ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / SHIV CRYSTAL

Registered No litigation declared Others project

SHIV CRYSTAL

By JAIDEEP CONSTRUCTION

RG-MH-61250 · RERA P51600054495 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jul 2030Possession promisedmoved 4 months from the original
14 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 95%
37 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

SHIV CRYSTAL is a Others project by JAIDEEP CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600054495 on 25 Jan 2024. Possession is promised by 31 Jul 2030. The completion date has moved by 4 months from the original filing. 18 of the 55 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete.

At a glance

Project

  • NameSHIV CRYSTAL
  • TypeOthers
  • Location
    • NASHIK ROAD
    • SR NO 190/2 NEAR BHAGWAT PLAZA SAMANGAON ROAD SINNAR PHATA NASHIK ROAD
    • Nashik
    • 422101
  • Pincode422101
  • RERA no.P51600054495
  • ReraGenie IDRG-MH-61250

Builder

  • NameJAIDEEP CONSTRUCTION
  • Entity typePartnership
  • PartnersPRAVIN VASANTRAO DARADE, SANDEEP SANTU CHAKNE, GIRISH JAIPRAKASH DARADE, KAILAS KASHINATH DHATRAK
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2024First promiseMar 2030Revised toJul 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Jul 2030
  • Revised completionRevised to 31 Jul 2030 (originally 31 Mar 2030)
  • Buildings3 building records
  • Documents filed80 files

Current status

33%18 of 55 units booked
64.9%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIV CRYSTAL A WINGNA3321315
SHIV CRYSTAL B WINGNA33404
SHIV CRYSTAL C WINGNA121236036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

SHIV CRYSTAL A WING45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIV CRYSTAL B WING43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SHIV CRYSTAL C WING71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes45%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes60%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered49
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
SHIV CRYSTAL A WING909
SHIV CRYSTAL B WING16016
SHIV CRYSTAL C WING241236

Land and ownership37

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners37
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Oct 2024
LandownerVillageDistrict
Sulochana Pandurang BhagwatNashikNashik
Sudam Pandurang BhagwatNashikNashik
Surekha Sudam BhagwatNashikNashik
Sidhesh Sudam BhagwatNashikNashik
Darshan Sudam BhagwatNashikNashik
Shobha Manohar DhageNashikNashik
Sunanda Balasaheb BhagwatNashikNashik
Roshan Balasaheb BhagwatNashikNashik
Vrushali Roshan BhagwatNashikNashik
Ridhey Roshan BhagwatNashikNashik
Akash Balasaheb BhagwatNashikNashik
Ramnath Kisan BhagwatNashikNashik
USHA RAMNATH BHAGWATNashikNashik
AJIT RAMNATH BHAGWATNashikNashik
ADESH AJIT BHAGWATNashikNashik
VAISHALI AJIT BHAGWATNashik RoadNashik
AVANI AJIT BHAGWATNashikNashik
SHARAD RAMNATH BHAGWATNashikNashik
RATNA SHARAD BHAGWATNashikNashik
ARADHYA SHARAD BHAGWATNashikNashik
SHIVNANDAN SHARAD BHAGWATNashikNashik
YOGITA PRAVIN KHARJULNashikNashik
LILA SHIVAJI BHAGWATNashikNashik
VIKAS SHIVAJI BHAGWATNashikNashik
Vandana Vikas BhagwatNashikNashik
Aaryan Vikas BhagwatNashikNashik
VISHAL SHIVAJI BHAGWATNashikNashik
POONAM VISHAL BHAGWATNashikNashik
RUDRAKSH VISHAL BHAGWATNashikNashik
MONIKA SAMADHAN DHOKANENashikNashik
UTTAM KISAN BHAGWATNashikNashik
KALPANA UTTAM BHAGWATNashikNashik
PRAVIN UTTAM BHAGWATNashikNashik
SAVITA PRAVIN BHAGWATNashikNashik
PURVI PRAVIN BHAGWATNashikNashik
NAYAN UTTAM BHAGWATNashikNashik
MAYURI SUDHAKAR PORJENashikNashik

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI4576.41
Proposed, not sanctioned4,576 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3A S NO 17C-5 AND 6 OF DEOLALI SHIWAR STAR ZONE MALL NASHIK ROAD NASHIK 422011
Estimated costRs 12.57 cr
Cost incurredRs 8.15 cr
Work done64.88%
BuildingWingEstimatedIncurred
SHIV CRYSTAL C WINGNARs 9.51 crRs 5.60 cr
SHIV CRYSTAL A WINGNARs 1.63 crRs 1.63 cr
SHIV CRYSTAL B WINGNARs 93.13 lakhRs 93.13 lakh
-NARs 50.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectER Raju Ghodeshwar
EngineerEr Ashish D Kale
EngineerEr Vaibhav sanjay Rikame
Chartered AccountantCA Narayan Dattu Dhatrak
Chartered AccountantCA VISHAL PRAKASH MAHAPURE
PartnerRole in project
JAIDEEP CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51600054495/WarMar 2030 → Jul 2030

