Home / Browse projects / Thane, Maharashtra / SHREE ANAND

Registered No litigation declared Residential / Group Housing project

SHREE ANAND

By SHREE ADESHWAR HOMES

RG-MH-29194 · RERA P51700028020 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 24 months from the original
9 of 11Construction stages donefurthest along: Installation of Lifts, 75%
7 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SHREE ANAND is a Residential / Group Housing project by SHREE ADESHWAR HOMES in Thane, Maharashtra, registered with MahaRERA as P51700028020 on 26 Jan 2021. Possession is promised by 28 Jun 2027. The completion date has moved by 24 months from the original filing. 73 of the 80 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE ANAND
  • TypeResidential / Group Housing
  • Location
    • INDRALOK PHASE 3
    • NEAR RADHA KRISHNA TEMPLE
    • NEW GODBUNDER ROAD
    • NAVGHAR VILLAGE
    • BHAYANDER EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • RERA no.P51700028020
  • ReraGenie IDRG-MH-29194

Builder

  • NameSHREE ADESHWAR HOMES
  • Entity typePartnership
  • GSTIN27AEAFS1451F1ZB
  • PartnersDILIPKUMAR SOHANRAJJI JAIN, VAIBHAV RAVINDRA PATIL, JAYSHREE RAKESH JAIN, PREETI NAVEEN MEHTA, SAVITA DILIPKUMAR JAIN, RAKESH SADANAND MHATRE, SAMATA KUMARPAL JAIN, NAGESH SADANAND MHATRE, VIJAY ANANT PATIL, SUNNY RAKESH MHATRE, HITESH KUMAR SURESH KOTHARI, DINESH GHEWARCHAND JAIN

Key dates

this monthRegisteredJan 2021First promiseJun 2025Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jan 2021
  • Promised completion28 Jun 2027
  • Revised completionRevised to 28 Jun 2027 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed79 files

Current status

91%73 of 80 units booked
96.0%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE ANANDNA1515681280

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 75%.

SHREE ANAND: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed124

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots124
Closed/Covered32
Open Space92

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,470 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025

Approvals and building plan

Sanctioning authorityMIRA BHAYANDAR MAHANAGAR PALIKA
Permissible FSI4978.4
Proposed, not sanctioned4,978 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDER EAST
Estimated costRs 18.00 cr
Cost incurredRs 17.28 cr
Work done96.0%
BuildingWingEstimatedIncurred
SHREE ANANDNARs 18.00 crRs 17.28 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPEX CONSULTANCY SADANANDAN
EngineerSantosh Mata Prasad Mishra
EngineerRAJESH B DUBEY
EngineerSHREEKUMAR SADANANDAN
Chartered AccountantMARP & ASSOCIATES
Chartered AccountantSHWETA JAIN & CO. LLP
Chartered AccountantNAVEEN MEHTA
PartnerRole in project
SHREE ADESHWAR HOMES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31072502272Jun 2025 → Jun 2026

Reason as filed by the promoterBuilding work has been completed 100% but the work for Rotary Car Parking is under progress. Hence OC is awaited.

EA24062621510Jun 2025 → Jun 2027

Reason as filed by the promoterBuilding work has been completed 100% but the work for Rotary Car Parking is under progress and PERT chart uploaded below. Hence OC is awaited.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Jun 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Shree Adeshwar Homes.PDF18 Jul 2026
Withdrawal Update Form 2File: Form 2 Shree Adeshwar Homes.PDF18 Jul 2026
Withdrawal Update Form 3File: HOMES FORM 3 30062026.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate 31032026.PDF24 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate 31032026.PDF24 Jun 2026
Withdrawal Update Form 3File: FORM 3 - 31032026.pdf24 Jun 2026
Form 2A (FY 2025-2026)File: HOMES FORM 2A 25-26.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate.PDF23 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate.PDF23 Mar 2026
Withdrawal Update Form 3File: FORM 3 23062026.pdf23 Mar 2026
Building plan approvalFile: BUILDING PLAN.pdf21 Mar 2026
Building plan approvalFile: LAYOUT AND FLOOR AREA.pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 Architects Certificate.PDF11 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate.PDF11 Feb 2026
Withdrawal Update Form 3File: FORM -3 31-12-25.pdf11 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate (30-09-2025).PDF23 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate (30-09-2025).PDF23 Oct 2025
Withdrawal Update Form 3File: HOMES FORM 3 - 30-9-2025.pdf23 Oct 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate (30-06-2025).PDF29 Sep 2025
Withdrawal Update Form 2File: Form 2 Engineeru0027s Certificate (30-06-2025).PDF29 Sep 2025
Withdrawal Update Form 3File: FORM 3 Homes.pdf29 Sep 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate (30-06-2025).PDF30 Aug 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate (30-06-2025).PDF30 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineeru0027s Certificate (30-06-2025).PDF30 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineeru0027s Certificate (30-06-2025).PDF30 Aug 2025
Withdrawal Update Form 3File: FORM 3 homes.pdf30 Aug 2025
Withdrawal Update Form 3File: FORM 3 homes.pdf30 Aug 2025
Form 2A (FY 2020-2021)File: FORM 2A 31.03.2021.pdf30 Aug 2025
Form 2A (FY 2021-2022)File: FORM 2A 31.03.2022.pdf30 Aug 2025
Form 2A (FY 2022-2023)File: FORM 2A- 31.03.2023.pdf30 Aug 2025
Form 2A (FY 2023-2024)File: FORM 2A- 31.03.2024.pdf30 Aug 2025
Form 2A (FY 2024-2025)File: FORM 2A-31.03.2025.pdf30 Aug 2025
Form 5 (FY 2024-2025)File: Form 5.pdf30 Aug 2025
Commencement certificateFile: homes cc 2023.pdf30 Jul 2025
Declaration and undertaking (Annexure A)File: Shree Adeshwar Homes Annexure A Order 50 (1).pdf30 Jul 2025
Form 1File: form 1.PDF16 Jul 2025
Form 2File: form 2.PDF16 Jul 2025
Form 3File: form 3 shree Adeshwar homes.pdf16 Jul 2025
Disclosure of Sold and Booked InventoryFile: shree adeshwar homes sold-unsold.PDF16 Jul 2025
Form 5 (FY 2023-2024)File: ADESHWAR HOMES FORM 5 23-24.pdf28 Jun 2025
Disclosure of sold/ booked inventoryFile: shree adeshwar homes sold-unsold.pdf19 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ unsold.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf1 Feb 2024
Proforma of Agreement for saleFile: SALE.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Home form 5 21-22.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: homes form 5 2022-23.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE REPORT.pdf16 Jan 2024
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE REPORT.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Format.pdf16 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A SEPARATE BANK.pdf16 Jan 2024
Deviation Report with respect to Allotment letterFile: DEVIATION WITH ALLOTMENT.pdf16 Jan 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION WITH AGREEMENTS.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate .pdf19 Jan 2023
Building plan approvalFile: Shree Adeshwar Homes New Reduce.pdf23 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Shree Adeshwar Homes New Reduce.pdf23 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: NEW CC C.pdf23 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SHREE ANAND.pdf5 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 0001.pdf30 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_compressed.pdf30 May 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf25 May 2022
CERSAI detailsFile: SELF DECLARATION REGARDING CERSAI.pdf25 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21.pdf25 May 2022
OtherFile: LETTER.pdf20 Jan 2021
OtherFile: NEW AFFIDAVIT CUM DECLARATION.pdf20 Jan 2021
Declaration in FORM BFile: NEW AFFIDAVIT CUM DECLARATION FORM-B.pdf11 Jan 2021
OtherFile: AGREEMENT FOR SALE.pdf11 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE FORM-1.pdf6 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jpg2pdf.pdf6 Jan 2021
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION FORM-B.pdf5 Jan 2021
Proforma of Allotment letterFile: LETTER OF ALLOTMENT.pdf5 Jan 2021
Proforma of Allotment letterFile: sale.pdf5 Jan 2021
Layout approvalFile: LAYOUT AND BUILDING PLAN.pdf4 Jan 2021
Building plan approvalFile: LAYOUT AND BUILDING PLAN.pdf4 Jan 2021
PAN CardFile: pan.pdf4 Jan 2021
Copy of the legal title reportFile: TITLE CERTIFIATE.pdf4 Jan 2021
Details of encumbrancesFile: NO ENCUMBRANCE CERTIFICATE.pdf4 Jan 2021
Copy of Layout Approval (in case of layout)File: LAYOUT AND BUILDING PLAN.pdf4 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT AND BUILDING PLAN.pdf4 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: combinepdf_compressed.pdf4 Jan 2021

How this compares with Thane

91%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHREE ANAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDER EAST7,600+ in Thane

Builder: SHREE ADESHWAR HOMES

SHREE ADESHWAR HOMES has 1 registration on MahaRERA, including SHREE ANAND. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHREE ANAND is delayed beyond 28 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE ANAND?

The registered promoter entity is SHREE ADESHWAR HOMES, a partnership as per the filing. Its GSTIN 27AEAFS1451F1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE ANAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE ANAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE ANAND?

The professionals named in the filing: Architect: APEX CONSULTANCY SADANANDAN; Engineer: Santosh Mata Prasad Mishra; Engineer: RAJESH B DUBEY; Engineer: SHREEKUMAR SADANANDAN; Chartered Accountant: MARP & ASSOCIATES; Chartered Accountant: SHWETA JAIN & CO. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE ANAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE ANAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE ANAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.