Home / Browse projects / Aurangabad, Maharashtra / SHIVSAMARTH RESIDENCY
SHIVSAMARTH RESIDENCY
RG-MH-30040 · RERA P51500052807 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIVSAMARTH RESIDENCY is a Residential / Group Housing project by Samarth infra in Aurangabad, Maharashtra, registered with MahaRERA as P51500052807 on 5 Oct 2023. Possession is promised by 30 Aug 2028.
At a glance
Project
- NameSHIVSAMARTH RESIDENCY
- TypeResidential / Group Housing
- Location
- near cambridge school
- chikalthana
- Aurangabad (M Corp.)
- Aurangabad
- 431007
- Pincode431007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500052807
- ReraGenie IDRG-MH-30040
Builder
- NameSamarth infra
- Entity typePartnership
- PartnersVIDHYA GANESH BAGAL, GANESH BHIMRAO KOLKAR, JANARDHAN TULSHIRAM THOMBRE
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2023
- Promised completion30 Aug 2028
- Revised completionNone
- Buildings12 building records
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROWHOUSE NO A73 TO A90 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A91 TO A99 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A55 TO A72 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO B1 TO B7 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A37 TO A54 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A100 TO A117 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A19 TO A36 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A118 TO A135 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A1 TO A18 | NA | 2 | 0 | 0 | 0 | 0 |
| ROWHOUSE NO A136 TO A150 | NA | 2 | 0 | 0 | 0 | 0 |
| A1 BUILDING | NA | 8 | 0 | 0 | 0 | 0 |
| A2 BUILDING | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building12
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 132 construction stages are filed complete across 12 buildings. The stage furthest along is Staircases, at 95%.
ROWHOUSE NO A73 TO A9054%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A91 TO A9954%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A55 TO A7236%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO B1 TO B736%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A37 TO A5415%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A100 TO A11715%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A19 TO A3615%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 30% |
| Podiums (if any) | 0% |
| Plinth | 30% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A118 TO A1359%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A1 TO A180%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
ROWHOUSE NO A136 TO A1500%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A1 BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A2 BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 65% |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 20% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed391
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| ROWHOUSE NO A73 TO A90 | 0 | 36 | 36 |
| ROWHOUSE NO A91 TO A99 | 0 | 18 | 18 |
| ROWHOUSE NO A55 TO A72 | 0 | 36 | 36 |
| ROWHOUSE NO B1 TO B7 | 0 | 14 | 14 |
| ROWHOUSE NO A37 TO A54 | 0 | 36 | 36 |
| ROWHOUSE NO A100 TO A117 | 0 | 36 | 36 |
| ROWHOUSE NO A19 TO A36 | 0 | 36 | 36 |
| ROWHOUSE NO A118 TO A135 | 0 | 36 | 36 |
| ROWHOUSE NO A1 TO A18 | 0 | 36 | 36 |
| ROWHOUSE NO A136 TO A150 | 0 | 36 | 36 |
| A1 BUILDING | 70 | 0 | 70 |
| A2 BUILDING | 1 | 0 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| GANESH BABANRAO BAGAL | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Chartered Accountant | Aditya Charkha & Associates |
| Chartered Accountant | SINGH MUNDADA & ASSO. |
| Partner | Role in project |
|---|---|
| Samarth infra | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Aug 2028
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 JUN 26.pdf | 14 Jul 2026 |
| Form 2File: Form 2 JUN 26.pdf | 14 Jul 2026 |
| Form 3File: Form 3 JUN 26.pdf | 14 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD JUN 26.pdf | 14 Jul 2026 |
| Form 1File: Form-1 Mar 26.pdf | 24 Apr 2026 |
| Form 2File: Form-2 Mar 26.pdf | 24 Apr 2026 |
| Form 3File: Form 3 Mar 26.PDF | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Mar 26.PDF | 24 Apr 2026 |
| Form 1File: Form 1 Dec 25.pdf | 31 Jan 2026 |
| Form 2File: Form 2 Dec 25.pdf | 31 Jan 2026 |
| Form 3File: Form-3 Dec 25.pdf | 31 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Dec-25.pdf | 31 Jan 2026 |
| Form 1File: 1 Form 1 Sep 25.pdf | 1 Dec 2025 |
| Form 2File: 2 Form 2 Sep 25.pdf | 1 Dec 2025 |
| Form 3File: 3 From 3 Sep 25 (O).pdf | 1 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Sold Sep 25.pdf | 1 Dec 2025 |
| Form 1File: 1 Form 1 Jun 25.pdf | 12 Nov 2025 |
| Form 2File: 2 Form 2 Jun 25.pdf | 12 Nov 2025 |
| Form 3File: 3 Form-3 Jun 25.pdf | 12 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Sold Jun 25.pdf | 12 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 8 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Mar 25_11zon.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 Mar 25_11zon.pdf | 9 May 2025 |
