan to Mar-25.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: AV INFINITY-31-03-2025 sold unsold list.pdf24 Sep 2025
Form 1File: Shantinath Form-1 Apr to Jun-25.pdf24 Sep 2025
Form 2File: Shantinath Form-2 Apr to Jun-25.pdf24 Sep 2025
Form 3File: Shantinath Form-3 Apr to Jun-25.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: AV INFINITY-30-06-2025 sold unsold list.pdf24 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shantinath Jul to Sep-24_11zon.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shantinath Jul to Sep-24_11zon.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shantinath Jul to Sep-24_11zon.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shantinath Ent Apr to Jun-24_11zon.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shantinath Ent Apr to Jun-24_11zon.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shantinath Ent Apr to Jun-24_11zon.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Shantinath Enterprises Jan to Mar-24.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Shantinath Enterprises Jan to Mar-24.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Shantinath Ent Jan to Mar-24 - compressed.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Annexure D Form-3 Shantinath Enterprises with UDIN_11zon.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shantinath Enterprises Form-3.pdf6 Dec 2023
Deviation Report with respect to model copy of AgreementFile: AGMT FOR SALE - ANANT TOWER.pdf19 Sep 2022
Details of encumbrances concerned to LegalFile: Encumbrances Certificate Legal- Promoter.pdf1 Sep 2022
Layout approvalFile: CC and Plan Confirmation.pdf24 Aug 2022
Copy of the legal title reportFile: Survey No Clarification.pdf24 Aug 2022
Copy of Layout Approval (in case of layout)File: CC and Plan Confirmation.pdf24 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: CC and Plan Confirmation.pdf24 Aug 2022
Declaration in FORM BFile: FORM B - SHANTINATH.pdf24 Aug 2022
Layout approvalFile: Plot Area Confirmation.pdf17 Aug 2022
Details of encumbrances concerned to LegalFile: Encumbrances Certificate Legal- Shree Anant Tower Building No 1.pdf17 Aug 2022
Copy of Layout Approval (in case of layout)File: Plot Area Confirmation.pdf17 Aug 2022
Layout approvalFile: Layout with Heihlight.pdf12 Aug 2022
Copy of the legal title reportFile: TITLE WITH FLOW_compressed.pdf12 Aug 2022
Copy of Layout Approval (in case of layout)File: Layout with Heihlight.pdf12 Aug 2022
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate in Format-D.pdf12 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf9 Aug 2022
Layout approvalFile: LAYOUT.pdf1 Aug 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf1 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE.pdf1 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RCC CERTIFICATE.pdf1 Aug 2022
Building plan approvalFile: BLDG NO 1 - WING D - GROUND AND TYPICAL FLOOR.pdf23 Jul 2022

How this compares with Palghar

66%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE ANANT TOWER BUILDING NO 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NILEMORE3,200+ in Palghar

2 kmSHREE ANANT TOWER BUILDICompleted 35Lapsed / revoked 25Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: SHANTINATH ENTERPRISES

SHANTINATH ENTERPRISES has 3 registrations on MahaRERA, including BHAGWATI VILA WING B and ANANT TOWER E AND F. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SHREE ANANT TOWER BUILDING NO 1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE ANANT TOWER BUILDING NO 1?

The registered promoter entity is SHANTINATH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE ANANT TOWER BUILDING NO 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE ANANT TOWER BUILDING NO 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE ANANT TOWER BUILDING NO 1?

The professionals named in the filing: Architect: AJAY WADE AND ASSOCIATES; Engineer: NEEL DHOLIA; Engineer: Mukesh Kumar; Engineer: Pramod Pandey; Chartered Accountant: M G SHARMA AND ASSOCIATES; Chartered Accountant: CHANDAN CHAUDHARY & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE ANANT TOWER BUILDING NO 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE ANANT TOWER BUILDING NO 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE ANANT TOWER BUILDING NO 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.