ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / SHIV GANESH

Registration lapsed No litigation declared Residential / Group Housing project

SHIV GANESH

By JSM REALTORS PRIVIATE LIMITED

RG-MH-41606 · RERA P52000049471 · Last updated on MahaRERA portal: 23 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

SHIV GANESH is a Residential / Group Housing project by JSM REALTORS PRIVIATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000049471 on 15 Feb 2023. Possession was promised by 15 Jul 2025 and is now 15 months past that date. The completion date has moved by 4 months from the original filing.

At a glance

Project

  • NameSHIV GANESH
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 54-55
    • SECTOR 8
    • NEW PANVEL
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000049471
  • ReraGenie IDRG-MH-41606

Builder

  • NameJSM REALTORS PRIVIATE LIMITED
  • Entity typeCompany
  • Managing DirectorMANESH SRICHAND BIJLANI
  • DirectorsSANJAY TANSUKHDAS PANJWANI, DEEPAK TANSUKHDAS PANJWANI
  • Declared earlier projects1 →

Key dates

15 months past promisethis monthRegisteredFeb 2023First promiseMar 2025Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Feb 2023
  • Promised completion15 Jul 2025
  • Revised completionRevised to 15 Jul 2025 (originally 15 Mar 2025)
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SIHV GANESHNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SIHV GANESH: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered11
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area755 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1300.24
Proposed, not sanctioned1,300 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 9,10,11 BALAJI BHAVAN, SECTOR 11, CBD BELAPUR, NAVI MUMBAI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOYUZ TALIB ARCHITECTS
EngineerEPICONS CONSULTANTS PVT LTD
Chartered AccountantZ A BOOTWALA AND CO
PartnerRole in project
JSM REALTORS PRIVIATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000027812Mar 2025 → Jul 2025

Reason as filed by the promoterDue to Slow selling of flats, shortage of funds, project got delayed. Our Project work is 100% completed and we have obtain all NOC required for Occupation Certificate, we have attached all copies of NOC and actual pictures. Occupation Certificate expected soon. Once Occupation Certificate received we will hand over the possession to the Flat Owners.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B, Affidavit cum declaration.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1, Architects certificate.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2, Engineers Certificate.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Un Sold Unit.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf17 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE SG.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UNIT.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 2024-10-08.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE LIST OF SG.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 2024-07-05 (1).pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE SG.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD UNSOLD UNIT.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM -1(SHIV GANESH).pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Shiv Ganesh.pdf19 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - Shiv Ganesh - FY 22-23.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SG Form -1 Architect's Certificate 2023-12-31.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 - CA Certificate.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: HALF YEARLY REPORT SHIV GANESH.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unit.pdf22 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unit, Shiv Ganesh.pdf20 Jul 2023
Declaration in FORM BFile: FORM B SHIV GANESH.pdf8 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259445300_For_Asset_Based_Search_03_02_2023_17_41_54_652.pdf4 Feb 2023
Proforma of Agreement for saleFile: agreement for sale SHIV GANESH.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure, JSM Realtors.pdf18 Jan 2023
PAN CardFile: 1 PAN Card.pdf2 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200259444358_For_Asset_Based_Search_03_02_2023_17_37_20_761.pdf13 Dec 2022
Copy of the legal title reportFile: SHIV GNAESH, TITLE REPORT NEW.pdf24 Nov 2022
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shiv ganesh ca certificate F.pdf14 Nov 2022
Layout approvalFile: CC Master Floor Plan SHIV GANESH.pdf5 Nov 2022
Copy of Layout Approval (in case of layout)File: CC Master Floor Plan SHIV GANESH.pdf5 Nov 2022
Proforma of Allotment letterFile: Alotment Letter, Shiv Ganesh.pdf5 Nov 2022
Building plan approvalFile: CC Master Floor Plan SHIV GANESH.pdf4 Nov 2022
Details of encumbrances concerned to FinanceFile: Shiv Ganesh, Encumbrance.pdf4 Nov 2022
Details of encumbrances concerned to LegalFile: Shiv Ganesh, Encumbrance.pdf4 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: CC Master Floor Plan SHIV GANESH.pdf4 Nov 2022
Declaration about Commencement CertificateFile: Declaration CC.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers certificate, Shiv Ganesh.pdf4 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A, Declaration Bank Account.pdf4 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation, Allotment.pdf4 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation, Agreement.pdf4 Nov 2022
PAN CardFile: 1 PAN Card.pdf3 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: CC, Shiv Ganesh.pdf3 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-FORM 1.pdf3 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
KRISHNA KAMALP52000047687SECTOR 8, NEW PANVEL, RaigarhNov 2022CompletedMar 2025Jun 2024

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 4 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV GANESH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR 8, NEW PANVEL5,900+ in Raigarh

2 kmSHIV GANESHCompleted 10Lapsed / revoked 9Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: JSM REALTORS PRIVIATE LIMITED

JSM REALTORS PRIVIATE LIMITED has 1 registration on MahaRERA, including SHIV GANESH. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that SHIV GANESH shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SHIV GANESH is delayed beyond 15 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV GANESH?

The registered promoter entity is JSM REALTORS PRIVIATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV GANESH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV GANESH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV GANESH?

The professionals named in the filing: Architect: SOYUZ TALIB ARCHITECTS; Engineer: EPICONS CONSULTANTS PVT LTD; Chartered Accountant: Z A BOOTWALA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV GANESH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV GANESH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV GANESH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.