SHIVAM GREENCOURT
By SHIVAM DEVELOPERS PVT. LTD.
RG-MH-09014 · RERA P52100010035 · Last updated on MahaRERA portal: 13 Mar 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHIVAM GREENCOURT is a Residential / Group Housing project by SHIVAM DEVELOPERS PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100010035 on 23 Aug 2017. The registration is recorded completed; possession was promised by 30 Oct 2021.
At a glance
Project
- NameSHIVAM GREENCOURT
- TypeResidential / Group Housing
- Location
- Chakan Ambethan Road
- Mahalunge
- Khed
- Pune
- 410501
- Pincode410501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100010035
- ReraGenie IDRG-MH-09014
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Aug 2017
- Promised completion30 Oct 2021
- Revised completionNone
- Buildings1 building record
- Documents filed131 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 0%.
A: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed144
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SUNIL HARI BHALERAO | Andheri | Mumbai Suburban |
| DILIP HARI BHALERAO | Badlapur (M Cl) | Thane |
| PANDURANG NAMDEO BHALERAO | Mahalunge | Pune |
| SMT SUNANDA HARI BHALERAO | Andheri | Mumbai Suburban |
| SMT JYOTI ANIL BHALERAO | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Architect Pradeep Kosumbkar Ms iDea & iMages |
| Engineer | G.A.BHILARE & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHIVAM DEVELOPERS PVT. LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Jun 2021
Documents filed131
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5 SDPL GC.pdf | 13 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 GC.pdf | 23 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_GC_2023-24.pdf | 11 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Green ourt -form 2A-30-09-24.pdf | 13 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC Form 2 300924_0001.pdf | 12 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-FORM2-JUN 2024.pdf | 27 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GC-FORM2A-JUN 2024.pdf | 27 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: GC-SU-JUN2024.pdf | 27 Jul 2024 |
| Certificates of CA (Form 3)File: GC-FORM3-JUN 2024.pdf | 27 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-F2-MAR 24.pdf | 24 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GC-F2A-MAR 24.pdf | 24 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GC-F2A-MAR 24.pdf | 24 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: S-U-GC-MAR 2024_compressed.pdf | 13 Apr 2024 |
| Certificates of CA (Form 3)File: GC-FORM3-MARHCH 2024.pdf | 13 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-F2-DEC 23.pdf | 21 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GC-F2A-DEC 23.pdf | 21 Feb 2024 |
| Certificates of CA (Form 3)File: GC-F3-DEC 23.pdf | 21 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-F2-SEP 2023.pdf | 30 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GC-F2A-SEP 2023.pdf | 30 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GC-F5-FY 2022-2023.pdf | 30 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: GC-SOLD UNSOLD- SEP 23_compressed.pdf | 20 Nov 2023 |
| Certificates of CA (Form 3)File: GC-F3-SEP 2023.pdf | 20 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: S-U-GC-JUN 23_compressed.pdf | 4 Aug 2023 |
| Certificates of CA (Form 3)File: GC-F3-JUN 23.pdf | 3 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-F2-JUN23.pdf | 19 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GC-F2A-JUN 23.pdf | 19 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-F2-MARCH 2023.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GC-F2-MARCH 2023.pdf | 20 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GC-F2A-MARCH 2023.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: S-U-GC- dec 2022.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: S-U-GC-MARCH 2023.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: GC-FORM 3-MARCH 2023.pdf | 20 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-FORM2-DEC22.pdf | 19 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GC-FORM2A-DEC22.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: GC - FORM 3 - DEC22.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: GC FORM 3 DEC22.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: GC FORM3 SEP 2022.pdf | 16 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-FORM2-SEP22.pdf | 27 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GC-FORM2A-SEP22.pdf | 27 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: GC-SOLDUNSOLD-JUN22.pdf | 27 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: GC-SOLDUNSOLD-SEP22.pdf | 27 Dec 2022 |
| Certificates of CA (Form 3)File: GC FORM 3 JUN 2022.pdf | 19 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GC-FORM5-APR21-MAR22.pdf | 15 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC-F2-JUN 22_compressed (1).pdf | 23 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GC-F2A-JUN 22.pdf | 23 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F2-GC-MARCH 22.pdf | 21 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F2A-GC-MARCH 22.pdf | 21 Jul 2022 |
| Certificates of CA (Form 3)File: form 3 green court - march 22-compressed_compressed_compressed.pdf | 15 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: GC sold unsold march 22_compressed.pdf | 1 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC F2 JUN 21 (1).pdf | 10 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC F2 SEP 21 (1).pdf | 10 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC F2 DEC 21 (1).pdf | 10 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GC F2A JUN 21 (1).pdf | 10 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GC F2A SEP 21 (1).pdf | 10 Mar 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GC F2A DEC 21-compressed.pdf | 10 Mar 2022 |
| Certificates of CA (Form 3)File: Form3-GreenCourt-2021Jun30.pdf | 10 Mar 2022 |
| Certificates of CA (Form 3)File: Form3-GreenCourt-2021Sep30.pdf | 10 Mar 2022 |
| Certificates of CA (Form 3)File: Form3-GreenCourt-2021Dec31.pdf | 10 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 -19-20.pdf | 10 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 -20-21.pdf | 10 Mar 2022 |
| Declaration about Commencement CertificateFile: declaration 175 GC.pdf | 29 Jun 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: GC Form 4.pdf | 12 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: gc f1 mar 21.pdf | 11 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: gc f2 31 mar 21.pdf | 11 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: gc f2a 31 mar 21.pdf | 11 Jun 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: gc f1 mar 21.pdf | 11 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE-min.pdf | 4 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Form 2 Greencourt 31-12-2020-min.pdf | 4 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A QUALITY ASSURANCE CERTIFICATE GREEN COURT 31-12-2020-min.pdf | 4 Jun 2021 |
| Certificates of CA (Form 3)File: Form3-ShivamGreenCourt dec -2020-min.pdf | 4 Jun 2021 |
| Certificates of CA (Form 3)File: Form3-Green Court-dt2021Mar31-min.pdf | 4 Jun 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Shivam Green Court Final Completion certificate_compressed.pdf | 15 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GC F1 31-3-2020_compressed.pdf | 11 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GC F1 30-6-2020_compressed.pdf | 11 Feb 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GC F1 30-9-2020_compressed.pdf | 11 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC F2 31-3-2020.pdf | 11 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC F2 30-6-2020.pdf | 11 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GC F2 30-9-2020.pdf | 11 Feb 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GC F2A 31-3-2020.pdf | 11 Feb 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: GC F2A 30-9-2020.pdf | 11 Feb 2021 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHIVAM CASA | Nr Shivam Majestica Choudhary Park Area Wakad Pune 411 057 | 8 | Completed | Oct 2015 | Late, Oct 2016 |
| SHIVAM NITYA | NR SHIVAM MAJESTICA CHOUDHARY PARK AREA WAKAD PUNE-411057 | 8 | Completed | Jan 2015 | Late, Jul 2015 |
| SHIVAM NITYA | NR SHIVAM MAJESTICA CHOUDHARY PARK AREA WAKAD PUNE-411057 | 8 | Completed | Jan 2015 | Late, Jul 2015 |
| GHANWAT PLAZA | Chakan Talegaon Road Nanekar Wadi Chakan- 410 | 111 | Completed | Sep 2013 | Late, Aug 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 131 filed documents as one ZIP, foldered, with a manifest
Keep SHIVAM GREENCOURT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mahalunge13,700+ in Pune
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: SHIVAM DEVELOPERS PVT. LTD.
SHIVAM DEVELOPERS PVT. LTD. has 3 registrations on MahaRERA, including SHIVAM GREENCOURT and GHANWAT SQUARE. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHIVAM GREENCOURT is delayed beyond 30 Oct 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHIVAM GREENCOURT?
The registered promoter entity is SHIVAM DEVELOPERS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHIVAM GREENCOURT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHIVAM GREENCOURT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHIVAM GREENCOURT?
The professionals named in the filing: Architect: Architect Pradeep Kosumbkar Ms iDea & iMages; Engineer: G.A.BHILARE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHIVAM GREENCOURT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback