Home / Browse projects / Raigarh, Maharashtra / Shiv Emerald

Registered No litigation declared Others project

Shiv Emerald

By Shivkrupa Builders & Developers

RG-MH-17863 · RERA P52000056176 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 85%
12 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Shiv Emerald is a Others project by Shivkrupa Builders & Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000056176 on 16 May 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 8 of the 20 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameShiv Emerald
  • TypeOthers
  • Location
    • Sector - 3
    • Karanjade
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000056176
  • ReraGenie IDRG-MH-17863

Builder

  • NameShivkrupa Builders & Developers
  • Entity typePartnership
  • PartnersAbhith Subhakar Kotian, Swarali Dattatray Shinde

Key dates

this monthRegisteredMay 2024First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed62 files

Current status

40%8 of 20 units booked
92.0%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shiv EmeraldNA5420020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

Shiv Emerald: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes45%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI710.64
Proposed, not sanctioned720 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 20, 21,37, 38, SHREE NAND DHAM, SECTOR 11, CBD BELAPUR, NAVI MUMBAI - 400614
Estimated costRs 1.92 cr
Cost incurredRs 1.77 cr
Work done92.0%
BuildingWingEstimatedIncurred
Shiv EmeraldNARs 1.92 crRs 1.77 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerB S Sukthankar & Associate
EngineerKOMAL MAHENDRA PAWAR
Chartered AccountantMs Vidya S Bhure & Co
Chartered AccountantHemant & co
Chartered AccountantMs Singh Ranjan & Co
PartnerRole in project
Shivkrupa Builders & Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02122518484Dec 2025 → Dec 2026

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow.

Litigation declared1

CaseCourtStatus
02/2024Civil Court Senior Division PanvelAwaiting Notice

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Shivkrupa 30-06-2026n.pdf29 Jul 2026
Withdrawal Update Form 2File: FORM 2 Shivkrupa 30-06-2026.pdf29 Jul 2026
Withdrawal Update Form 3File: FORM 3 Shivkrupa 30-06-2026.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 Shivkrupa 31-03-2026.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 Shivkrupa 31-03-2026.pdf27 May 2026
Withdrawal Update Form 3File: Form 3 31-03-26.pdf27 May 2026
Layout approvalFile: PLAN.pdf22 Feb 2026
Building plan approvalFile: PLAN.pdf22 Feb 2026
Withdrawal Update Form 1File: Form 1 31-12-25.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 31-12-25.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2 Shivkrupa 31-12-25.pdf7 Feb 2026
Withdrawal Update Form 2File: FORM 2 Shivkrupa 31-12-25.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 31-12-25 Shivkrupa Builders Developers sign.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 31-12-25 Shivkrupa Builders Developers sign.pdf7 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A Shivkrupa BD signed.pdf30 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf6 Dec 2025
Withdrawal Update Form 1File: Form 1 30-06-25.pdf28 Nov 2025
Withdrawal Update Form 1File: Form 1 30-09-25.pdf28 Nov 2025
Withdrawal Update Form 2File: Form 2 30-06-25.pdf28 Nov 2025
Withdrawal Update Form 2File: Form 2 30-09-25.pdf28 Nov 2025
Withdrawal Update Form 3File: Form 3 30-06-25 Shivkrupa Builders u0026 Developers.pdf28 Nov 2025
Withdrawal Update Form 3File: Form 3 30-09-25 Shivkrupa Builders u0026 Developers.pdf28 Nov 2025
Form 1File: Form 1 Shiv krupa - new.pdf27 Jun 2025
Form 2File: FORM 2 Shiv Krupa.pdf27 Jun 2025
Form 3File: Form 3 31-03-2025 Shiv Krupa.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold shivkrupa.pdf27 Jun 2025
Self-declaration of Quarterly ProgressFile: disc of qpr.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - converted.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - converted.pdf25 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - converted.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-6-2024 SHIVKRUPA - converted.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-9-2024 Shiv Krupa - converted.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sign.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 sign.pdf25 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf23 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Finance- shivkrupa.pdf21 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Legle Shivkrupa.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Finance- shivkrupa.pdf21 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrances Legle Shivkrupa.pdf21 Mar 2024
Other - LegalFile: Partnership Deed.pdf21 Mar 2024
Copy of the legal title reportFile: shivkrupa title report.pdf12 Mar 2024
Proforma of Agreement for saleFile: AFS_Shiv Emerald_Shivkrupa Builders and Developers_06032024.pdf12 Mar 2024
Proforma of Allotment letterFile: Allotment Letter_Shiv Emerald_Shivkrupa Builders and Developers_06032024.pdf12 Mar 2024
Other - LegalFile: Agreement to Lease Shiv Emberald_11zon.pdf12 Mar 2024
Other - LegalFile: Tripartiate Agreement_11zon (1).pdf12 Mar 2024
Other - TechnicalFile: Order No - 50 Shivkrupa (1).pdf12 Mar 2024
Declaration about Commencement CertificateFile: Format D - shivkrupa.pdf11 Mar 2024
Declaration in FORM BFile: Shiv Embrald Form B Notarized.pdf11 Mar 2024
CERSAI detailsFile: Declaration of cersai - shivkrupa.pdf11 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shiv Emerald Form 3_11zon.pdf11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (1).pdf11 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Seperate Bank Account Detail - Shivkrupa.pdf11 Mar 2024
Deviation Report with respect to Allotment letterFile: Shiv embraled Deviation of Allotment Letter.pdf11 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Shiv Embrald Deviation of AFS.pdf11 Mar 2024
Layout approvalFile: Approved Plan.pdf2 Mar 2024
Building plan approvalFile: Approved Plan.pdf2 Mar 2024
PAN CardFile: Shivkrupa Buidlers And Developers Pancard_page-0001.pdf2 Mar 2024
Copy of Layout Approval (in case of layout)File: Approved Plan.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan.pdf2 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Dated old.pdf2 Mar 2024

How this compares with Raigarh

40%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shiv Emerald on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karanjade5,900+ in Raigarh

2 kmShiv EmeraldCompleted 239Lapsed / revoked 73Other 130Dot size: filed unitsN

Filed coordinates, straight-line distance. 442 registered projects within 2 km.

Builder: Shivkrupa Builders & Developers

Shivkrupa Builders & Developers has 1 registration on MahaRERA, including Shiv Emerald. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Shiv Emerald is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shiv Emerald?

The registered promoter entity is Shivkrupa Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shiv Emerald?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shiv Emerald?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shiv Emerald?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: B S Sukthankar & Associate; Engineer: KOMAL MAHENDRA PAWAR; Chartered Accountant: Ms Vidya S Bhure & Co; Chartered Accountant: Hemant & co; Chartered Accountant: Ms Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shiv Emerald?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shiv Emerald. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shiv Emerald to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.