| Form 1File: 1 Form 1 Mar 25.pdf | 9 May 2025 |
| Form 2File: 2 Form 2 Mar 25.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Samrath Infra June 2024.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Form 3 Sep 2024_compressed.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certi Form 3 Dec 2024_compressed.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert from 1 Q 1_June 2024.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Form 1 Sep 2024_compressed.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Form 1 Dec 2024_compressed.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert form June .pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert form Sep.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert form Dec 2024.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA From 5.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert.pdf | 7 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INV_0001.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate_compressed.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR cert.pdf | 14 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: en cert.pdf | 14 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca form3.pdf | 14 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Gmail - 04 SANTION BP POROPSAL 24082023.pdf | 11 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE-3_compressed.pdf | 24 Aug 2023 |
| Declaration about Commencement CertificateFile: Scan_0001.pdf | 23 Aug 2023 |
| Copy of the legal title reportFile: SEARCH REPORT - GAT NO 377 CHIKALTHANA - SAMARTH INFRA_compressed.pdf | 8 Aug 2023 |
| Layout approvalFile: 09-06-2023 TAHSILDAR 42-B.pdf | 7 Aug 2023 |
| Building plan approvalFile: 1_compressed (1).pdf | 7 Aug 2023 |
| Building plan approvalFile: 2_compressed.pdf | 7 Aug 2023 |
| Building plan approvalFile: 2A_compressed.pdf | 7 Aug 2023 |
| Building plan approvalFile: 3.pdf | 7 Aug 2023 |
| Building plan approvalFile: 4.pdf | 7 Aug 2023 |
| Building plan approvalFile: 5.pdf | 7 Aug 2023 |
| Building plan approvalFile: 6.pdf | 7 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: 09-06-2023 TAHSILDAR 42-B.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_compressed (1).pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2A_compressed.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 7 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COVERING LATTER.pdf | 7 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-SAMARTH INFRA (2)_compressed.pdf | 7 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES_0001.pdf | 6 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: ENCU LEGAL_0001.pdf | 6 Aug 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES_0001.pdf | 6 Aug 2023 |
| Details of encumbrances concerned to LegalFile: ENCU LEGAL_0001.pdf | 6 Aug 2023 |
| Declaration in FORM BFile: FORM B_0001 (1) (1) (1).pdf | 6 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (1).pdf | 6 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEX A AMOL_0001.pdf | 6 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEX A VIDHYA_0001.pdf | 6 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANEEX A KOLKAR_0001.pdf | 6 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEX A JANA_0001.pdf | 6 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPRATE BANK ACC_0001 (1).pdf | 6 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: DEVI ALLOTMENT_0001.pdf | 6 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVI AGGREEMENT_0001.pdf | 6 Aug 2023 |
| Proforma of Agreement for saleFile: Agreement for sale.pdf | 5 Aug 2023 |
| Proforma of Allotment letterFile: allotment latter.pdf | 5 Aug 2023 |
| PAN CardFile: firm pan card.pdf | 4 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHIVSAMARTH RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near chikalthana1,400+ in Aurangabad
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
PMAY U Sundarwadi 10
Aurathrone Infra
PMAY U Sundarwadi 9
Aurathrone Infra
SECTOR 41
MANISH RAMNIRANJAN AGRAWAL AND AMITABH CHA
AURA SQUARE - KALYAN HEIGHTS
KALYAN HEIGHTS
URBAN AMBITION
MANISH RAMNIRANJAN AGRAWAL
Hrim Ssky City Phase V
Ashok Baheti
See every Aurangabad project, with the district possession charts
Builder: Samarth infra
SAMARTH INFRA has 2 registrations on MahaRERA, including IRIS HEIGHTS and SHIVSAMARTH RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if SHIVSAMARTH RESIDENCY is delayed beyond 30 Aug 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIVSAMARTH RESIDENCY?
The registered promoter entity is Samarth infra, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIVSAMARTH RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIVSAMARTH RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIVSAMARTH RESIDENCY?
The professionals named in the filing: Chartered Accountant: Aditya Charkha & Associates; Chartered Accountant: SINGH MUNDADA & ASSO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIVSAMARTH RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback