SHIVYOG
RG-MH-26565 · RERA P52100014794 · Last updated on MahaRERA portal: 1 Jul 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIVYOG is a Residential / Group Housing project by SHIV DEVEOPERS in Pune, Maharashtra, registered with MahaRERA as P52100014794 on 2 Jan 2018. The registration is recorded completed; possession was promised by 30 May 2023.
At a glance
Project
- NameSHIVYOG
- TypeResidential / Group Housing
- Location
- MHETRE PARK ROAD
- MHETRE PARK
- Sasvad (M Cl)
- Purandhar
- Pune
- 412301
- Pincode412301
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100014794
- ReraGenie IDRG-MH-26565
Builder
- NameSHIV DEVEOPERS
- Entity typePartnership
- PartnersMAHADEO SHANKAR MHETRE, SHASHIKALA MAHADEO MHETRE
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Jan 2018
- Promised completion30 May 2023
- Revised completionNone
- Buildings3 building records
- Documents filed62 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHIVYOG C | NA | 4 | 0 | 0 | 0 | 0 |
| SHIVYOG A | NA | 6 | 0 | 0 | 0 | 0 |
| SHIVYOG B | NA | 4 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 1 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
28 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
SHIVYOG C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SHIVYOG A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SHIVYOG B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr sachin s kudale |
| Engineer | MR SACHIN SADASHIV KUDALE |
| Chartered Accountant | Manish Toshaniwal |
| Partner | Role in project |
|---|---|
| SHIV DEVEOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Nov 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Nov 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 May 2023
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cerficate.pdf | 1 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 1 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a quality assurance.pdf | 1 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure in other rera.pdf | 1 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf | 1 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 all.pdf | 1 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank account details.pdf | 1 Jul 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200270641413_For_Asset_Based_Search_06_06_2023_09_51_15_596.pdf | 6 Jun 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: form 4 mhetre sachin.pdf | 6 Jun 2023 |
| Declaration in FORM BFile: form B.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc certificate.pdf | 29 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: fotm 2A.pdf | 29 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: eng cer.pdf | 29 May 2023 |
| Disclosure of sold/ booked inventoryFile: sold invt.pdf | 29 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA FORM 5 21-22.pdf | 29 May 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: complition cert.pdf | 29 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: form A bank.pdf | 29 May 2023 |
| Details of encumbrances concerned to FinanceFile: RERA Legal.pdf | 28 Jan 2023 |
| Details of encumbrances concerned to LegalFile: RERA Legal.pdf | 28 Jan 2023 |
| Deviation Report with respect to Allotment letterFile: RERA NO DEVIATION Allotment LETTER.pdf | 28 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: RERA NO DEVIATION TO MODEL Copy Of Aggrement.pdf | 28 Jan 2023 |
| Building plan approvalFile: HPSCANNER0707_11zon.pdf | 17 Nov 2021 |
| Building plan approvalFile: HPSCANNER0706_11zon.pdf | 17 Nov 2021 |
| Building Plan Approval (IOD)File: HPSCANNER0707_11zon.pdf | 17 Nov 2021 |
| Building Plan Approval (IOD)File: HPSCANNER0706_11zon.pdf | 17 Nov 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: SRR_21102501130_11zon.pdf | 17 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch letter 1 april 2019 to 31 march 2020.pdf | 25 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch letter 1 april 2020 to 31 march 2021.pdf | 25 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch letter april 2021 to july 2021.pdf | 25 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer letter april 2019 to march 2020.pdf | 25 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer letter april 2020 to march 2021.pdf | 25 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer letter april 2021 to june 2021.pdf | 25 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA form 5 april 2019 to march 2020 shivyoj.pdf | 25 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA form 5 april 2020 march 2021.pdf | 25 Aug 2021 |
| Declaration about Commencement CertificateFile: commencement certificate shivyog.pdf | 13 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 11 augest 2021 shivyoj.pdf | 13 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: sold and booked inventory shivyog.pdf | 13 Aug 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate of C wing 001.pdf | 9 Aug 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate of B wing 001 (1).pdf | 7 Aug 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate of B wing 001 (1).pdf | 7 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER CERTIFICATES 1.pdf | 23 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA MARCH 2019 MARCH_compressed.pdf | 4 Dec 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch letter final (2).pdf | 30 Sep 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS LETTER MARCH 2019.pdf | 30 Sep 2019 |
| Certificates of CA (Form 5)File: CA 2019.pdf | 30 Sep 2019 |
| Building plan approvalFile: BLUE PRINTS PLAN MHETRE.pdf | 22 Jan 2019 |
| Building Plan Approval (IOD)File: BLUE PRINTS PLAN MHETRE.pdf | 22 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW COMMENCEMENT CERTIFICATE.pdf | 22 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: BANDKAM PARVANA OLD.pdf | 26 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: BANDHKAM MUDATWADH PATRA 1.pdf | 26 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: BANDKAM MUDATWAD 2.pdf | 26 Dec 2018 |
| Certificates of CA (Form 5)File: CA FROM NO 5 MARCH 2018.pdf | 26 Dec 2018 |
| Certificates of CA (Form 3)File: CA DOCUMENT.pdf | 14 Dec 2017 |
| Proforma of Allotment letterFile: mhetre kararnama.pdf | 14 Dec 2017 |
| Building plan approvalFile: NAGARPALICA SANCTIONED PLAN.pdf | 18 Nov 2017 |
| Layout approvalFile: LAYOUT PLAN.pdf | 18 Nov 2017 |
| PAN CardFile: SHIV DEVELOPER'S PANCARD.pdf | 18 Nov 2017 |
| Copy of the legal title reportFile: search report-ilovepdf-compressed(1).pdf | 18 Nov 2017 |
| Details of encumbrancesFile: encumbrances.pdf | 18 Nov 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 18 Nov 2017 |
| Building Plan Approval (IOD)File: NAGARPALICA SANCTIONED PLAN.pdf | 18 Nov 2017 |
| Declaration in FORM BFile: form b.pdf | 18 Nov 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep SHIVYOG on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MHETRE PARK13,700+ in Pune
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
Priyvardhini Bildcon
Priyvardhini Bildcon LLP
Wonder County
GREEN COLLIS LLP
Kanishka Grand Plaza
Platinum Lifespace Developers
NARAYAN BAUG
HBCL INFRA
Passport
Urban Realty
Shapoorji Pallonji Treetopia Phase 1
Manjri Horse Breeders' Farm Private Limite
Builder: SHIV DEVEOPERS
SHIV DEVEOPERS has 1 registration on MahaRERA, including SHIVYOG. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHIVYOG is delayed beyond 30 May 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIVYOG?
The registered promoter entity is SHIV DEVEOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIVYOG?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIVYOG?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIVYOG?
The professionals named in the filing: Architect: Mr sachin s kudale; Engineer: MR SACHIN SADASHIV KUDALE; Chartered Accountant: Manish Toshaniwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIVYOG?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.