Shramik Vaibhav
RG-MH-52066 · RERA P52000010831 · Last updated on MahaRERA portal: 7 Dec 2020
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 53 months past the filed date
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Shramik Vaibhav is a Residential / Group Housing project by Ajay Constructions in Raigarh, Maharashtra, registered with MahaRERA as P52000010831 on 31 Aug 2017. Possession was promised by 29 May 2022 and is now 53 months past that date. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameShramik Vaibhav
- TypeResidential / Group Housing
- Location
- Off. National Highway 4
- Shedung
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000010831
- ReraGenie IDRG-MH-52066
Builder
- NameAjay Constructions
- Entity typeOthers
- Named personAjay Pandurang Patil
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion29 May 2022
- Revised completionRevised to 29 May 2022 (originally 31 May 2019)
- Buildings2 building records
- Documents filed66 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building 1 | NA | 5 | 0 | 0 | 0 | 0 |
| Building 2 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 Dec 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.
Building 151%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 4% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Building 251%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 4% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 7 Dec 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 46% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AN ARCH |
| Partner | Role in project |
|---|---|
| Ajay Constructions | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter• The structure for the proposed Project along with brickwork has been completed as per the earlier sanction and Commencement certificate. • The approvals for additional area declared at the time of registration has been granted recently and we applied for obtaining CC as per amended plans. • The Commencement Certificate for amended plans was issued on 13/05/2019 and we have accordingly initiated the balance work. • The amended plans and latest Commencement Certificate has already been uploaded on the Project portal on Authority’s website. • We will be able to finish the balance work along wit
Reason as filed by the promoterThat there was delay in revised approvals for additional area and therefore the construction work could not be carried out for the additional area declared at the time of registration. The revised approvals were accorded in May 2019 and accordingly work of structure was completed in November 2019 and Brickwork plaster was completed by mid of March 2020. The flooring work and finishing work and external infrastructure work has been started post lockdown and the same is in progress. We have informed the Allottees that we will need additional time to complete the remaining work due to limited ava
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: CA_201906.pdf | 7 Dec 2020 |
| Certificates of CA (Form 3)File: CA_201909.pdf | 7 Dec 2020 |
| Certificates of CA (Form 3)File: CA_202003.pdf | 7 Dec 2020 |
| Certificates of CA (Form 3)File: CA_202009.pdf | 7 Dec 2020 |
| Certificates of CA (Form 5)File: CA_201903.pdf | 7 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19_Form-5.pdf | 7 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20_Form-5.pdf | 7 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201903_Ar.pdf | 4 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201906_Ar.pdf | 4 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201909_Ar.PDF | 4 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201912_Ar.pdf | 4 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202003_Ar.PDF | 4 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 202009_Ar.PDF | 4 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER_201906.pdf | 4 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER_201909.pdf | 4 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER_201912.pdf | 4 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER_202003.pdf | 4 Dec 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER_202009.pdf | 4 Dec 2020 |
| Building plan approvalFile: 01.pdf | 21 May 2019 |
| Building plan approvalFile: 02.pdf | 21 May 2019 |
| Building plan approvalFile: 03-1.pdf | 21 May 2019 |
| Building plan approvalFile: 04-1.pdf | 21 May 2019 |
| Building plan approvalFile: 05-1.pdf | 21 May 2019 |
| Building Plan Approval (IOD)File: 01.pdf | 21 May 2019 |
| Building Plan Approval (IOD)File: 02.pdf | 21 May 2019 |
| Building Plan Approval (IOD)File: 03-1.pdf | 21 May 2019 |
| Building Plan Approval (IOD)File: 04-1.pdf | 21 May 2019 |
| Building Plan Approval (IOD)File: 05-1.pdf | 21 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC-1.pdf | 21 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201803_Arch.pdf | 20 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201812_Arch.pdf | 20 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 201903_Arch.pdf | 20 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201803_Er.pdf | 20 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201812_ER.pdf | 20 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 201903_ER.pdf | 20 May 2019 |
| Certificates of CA (Form 3)File: 201803_CA.pdf | 20 May 2019 |
| Certificates of CA (Form 3)File: 201806_CA.pdf | 20 May 2019 |
| Certificates of CA (Form 3)File: 201809_CA.pdf | 20 May 2019 |
| Certificates of CA (Form 3)File: 201812_CA.pdf | 20 May 2019 |
| Certificates of CA (Form 5)File: 201803_Form-5.pdf | 20 May 2019 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 201905_Shramik Vaibhav - Society Registration.pdf | 20 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shramik Vaibhav Ar Certificate - June 2018.pdf | 26 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shramik Vaibhav Ar Certificate - Sep 2018.pdf | 26 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shramik Vaibhav Engineer Certificate - June 2018.pdf | 26 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shramik Vaibhav Engineer Certificate - Sep 2018.pdf | 26 Oct 2018 |
| Copy of the legal title reportFile: Addenda Title Certificate -122.PDF | 2 Aug 2018 |
| Declaration in FORM BFile: Form B- Ajay Construction.pdf | 2 Aug 2018 |
| OtherFile: 4th Floor Plan.pdf | 2 Aug 2018 |
| Certificates of CA (Form 3)File: Shramik_CA_Certificate.pdf | 23 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Shramik Vaibhav - CC.pdf | 7 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Shramik Vaibhav - Plinth Completion Certificate.pdf | 7 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Shramik Vaibhav- Ar Certificate Dec 2017.pdf | 31 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Shramik Vaibhav- Engg Certificate Dec 2017.pdf | 31 Mar 2018 |
| Building plan approvalFile: IOD1-1.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD2-1.pdf | 31 Jul 2017 |
| Layout approvalFile: Layout1.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate.PDF | 31 Jul 2017 |
| Details of encumbrancesFile: Encumbrance- Ajay Cons.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout1.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: IOD1-1.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: IOD2-1.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Affidavite cum Decleration - Ajay Cons.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate for -Ajay Cons-min.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Ajay Constructions-1.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: C A Certificate -AJAY CONSTRUCTION_SHRAMIK VAIBHAV.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: Agreement for Sale-Shramik Vaibhav1.pdf | 31 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Shramik Vaibhav on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shedung5,900+ in Raigarh
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Ajay Constructions
Ajay Constructions has 1 registration on MahaRERA, including Shramik Vaibhav. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Shramik Vaibhav shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Shramik Vaibhav is delayed beyond 29 May 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Shramik Vaibhav?
The registered promoter entity is Ajay Constructions, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Shramik Vaibhav?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Shramik Vaibhav?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Shramik Vaibhav?
The professionals named in the filing: Architect: AN ARCH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Shramik Vaibhav?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.