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2030

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 30 06 2026.pdf18 Sep 2026
Withdrawal Update Form 2File: Form 2 June 2026.pdf18 Sep 2026
Withdrawal Update Form 3File: Form-3 June.pdf18 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A-31 03 2026.pdf18 Sep 2026
Form 5 (FY 2025-2026)File: Form 5.pdf12 Sep 2026
Withdrawal Update Form 1File: Form-1.pdf27 May 2026
Withdrawal Update Form 2File: Form-2.pdf27 May 2026
Withdrawal Update Form 3File: Form-3-31 March 2026.pdf27 May 2026
Withdrawal Update Form 1File: FORM-1-31 12 2025.pdf19 Mar 2026
Withdrawal Update Form 2File: Form-2 31 dec 2025.pdf19 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec.pdf19 Mar 2026
Withdrawal Update Form 1File: Form-1.pdf2 Feb 2026
Withdrawal Update Form 2File: FORM-2.pdf2 Feb 2026
Withdrawal Update Form 3File: Form-3.pdf2 Feb 2026
Form 2A (FY 2024-2025)File: Shiv Crystal Form-2A.pdf7 Jan 2026
Withdrawal Update Form 1File: Form-1 30 06 2025.pdf27 Nov 2025
Withdrawal Update Form 2File: Form-2 30 06 2025.pdf27 Nov 2025
Withdrawal Update Form 3File: form 3.pdf27 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf29 Sep 2025
Form 3File: form 3.pdf11 Jun 2025
Form 2File: Form-2.pdf11 Jun 2025
Form 1File: Form 1 Shiv Crystal.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf11 Jun 2025
OthersFile: form-2A-24-25.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 SEP 24- SHIV CRYSTAL.pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-30 09 2024.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: sold and unsold.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: sold and unsold Sep.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Jaideep.pdf11 Oct 2024
Form 5 (FY 2023-2024)File: FORM-5.pdf2 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 jaideep.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 JAYDEEP.pdf30 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form- 2A jaideep.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: sold.pdf30 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Jaideep construction.pdf30 May 2024
Details of encumbrances concerned to FinanceFile: Title Search Bhagwat.pdf15 Jan 2024
Details of encumbrances concerned to LegalFile: Title Search Bhagwat.pdf15 Jan 2024
Other - LegalFile: Title Search Bhagwat.pdf15 Jan 2024
Other - LegalFile: Title Search report Bhagwat New_removed.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_Jaideep.pdf28 Nov 2023
Copy of the legal title reportFile: LEGAL TILE REPORT RERA.pdf26 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf26 Nov 2023
Proforma of Agreement for saleFile: AGREEMENT TO SALE_11zon.pdf26 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRESTE ON OTHER ESTATE land owner.pdf21 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK DETAILS.pdf21 Nov 2023
Declaration in FORM BFile: Form -B PARTNER.pdf20 Nov 2023
Other - LegalFile: CONFIRAMATION DEED DA JAIDEEP-2023.pdf20 Nov 2023
Layout approvalFile: layout.pdf14 Nov 2023
Building plan approvalFile: BUILDING PLAN 1.pdf14 Nov 2023
Building plan approvalFile: BUILDING PLAN 2.pdf14 Nov 2023
Building plan approvalFile: BUILDING PLAN 3.pdf14 Nov 2023
PAN CardFile: PAN CARD FIRM.pdf14 Nov 2023
Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMRANCES CONSERNED TO FINANCE.pdf14 Nov 2023
Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMRANCES CONSERNED TO LEGAL.pdf14 Nov 2023
Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMRANCES CONSERNED TO FINANCE.pdf14 Nov 2023
Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMRANCES CONSERNED TO LEGAL.pdf14 Nov 2023
Copy of Layout Approval (in case of layout)File: layout.pdf14 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1.pdf14 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 2.pdf14 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 3.pdf14 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENEMENT CERTIFICATE.pdf14 Nov 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE FORMAT -D.pdf14 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf14 Nov 2023
CERSAI detailsFile: CERSAI_Search_Report_200286563946_For_Asset_Based_Search_13_11_2023_13_06_19_964.pdf14 Nov 2023
CERSAI detailsFile: DECALARATION CRESAI.pdf14 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRESTE ON OTHER ESTATE ORG - GIRISH.pdf14 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRESTE ON OTHER ESTATE ORG - KAILAS.pdf14 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRESTE ON OTHER ESTATE ORG - PRAVIN.pdf14 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTRESTE ON OTHER ESTATE ORG -SANDIP CHAKANE-.pdf14 Nov 2023
Proforma of Allotment letterFile: ALLOTEMENT LETTER.pdf14 Nov 2023
Deviation Report with respect to Allotment letterFile: DECLARATION OF NO DEVIATION MODEL COPY OF ALLOTEMENT LETTER.pdf14 Nov 2023
Deviation Report with respect to model copy of AgreementFile: DECLARATION OF NO DEVIATION MODEL COPY OF AGREEMENT.pdf14 Nov 2023

How this compares with Nashik

33%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 4 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHIV CRYSTAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SR NO 190/2 NEAR BHAGWAT PLAZA SAMANGAON ROAD SINNAR PHATA NASHIK ROAD4,100+ in Nashik

Builder: JAIDEEP CONSTRUCTION

JAIDEEP CONSTRUCTION has 4 registrations on MahaRERA, including VISHNU HEIGHTS and GAJANAN SMRUTI. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHIV CRYSTAL is delayed beyond 31 Jul 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHIV CRYSTAL?

The registered promoter entity is JAIDEEP CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHIV CRYSTAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHIV CRYSTAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHIV CRYSTAL?

The professionals named in the filing: Architect: ER Raju Ghodeshwar; Engineer: Er Ashish D Kale; Engineer: Er Vaibhav sanjay Rikame; Chartered Accountant: CA Narayan Dattu Dhatrak; Chartered Accountant: CA VISHAL PRAKASH MAHAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHIV CRYSTAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHIV CRYSTAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHIV CRYSTAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.